Violations at 79-01 Broadway
Queens, NY 11373 · BBL 4-01500-0002 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
The newest 50 of 253 DOB violations. The city keeps the complete history.
- Construction other optional
At the time of inspection of 6 floor parking garage i observed at 2nd,3rd,4th,5th floors at 41 avenue side close to stairs, rusted structural load bearing steel beams with chunks separating and falling
Apr 28, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 30, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 20, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 20, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 20, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 20, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 20, 2020
Dob violation - resolved - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 external high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 12, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 12, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 18, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 17, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 17, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 17, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 17, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2018
Dob violation - resolved - Facade safety program facade required
Fisp-facade safety program facade required
Jan 23, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 17, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 12, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 12, 2017
Dob violation - resolved - High pressure boiler boiler required
Violation issued for failure to file 2015 annual high pressure boiler inspection
Jun 23, 2017
Dob violation - dismissed - High pressure boiler boiler required
Violation issued for failure to file 2015 annual high pressure boiler inspection
Jun 23, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 8, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 8, 2016
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 18, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 18, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 18, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 18, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 18, 2015
Dob violation - resolved
ECB violations
The newest 50 of 72 ECB violations. The city keeps the complete history.
- Class - 2
The elevator in building out of service . upon inspection the device is found to be out of service creating a hazardous condition as per 1rcny 11- 02 . restore to servive immediately and notify nycdob the devic
Mar 5, 2026 · Penalty $1,562
Resolve - Class - 2
At time of inspection observed: suspended scaffold using outrigger and c-hooks at exposure# 1-2-4 upon review department record it appear not notification for outrigger suspended scaffold, creating an unsafe co
Sep 4, 2025 · Penalty $10,000
Active - Class - 2
At time of inspection observed: suspended scaffold using outrigger and c-hooks at exposure# 1-2-4 unsafe contrary to code: suspended elements not kept vertical and, in a plane, parallel to the wall, jumping set
Sep 4, 2025 · Penalty $10,000
Active - Class - 2
During inspection i observed that there was no info panel affixed to the upper panel of the sidewalk shed, which is required by code, for identification of the site. obtain and install info panel as required.
Sep 11, 2024 · Penalty $6,250
Active - Class - 2
During inspection of the sidewalk shed, i observed that there were no lights bulbs installed under the sidewalk shed. the lack of lights creates a dark and potentially dangerous area for crime during dusk and d
Sep 11, 2024 · Penalty $10,000
Active - Class - 2
Pedestrian protection does not meet code specifications.note:at time of inspection observed sidewalk shed at exp #3 #4 deteriorated mudsills damaged wanting & unsecured parapet panel.unsecured & deteriorated wo
Mar 16, 2023
Resolve - Class - 2
Failure to maintain exterior building walls and appurtenances. as noted:at time of inspection i observed on exposure#1 south elevation step cracks on southwest corner of the 8th fl;bulging disintegrating masonr
Feb 11, 2022 · Penalty $1,250
Active - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. file application, install dlm, and perf
Apr 1, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code compliant manner. noted: rotten metal lintel and braces under staircase and landing at northeast staircase next to elevator on broadway and 78th st side. at the time
May 11, 2019
Active - Class - 1
Reissue va 353813265. failure to maintain building in code compliant manner. noted: rotten metal lintel and braces undser staircase and landing at northeast staircase next to elevators on broadway and
Mar 7, 2019
Active - Class - 1
Reissue 35372953y failure to maintain building in code compliant manner note:rotten metal lintels and braces under staircase and landing at northeast staircase from 1st floor thru 6th floor in parking
Jan 11, 2019
Active - Class - 1
Failure to maintain bldg in code compliant manner. noted: i observed rotted metal lintels & braced under concrete staircase landings at the east side stair well of parking garage from 1st thru 6th fl of stairwe
Nov 30, 2018
Active - Class - 1
Failure to maintain building in a code compliant manner.noted:i observed rotted metal lintels and rotted metal braces under concrete landings at east stair wells of parking garage from 1 to 6 stories approx. 40
Oct 18, 2018 · Penalty $6,250
Active - Class - 2
Failure to file acceptable amended cycle 8b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #810810.rem:file acceptable report
Aug 1, 2018
Active - Class - 1
Failure to maintain exterior building walls and appurtenances. at time of inspection, i observed on exposure #1 south elevation: - cracks at several floors also on exposure #4 south elevation. roof exposure: -
Jan 25, 2018
Active - Class - 1
Failure to take required measures to secure public safety from documented unsafe facade. as per 1rcny 103.04. facade technical report file. unsafe by pe/ra on 01/23/18 and no amended report filed as of 01/25/18
Jan 25, 2018
Active - Class - 1
Failure to maintain bldg in code-compliant manner. sprinkler system ateast wing 3rd flr is inoperative sprinkler system not connected to water supply on 3rd flr riser control valve. *photo taken* remedy: repair
Oct 1, 2013
Resolve - Class - 1
Failure to have new/altered plumbing system tested. observed new piping and new sprinkler heads installed in east wing 3rd flr. no inspectios or test on file. *photo taken* remedy: perform test.
Oct 1, 2013
Resolve - Class - 1
Work w/o a permit. observed new piping and new sprinkler heads installed in east wing 3rd flr lab. *photo taken* remedy: obtain permit
Oct 1, 2013
Resolve - Class - 2
Failure to post dot permit for street closing/sidewalk closing.noted:no dot permit posted for sidewalk closing at front along 41 avenue, forjob #420333712-nb. rmdy: post active dot permits as required.
Apr 13, 2013
Resolve - Class - 2
Bc3301.9.5 missing sign on sidewalk shed. noted: sidewalk shed erectedfor job #420333712-nb has no sign stating contractor, permit number & expiration. rmdy: provide/replace sidewalk shed sign.
Apr 13, 2013
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction - no guardrails. noted: new bldg erected under job #420333712-nb is missing &/or has no guardrails at front (along 41 ave) left
Apr 13, 2013 · Penalty $2,400
Resolve - Class - 1
Sec. 3301.2 failure to protect all persons - uncovered openings. noted: new bldg construction site under job #420333712-nb w/uncovered deck openings & holes at various locations on 1st & 2nd floors creating a
Apr 13, 2013 · Penalty $1,600
Resolve - Class - 2
Job site fence not erected pursuant to subsection. noted: job site fence erected under job #420333712-eq-fn is defective. 6'high chain link fence is installed throughout and not 8'high solid continuous.rmdy:
Apr 13, 2013
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations rem:
Sep 20, 2010
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancew/code provisions: periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations.
Feb 17, 2010 · Penalty $2,000
Active - Class - 2
Failure to file an amended sixth round report acceptable to this dept.indicating correction of unsafe conditions described in initial local law 11/98 report remedy:file an amended report following remedial repa
Dec 19, 2008
Resolve - Class - 1
Licensed rigger failed to ensure scaffold workers met minimum requirements. observed: workers on scaffold at exposure 3 w/ou certificate of fitness. remedy: comply w/the code.
Sep 30, 2008 · Penalty $1,600
Active - Class - 2
Failure to provide approved plans at jobsite at time of insp observed workers on site unable to provide cd5 for outrigger beams use rem: provide cd5
Sep 30, 2008 · Penalty $500
Active - Class - 2
Failed to notify dob prior the installation of outrigger beams in connection of susp scaffolds observed workers on scaffold suspended from outrigger beams at exp 3 w/o notification rem: notify the dept
Sep 30, 2008 · Penalty $800
Active - Non-hazardous
Altered bldg occupied w/o a valid cofo noted:temporary cofo # 401382785t002 has exp. on 11.16.05 remedy:obtain valid cofo for current use.
Dec 21, 2007
Active - Non-hazardous
50a/50b. 50-the manhiles of the mud drums need to be cleaned better behind the knuckle on all four manhole openings.50b-the center of the steam drum must be properly cleaned.
Jun 13, 2005
Resolve - Hazardous
Failure to file an amended fifth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedial
Dec 20, 2004
Resolve - Hazardous
Failure to file an amended fifth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following
Oct 18, 2004
Resolve - Non-hazardous
28a,32a.
Jul 20, 2004
Resolve - Hazardous
Failure to file an amended fifth round report acceptable to this department idicating correction of unsafe conditions described in initial local law 11/98 report.remedy:file an amneded report following remed
Apr 1, 2004
Resolve - Hazardous
Failure to file an amended fifth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report.remedy file an amended report following remedia
Dec 30, 2003
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department indicating correction of unsafe conditions described in initial ll11/98 report.remedy:file an amended report following remedial repair
Sep 30, 2003
Resolve - Hazardous
Failure to maintain exterior buildign wall. noted : dislodged, separating & cracked brick work, masonry lintels & concrete beam at various locations including 8th & 10th fl at broadway elevation; baxter ave ele
Jul 8, 2003
Resolve - Non-hazardous
Failure to file an amended five report acceptable to this department pursuant to rule r.c.n.y 32-03b(5),indicating correction of hazardous conditions described in initial ll11/98 report.remedy:file an amended
Mar 14, 2003
Resolve - Hazardous
Failure to file an amended round five report acceptable to this dept pursuant to rule r.c.n.y.32-03b(5),indicating correction of hazardous conditions described in initial ll11/98 report
Jan 13, 2003
Resolve - Hazardous
Failure to maintain exterior building wall noted:8ft.(approx)vertical crack approx.3/8'wide at 9th fl.of south elevation.missing bricks beside masonary roof canopy of north elevation.hair line cracks at bricks
Dec 3, 2002
Resolve - Hazardous
Failure to file an amemded round five report acceptable to this department pursuant rule r.c.n.y. 32.03b(5), indicating correction of hazardous conditions described in initial ll111/98 report. remedy: file an r
Nov 8, 2002
Resolve - Hazardous
Failure to file an amended round report acceptable to this department pursuant to rule r.c.n.y 32-03b(5), indicating correction of hazardous conditions described in initial 1ll11/98 report. remedy: file an amen
Sep 5, 2002
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll11/98 report. remedy: file an
Jul 5, 2002
Resolve - Hazardous
Failure to provide adequate protection for sidewalks and walkways during construction operations during repair of bricks at upper level of building brick chips had fallen to ground remedy stop all work except
Jul 2, 2002 · Penalty $5,000
Active - Hazardous
Failure to maintain exterior building wall defect is major cracks and macment at corners of paraper walls & set back at 7th floor also spalling of mortar joints through out facade. remedy : make safe immediatel
Mar 16, 2002 · Penalty $2,500
Resolve - Hazardous
Failure to maintain exterior of building. top course of the projected brick panel on the 6th floor in the count of building @ 71-09 broaday. 2nd course below the projected cast stone, that rests on the window h
Jan 4, 2002
Resolve - Non-hazardous
46k.
Dec 14, 1999
Resolve - Non-hazardous
73x, restore to service so an inspection can be made.
Dec 14, 1999 · Penalty $880
Resolve