roofy

33-25 90 Street

Queens, NY 11372BBL 4-01438-0001Map

Owner of record: Southridge Coop Section III

33-25 90 Street is an elevator apartment building built in 1957 in Queens, 11372. It has 360 residential units across 6 floors. The owner of record is Southridge Coop Section III. HPD has recorded 213 housing violations here, most recently on June 14, 2026. 30 of the 50 most recent violations are still open.

HPD violations
213
DOB violations
157
ECB violations
104
HPD complaints
208

Available now in this building

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jun 14, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. The newest 10 per agency here; the full lists are a click away.

HPD housing violations · 213

  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north located at apt 5m, 5th story, 1st apartment from north at east

    Jun 14, 2026 · Apt 5M

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from north located at apt 5m, 5th story, 1st apartment from north at east

    Jun 14, 2026 · Apt 5M

    Open — Nov sent out
  • CImmediately hazardous

    Provide ready access to buildings heating system door is locked at cellar story at boiler room

    Mar 25, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6x, 6th story, 2nd apartment from north at east

    Mar 25, 2026 · Apt 6X

    Closed — Violation closed
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1j, 1st story, 1st apartment from south at west

    Aug 5, 2025 · Apt 1J

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1j, 1st story, 1st apartment from south at west

    Aug 5, 2025 · Apt 1J

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroom located at apt 1j, 1st story, 1st apartment from south at west

    Aug 5, 2025 · Apt 1J

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 13, 2025

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Closed — Violation dismissed
See all 213 HPD violations (10 shown here)

DOB building violations · 157

  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)

    Aug 21, 2022

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Jun 20, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 12, 2021

    Dob violation - active
See all 157 DOB violations (10 shown here)

ECB violations · 104

  • Class - 2

    I observed installed in the garage area new installation of led light fixtures. no application on file with d.o.b., obtain permit., obtain permit

    Oct 17, 2024 · Penalty $4,000

    Active
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #910777. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $6,250

    Active
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #910775. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $6,250

    Active
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #910776. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $6,250

    Active
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #910772. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $6,250

    Active
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #910773. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $6,250

    Active
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #910774. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $6,250

    Active
  • Class - 1

    Owner failed to repair defective condition(west elevation-cracked window sill at 6th floor)within time frame recommend by qewi.qewi recommended repair be made by 1/21/2020.however,as of today 02/08/2021,no such

    Feb 8, 2021 · Penalty $12,500

    Active
  • Class - 2

    40m7. no access to machine room incomplete insp.

    Apr 26, 2018 · Penalty $1,562

    Resolve
  • Class - 2

    67x10 communication (phone) is not operative.

    May 23, 2017 · Penalty $500

    Resolve
See all 104 ECB violations (10 shown here)

Complaints

  • Heat/hot water

    Apartment only

    Apr 16, 2026 · Apt 6X

    Close
  • Heat/hot water

    Entire building

    Mar 25, 2026 · Apt BLDG

    Close
  • Water leak

    Damp spot

    Dec 18, 2025 · Apt 5M

    Close
  • Door/window

    Door

    Dec 14, 2025 · Apt 6X

    Close
  • Plumbing

    Steam pipe/riser

    Dec 9, 2025 · Apt 5D

    Close
  • Unsanitary condition

    Mold

    Jul 29, 2025 · Apt 1J

    Close
  • Heat/hot water

    Apartment only

    Feb 19, 2025 · Apt 4J

    Close
  • Heat/hot water

    Entire building

    Feb 18, 2025 · Apt 2W

    Close
  • Heat/hot water

    Entire building

    Feb 18, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 17, 2025 · Apt 4J

    Close
See all 208 HPD complaints (10 shown here)

Sales history

DatePriceTypeUnits
Sep 10, 2026$276,000Coops - elevator apartments—
Aug 13, 2026$320,000Coops - elevator apartments—
May 11, 2026$250,000Coops - elevator apartments—
Apr 3, 2026$240,000Coops - elevator apartments—
Feb 4, 2026$335,000Coops - elevator apartments—
Jan 29, 2026$320,000Coops - elevator apartments—
Jan 28, 2026$375,000Coops - elevator apartments—
Dec 18, 2025$238,290Coops - elevator apartments—
Dec 8, 2025$300,000Coops - elevator apartments—

Building details

Building type
Elevator apartment building (D4)
Year built
1957
Floors
6
Residential units
360
Building area
369,450 ft²
Lot area
115,000 ft²
Zoning
R7-1
Community board
403
Council district
25
Block / lot
1438 / 1
Assessed value
$9,694,350
Landmark / historic district
No

HPD registration #431243, last renewed Sep 29, 2026.

Questions about 33-25 90 Street

Who owns 33-25 90 Street?

The owner of record in NYC Department of City Planning PLUTO data is Southridge Coop Section III.

Does 33-25 90 Street have violations?

Yes. NYC HPD has recorded 213 housing violations at this property.

Is 33-25 90 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 33-25 90 Street built?

City records list 1957 as the year it was built.

How many apartments are in 33-25 90 Street?

It has 360 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.