roofy

40-43 69 Street

Queens, NY 11377BBL 4-01301-0007Map

Owner of record: Gurung, Sukh

40-43 69 Street is a two-family home built in 1910 in Queens, 11377. It has 2 residential units across 2.5 floors. The owner of record is Gurung, Sukh. HPD has recorded 30 housing violations here, most recently on August 14, 2025. 23 of the 30 most recent violations are still open.

HPD violations
30
DOB violations
2
ECB violations
7
HPD complaints
43

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Aug 14, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 30

  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from north at east

    Aug 14, 2025 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 2nd door frame from north at east wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east

    Aug 14, 2025 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame in the private hallway located at apt 2, 2nd story, 1st apartment from north at east

    Aug 14, 2025 · Apt 2

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Aug 14, 2025 · Apt 2

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective door at sink cabinet in the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    Aug 14, 2025 · Apt 2

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st closet from east at south wall door in the private hallway located at apt 2, 2nd story, 1st apartment from north at east

    Aug 14, 2025 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective connection wasteline at sink in the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    Aug 14, 2025 · Apt 2

    Open — Nov sent out
  • A

    Cleanse to the satisfaction of this department the the ceramic tiles surface with grouted joints of visible mold at eastand sosouth walls in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Aug 13, 2025 · Apt 1

    Closed — Violation dismissed
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Aug 13, 2025 · Apt 1

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Aug 13, 2025 · Apt 1

    Open — Nov sent out
Show 20 more ↓
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles at west wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Aug 13, 2025 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 1, 1st story, 1st apartment from west at north

    Aug 13, 2025 · Apt 1

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 2nd room from east located at apt 1, 1st story, 1st apartment from west at north

    Aug 13, 2025 · Apt 1

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective electrical outlet at north wall in the 2nd room from east located at apt 1, 1st story, 1st apartment from west at north

    Aug 13, 2025 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 3rd room from east located at apt 1, 1st story, 1st apartment from west at north

    Aug 13, 2025 · Apt 1

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Jul 8, 2025

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame in the private hallway located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Jul 7, 2025 · Apt 2NDFLO

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Jul 7, 2025 · Apt 2NDFLO

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Jul 7, 2025 · Apt 2NDFLO

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Jul 7, 2025 · Apt 2NDFLO

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st window frame from south at west wall in the 4th room from east located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Jul 7, 2025 · Apt 2NDFLO

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective lower sash spring balance at 1st window from west at north wall in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Jul 7, 2025 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Repair the broken or defective connection waste pipe at sink in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Jul 7, 2025 · Apt 2NDFLO

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from west at north wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Jul 7, 2025 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from east located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Jul 7, 2025 · Apt 2NDFLO

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from east at south wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Jul 7, 2025 · Apt 2NDFLO

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st closet from east at south wall door in the private hallway located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Jul 7, 2025 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Jul 7, 2025 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Jul 7, 2025 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective 5th concrete tread from bottom at stairs leading to 1st story at stoop, 1st story

    Mar 12, 2025

    Open — Nov sent out

DOB building violations · 2

  • Construction other optional

    C-construction other optional

    Jan 27, 1999

    Vw-violation work without permit - active
  • Construction other optional

    C-construction other optional

    Mar 8, 1997

    Vh-violation hazardous - active

ECB violations · 7

  • Hazardous

    Residence altered for occupancy as a dwelling for more than the legally approved # of families. dob records indicate residence is a legal 2 family. residence is now alter for occupancy as 3 family.

    May 13, 2006 · Penalty $3,050

    Resolve
  • Hazardous

    Work w/o permit. work noted:at cellar level installed gas line for stove @ kitchen:at rear of 1st flr installed water & waste line for 3 pc bathroom toilet,sink & shower. remedy:obtainn permit or restore

    May 13, 2006 · Penalty $800

    Resolve
  • Hazardous

    Occ.contrary to that of bldg dept records.a legal2fam.converted to an illegal1fam.w/2sro's.illegal occ.noted:attic lvl.1sro w/2bds.locking device on dr.2fl.1sro 1bd.front cooking plates/office pot sharing bthrm

    May 8, 2000 · Penalty $800

    Resolve
  • Hazardous

    Residence altered for occ.as a dwelling for more than the legally approved#of families.bldg dept records which indicates residence legally.approved for2fam.residence now altered for occ.by1fam.w/2sro's.alter

    May 8, 2000

    Resolve
  • Non-hazardous

    Work without permits. work noted: partition walls erected throughout 1st & 2nd floors creating class "b" rooms. remedy: obtian permits if feasible or restore premises to prior legal condition.

    Jan 27, 1999 · Penalty $800

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by the building department records.from: a legal one family dwelling to: an illegal class "b" rooming house all floors. at 1st story = 4 class "b" rooms. 2nd floor 2 class

    Jan 27, 1999 · Penalty $800

    Resolve
  • Hazardous

    Work without a permit, illegal bsmt. apt. installed at bsmt level, work noted<; full partitions, with kitchen bath and bedroom. bath located outside in area of rear porch, at 1st fl. level. remedy: obtain

    Mar 8, 1997 · Penalty $350

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Aug 13, 2025 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Aug 13, 2025 · Apt 2

    Close
  • General

    Cabinet

    Aug 13, 2025 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Aug 13, 2025 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Aug 12, 2025 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Aug 12, 2025 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Aug 12, 2025 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Jul 6, 2025 · Apt 2NDFLO

    Close
  • Plumbing

    Basin/sink

    Jul 6, 2025 · Apt 2NDFLO

    Close
  • Door/window

    Window frame

    Jul 6, 2025 · Apt 2NDFLO

    Close
Show 33 more ↓
  • Electric

    Outlet/switch

    Jul 6, 2025 · Apt 2NDFLO

    Close
  • Water leak

    Slow leak

    Jul 6, 2025 · Apt 2NDFLO

    Close
  • Appliance

    Electric/gas range

    May 19, 2025 · Apt 2FLOOR

    Close
  • General

    Cabinet

    May 19, 2025 · Apt 2FLOOR

    Close
  • Unsanitary condition

    Pests

    May 19, 2025 · Apt 2FLOOR

    Close
  • Flooring/stairs

    Floor

    May 19, 2025 · Apt 2FLOOR

    Close
  • Water leak

    Slow leak

    May 19, 2025 · Apt 2FLOOR

    Close
  • Electric

    Outlet/switch

    May 19, 2025 · Apt 2FLOOR

    Close
  • Unsanitary condition

    Pests

    May 19, 2025 · Apt 2FLOOR

    Close
  • Plumbing

    Basin/sink

    May 19, 2025 · Apt 2FLOOR

    Close
  • Paint/plaster

    Wall

    May 19, 2025 · Apt 2FLOOR

    Close
  • Appliance

    Refrigerator

    May 19, 2025 · Apt 2FLOOR

    Close
  • Unsanitary condition

    Pests

    Jan 27, 2025 · Apt APT1

    Close
  • Unsanitary condition

    Mold

    Jan 27, 2025 · Apt APT1

    Close
  • Plumbing

    Basin/sink

    Jan 27, 2025 · Apt APT1

    Close
  • Plumbing

    Bathtub/shower

    Jan 27, 2025 · Apt APT1

    Close
  • Electric

    Outlet/switch

    Jan 27, 2025 · Apt APT1

    Close
  • Plumbing

    Basin/sink

    Jan 27, 2025 · Apt APT1

    Close
  • Unsanitary condition

    Pests

    Jan 27, 2025 · Apt APT1

    Close
  • Heat/hot water

    Apartment only

    Feb 17, 2024 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Feb 16, 2024 · Apt 1STFL

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2020 · Apt 1

    Close
  • Plumbing

    Water supply

    Apr 18, 2016 · Apt 1

    Close
  • Door/window

    Window frame

    Apr 18, 2016 · Apt 1

    Close
  • Water leak

    Damp spot

    Apr 18, 2016 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Apr 18, 2016 · Apt 1

    Close
  • Water leak

    Slow leak

    Apr 18, 2016 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Apr 18, 2016 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Apr 18, 2016 · Apt 1

    Close
  • Nonconst

    Vermin

    Aug 7, 2009 · Apt 1

    Close
  • Nonconst

    Vermin

    Aug 7, 2009 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Aug 7, 2009 · Apt 1

    Close
  • Plumbing

    Toilet

    Aug 7, 2009 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B2)
Year built
1910
Floors
2.5
Residential units
2
Building area
1,584 ft²
Lot area
1,700 ft²
Zoning
R5D
Community board
402
Council district
26
Block / lot
1301 / 7
Assessed value
$71,280
Landmark / historic district
No

HPD registration #929092, last renewed Sep 10, 2025.

Questions about 40-43 69 Street

Who owns 40-43 69 Street?

The owner of record in NYC Department of City Planning PLUTO data is Gurung, Sukh.

Does 40-43 69 Street have violations?

Yes. NYC HPD has recorded 30 housing violations at this property.

Is 40-43 69 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 40-43 69 Street built?

City records list 1910 as the year it was built.

How many apartments are in 40-43 69 Street?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.