roofy

Violations at 39-65 52 Street

Queens, NY 11377 · BBL 4-01238-0006 · Back to the property

HPD housing violations

8 HPD violations, newest first.

  • CImmediately hazardous

    M/d law abate the nuisance consisting of scalding hot water water above 130 degrees in the entire apartment located at apt 1b, 1st story, 2nd apartment from south at west , section at north

    Oct 18, 2026 · Apt 1B

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 12, 2024

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective at hopper in the compactor closet at public hall, 4th story, section at north

    Sep 12, 2023

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from east located at apt 4c, 4th story, 1st apartment from east at south , section at north

    Sep 12, 2023 · Apt 4C

    Open — Invalid certification
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 14, 2021

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 15, 2015

    Closed — Violation dismissed
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Apr 28, 2015

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 3rd room from north located at apt 1b, 1st story, 4th apartment from south at west

    Apr 28, 2015 · Apt 1B

    Closed — Violation dismissed

DOB building violations

27 DOB violations, newest first.

  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 11, 2020

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 31, 2018

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 25, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 25, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 25, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 25, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 25, 2016

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2013 inspection/test

    Oct 31, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2013 inspection/test

    Oct 31, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 12, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 22, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 22, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 27, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 27, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 11, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 12, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 12, 2005

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed

ECB violations

26 ECB violations, newest first.

  • Class - 2

    Failure to certify correction for violation 39142160x.., file a certificate of correction

    Aug 18, 2026 · Penalty $1,250

    Active
  • Class - 2

    Violation 39142160x no certificate of corrections filed, file a certificate of correction

    Jan 5, 2026 · Penalty $1,250

    Active
  • Class - 2

    Failure to maintain-parking structure.note:at the time of inspection on an active parking structure consisting of 1 level at grade observed spalled slab concrete,crack on floor,brick masonry wall deteriorating

    Oct 9, 2025 · Penalty $1,250

    Active
  • Class - 1

    Failure to maintain. failure to provide ada designated parking spots in occupied 11 story multiple dwelling., repair and/replace

    Mar 17, 2025

    Resolve
  • Class - 1

    Failure to maintain buildstation for ada tenants., repair and/replace

    Mar 17, 2025 · Penalty $12,500

    Active
  • Class - 1

    Failed to notify the department of an incident/accident that resulted in a fatality or an injury.a worker fell approx 8ft from a suspended scaffold.the worker was suffering from right shoulder pain.he was trans

    Dec 17, 2021 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to perform safe/proper insp of suspended scf.note:atoi,responding to incident where suspended scf collapsed injuring worker who was transported to hospital.failure to properly inspect component of suppo

    Nov 1, 2021

    Resolve
  • Class - 1

    Bc3301.8.1 tampering w/evidence note:atoi,responding to incident whereit was reported that during dismantlement of scf outrigger beam collapsed&suspended scf platform fell injuring worker who was transported to

    Nov 1, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    104-20k operating suspended scf w/o c/f.note:atoi,responding to incident where worker fell from suspended scf&suffered shoulder injury.upon request for cxof fitness for injured worker,none provided.provide c/f

    Nov 1, 2021

    Resolve
  • Class - 2

    Unsafe sws note:atoi,i observed sws erected@exp1,2,3 used as work platform for facade repair op (scf&material storage) i also observed that there were no safety measures in place to safeguard worker&users of sw

    Nov 1, 2021 · Penalty $2,400

    Resolve
  • Class - 2

    Work doesnt conform to approved const docs note:ato my insp,i observedoutrigger suspended scf directed&platform suspended w/cable attached to beam w/no truss support in place as shown on provided design drawing

    Nov 1, 2021

    Resolve
  • Class - 1

    Bc3314.4.3.1.1 parapet insp note:atoi,i observed suspended scf in place that has been in use.i also observed parapet clamps in place for tieback of scf.upon request for registered design prof report for parapet

    Nov 1, 2021

    Resolve
  • Class - 1

    Bc3314.4.3.2 installation insp note:atoi,responding to incident where it was reported that worker fell from suspended scf during scf dismantlement op,upon request for suspended scf installaton insp prior to use

    Nov 1, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Bc3314.4.3.1 insp prior to installation note:atoi,i observed suspendedscfs in place@exp3 where 1of them was being dismantled,upon request for insp report for suspended scfs prior to installation,none was provid

    Nov 1, 2021

    Resolve
  • Class - 1

    Failure to institute&maintain safety measures.note:atoi,responded to complaint3863548,where it was reported that worker fell from suspended scf,insp revealed that suspended scf dismantling op wasnt discussed du

    Nov 1, 2021

    Resolve
  • Class - 1

    Unlawful continued work while on notice of a stop work order.at time of recent inspection,observed 10 recessed light fixtures.100% installedin the lobby,ceiling,and functional.a stop work order was issued on 8/

    Oct 22, 2021 · Penalty $5,000

    Resolve
  • Class - 1

    Electrical work without a permit.note:at time of inspection at expo#1 of above premises, observed box lights removed(10)to be replaced by recessed lighting is being used.stop all work:except to make sites safe!

    Aug 19, 2020 · Penalty $800

    Resolve
  • Class - 2

    59b7,59bb7,68b7,42m17,42m17,26r11. 59b7-brake maint tag must have date; 59bb7-brake maintenance expired perform maint and tag device; 68b7-logbok out of date; 52m17-as per a17.1 2000/2003 controller must have

    Jul 7, 2017 · Penalty $250

    Resolve
  • Class - 1

    Cu-5110,59b7,59i10,57bb15,26r11,71q3,42m17,42m17,42m17,68b7,59bb07. 5a10-cease use item; door restrictor has been tampered with/disabled and rendered inoperative. this is a safety device to ensure elevator

    Jul 7, 2017 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to maintain exterior bldg facades and appurtenances.west elevation exp#1 loose/eroded mortar joint/crack coping stone at parapat wall or 9th floor level.east elevation, exp#3 loose/eroded mortar joint a

    May 16, 2017 · Penalty $500

    Active
  • Class - 2

    Failure to provide approved/accepted plans at job site at time of inspection: applicant requested sign-off under pro cert job #420350774 no approved plans presented to compare work completed. remedy: provide

    Sep 26, 2012

    Resolve
  • Non-hazardous

    46l,05#,15#,36e,36w, 46.replace broken shackle spring. 5-15. repair car door and shaftway door closes at oopens with no calls in repair door close timer.36.repair door not to rub buck and stick close,repair

    Apr 27, 1992

    Resolve
  • Non-hazardous

    36w,35l,22d,05#,15#.36e, 36.repair,door to open and close propely repair lock or replace to same 35 replace broken glass to windows. 22.secure from car top. 05-15 repair so door closes after it opens at fl.

    Apr 27, 1992

    Resolve
  • Non-hazardous

    2811

    Jun 7, 1991

    Resolve
  • Non-hazardous

    28-11

    Jun 7, 1991

    Resolve
  • Non-hazardous

    46l

    Sep 20, 1990 · Penalty $75

    Resolve