roofy

Violations at 35-33 64 Street

Queens, NY 11377 · BBL 4-01204-0001 · Back to the property

HPD housing violations

The newest 50 of 250 HPD violations. The city keeps the complete history.

  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame, 1st door frame from east at south wall, 1st window frame from north at east wall in the 1st room from north at east located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Certification postponment granted
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st room from north at west located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Certification postponment granted
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the kitchen located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Certification postponment granted
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 3rd room from north at east located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Certification postponment granted
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at west wall, 1st closet from north at east wall door frame, 1st door frame from west at north wall, 1st door frame from east at south wall, 1st door frame from north at east wall in the 3rd room from north at west located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Certification postponment granted
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the foyer located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Certification postponment granted
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the foyer located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Certification postponment granted
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall, 1st door frame from east at south wall in the private hallway located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Certification postponment granted
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Nov sent out
  • ANon-hazardous

    Paint metal in accordance with dept. regulation the 1st riser from north at east wall in the 1st room from north at east located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Nov sent out
  • ANon-hazardous

    Paint metal in accordance with dept. regulation the 1st riser from north at east wall in the 3rd room from north at east located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the east wall, south wall in the 3rd room from north at east located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Nov sent out
  • ANon-hazardous

    Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the 3rd room from north at west located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Nov sent out
  • ANon-hazardous

    Paint metal in accordance with dept. regulation the 1st door from north at east wall in the foyer located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Nov sent out
  • ANon-hazardous

    Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the 1st room from north at east located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at 1st door from east at south wall, west wall, 1st door from east at south wall, west wall, 1st closet from west at north wall door in the 1st room from north at east located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at 1st closet from west at north wall door, 1st door from east at south wall, 1st door from east at south wall, 1st closet from west at north wall door frame, 1st closet from west at north wall door in the 1st room from north at west located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at south wall in the kitchen located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Nov sent out
  • ANon-hazardous

    Paint metal in accordance with dept. regulation at 1st riser from west at north wall in the kitchen located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at north wall, west wall in the kitchen located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall, east wall in the 3rd room from north at east located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Nov sent out
  • ANon-hazardous

    Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the 3rd room from north at east located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at east wall, north wall, north wall, 1st closet from north at east wall door, 1st closet from north at east wall wall, east wall, north wall, 1st closet from north at east wall door, 1st closet from north at east wall wall, east wall in the 3rd room from north at west located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Nov sent out
  • ANon-hazardous

    Paint metal in accordance with dept. regulation at 1st riser from south at west wall in the 3rd room from north at west located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at 1st door from north at east wall, 1st closet from south at west wall door frame, 1st closet from south at west wall door, 1st closet from south at west wall door frame, 1st closet from south at west wall door, 1st closet from south at west wall door frame in the foyer located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at south wall, ceiling, south wall, ceiling in the private hallway located at apt 2e, 2nd story, 2nd apartment from south at west , section ''e''

    Sep 5, 2026 · Apt 2E

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 5th story, 1st apartment from north at east

    Jul 9, 2026 · Apt 5A

    Closed — Violation dismissed
  • ANon-hazardous

    Properly repair with similar material the broken or defective ceramic tiles at east wall in the kitchen located at apt 5a, 5th story, 1st apartment from north at east

    Jul 9, 2026 · Apt 5A

    Open — Civ14 mailed
  • ANon-hazardous

    Properly repair with similar material the broken or defective wood subfloor in the 1st room from north at east located at apt 5a, 5th story, 1st apartment from north at east

    Jul 9, 2026 · Apt 5A

    Closed — Violation dismissed
  • ANon-hazardous

    Properly repair or replace the broken or defective electric outlet cover at north wall in the 2nd room from north at west located at apt 5a, 5th story, 1st apartment from north at east

    Jul 9, 2026 · Apt 5A

    Closed — Violation dismissed
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 5a, 5th story, 1st apartment from north at east

    Jul 9, 2026 · Apt 5A

    Closed — Violation dismissed
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 5a, 5th story, 1st apartment from north at east

    Jul 9, 2026 · Apt 5A

    Closed — Violation dismissed
  • ANon-hazardous

    Properly repair or replace the broken or defective electric outlet cover plate at south wall in the bathroom located at apt 5a, 5th story, 1st apartment from north at east

    Jul 9, 2026 · Apt 5A

    Closed — Violation dismissed
  • ANon-hazardous

    Properly repair with similar material the broken or defective wood subfloor in the private hallway located at apt 5a, 5th story, 1st apartment from north at east

    Jul 9, 2026 · Apt 5A

    Closed — Violation dismissed
  • ANon-hazardous

    Refit entrance door in the 1st room from north at west located at apt 5a, 5th story, 1st apartment from north at east

    Jul 9, 2026 · Apt 5A

    Open — Civ14 mailed
  • ANon-hazardous

    Properly repair with similar material the broken or defective wood subfloor in the 1st room from north at west located at apt 5a, 5th story, 1st apartment from north at east

    Jul 9, 2026 · Apt 5A

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    Oct 29, 2025 · Apt 4A

    Closed — Violation dismissed
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 5b, 5th story, 1st apartment from east at south

    Oct 22, 2025 · Apt 5B

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 5b, 5th story, 1st apartment from east at south

    Oct 22, 2025 · Apt 5B

    Closed — Violation dismissed
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 5b, 5th story, 1st apartment from east at south

    Oct 22, 2025 · Apt 5B

    Closed — Violation dismissed
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 5b, 5th story, 1st apartment from east at south

    Oct 22, 2025 · Apt 5B

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective in the bulkhead hinge in the public hall stairs located at public parts, 5th story, section ''h'', 1st from west at north

    Oct 7, 2025

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 3g, 3rd story, 1st apartment from west at north , section ''fg'', 2nd from west at north

    Oct 7, 2025 · Apt 3G

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective in the bulkhead hinge in the public hall stairs located at public parts, 5th story, section ''ab'', 2nd from east at south

    Oct 7, 2025

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east , section ''f-g-h''

    Jan 29, 2025 · Apt 3F

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east , section ''f-g-h''

    Jan 29, 2025 · Apt 3F

    Open — Notice of issuance sent to tenant
  • BHazardous

    Repair or replace the smoke detector defective in the entire apartment located at apt 1h, 1st story, 1st apartment from south at west

    Jan 14, 2025 · Apt 1H

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1h, 1st story, 1st apartment from south at west

    Jan 14, 2025 · Apt 1H

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide ready access to buildings heating system door lock at basement at boiler room

    Jan 14, 2025

    Open — Nov sent out
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment located at apt 1h, 1st story, 1st apartment from south at west

    Jan 14, 2025 · Apt 1H

    Closed — Violation dismissed

DOB building violations

11 DOB violations, newest first.

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2023

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jan 15, 2010

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Nov 5, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed

ECB violations

7 ECB violations, newest first.

  • Class - 2

    Sec. 28-210.1 residence converted,maintained,or occupied as a dwellingfor more that the legally approved # of families. noted: dob records indicates apt#2c,2nd fl to be class'a'apt. the apt has been illegally c

    Jul 13, 2018 · Penalty $620

    Resolve
  • Class - 1

    B154,50a,50b,50c,50d,50e,50f,50g,50h. 50a-water leaking from chamber;50b-cannot have more than one control on 1/4"piping; 50c-guard missingrating plate on 1 -relief valve cannot see; 50e-gapper and disclosure

    Mar 2, 2015 · Penalty $1,000

    Resolve
  • Class - 2

    Work does not conform to approved construction documents/amendments insp dwg 1/20/05. premises under pc job alt 2 402077701 on an expired folder 4/7/05. noted: 1) for apt 4d plans indicate new partition walls

    May 29, 2009 · Penalty $250

    Resolve
  • Class - 1

    Inadequate safety measures:use of hoisting equipment in an unsafe manner.observed at exposure two, a 2pt supp scaffold from c hooks.1-hooks on stirrups w/o lock.2-tiebacks of c-hooks on angle & attached to same

    Apr 28, 2009 · Penalty $4,800

    Resolve
  • Class - 2

    Failed to notify dob prior the installation of chooks in connection w/susp scaffolds.observed at exposure two a 2pt susp scaffold from chooks w/o a notification at time of inspection.remedy:notify dob.

    Apr 28, 2009 · Penalty $800

    Resolve
  • Non-hazardous

    Failure to maintain.noted:excessive const. debris (sheetrock and lumber) throughout apartment 4d,one room have approx. 30 garbage bags filled with debris.remedy:remove debris,maintain property.

    Dec 9, 2004 · Penalty $800

    Resolve
  • Non-hazardous

    Work without a permit.work noted:apartment 4d was gutted out.wall framings,enlarged an reduced interior door openings,gas stove removed and all fixtures exposed electrical wires,rough electric work.note:99%of s

    Dec 9, 2004 · Penalty $500

    Resolve