roofy

86-05 25 Avenue

Queens, NY 11369BBL 4-01098-0058Map

Owner of record: Islam, Tahmina

86-05 25 Avenue is a two-family home built in 1949 in Queens, 11369. It has 2 residential units across 2 floors. The owner of record is Islam, Tahmina. HPD has recorded 29 housing violations here, most recently on March 14, 2022.

HPD violations
29
DOB violations
5
ECB violations
4
HPD complaints
46

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Mar 14, 2022

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 29

  • C

    Properly repair the broken or defective lock to building entry door at public hall

    Mar 14, 2022

    Closed — Violation dismissed
  • B

    Provide a safe and adequate supply of electric service to the fixtures ... at public hall

    Mar 14, 2022

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from east at south located at apt 1fl, 1st story

    Aug 31, 2013 · Apt 1FL

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color west wall in the 1st room from east at south located at apt 1fl, 1st story

    Aug 31, 2013 · Apt 1FL

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective caulking between all windows at all rooms at 2nd story exterior wall in the entire apartment located at apt 2fl, 2nd story

    Aug 31, 2013 · Apt 2FL

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective window counter balance upper and lower sash in the entire apartment located at apt 2fl, 2nd story

    Aug 31, 2013 · Apt 2FL

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story

    Aug 31, 2013 · Apt 2FL

    Closed — Violation dismissed
  • C

    Provide adequate supply of hot water for the fixtures bathroom and kitchen in the entire apartment located at apt 1fl, 1st story

    Aug 31, 2013 · Apt 1FL

    Closed — Violation closed
  • C

    Provide adequate supply of hot water for the fixtures bathroom and kitchen in the entire apartment located at apt 2fl, 2nd story

    Aug 31, 2013 · Apt 2FL

    Closed — Violation closed
  • C

    Properly secure the loose metal flue pipe at 2nd story east exterior wall , 2nd story

    Aug 31, 2013

    Closed — Violation dismissed
Show 19 more ↓
  • C

    Provide adequate supply of hot water for the fixtures bathroom and kitchen in the entire apartment located at apt 2fl, 2nd story

    Aug 31, 2013 · Apt 2FL

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at ceiling in the 2nd room from east at south located at apt 2fl, 2nd story

    Nov 29, 2012 · Apt 2FL

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 2nd room from east at south located at apt 2fl, 2nd story

    Nov 29, 2012 · Apt 2FL

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the 2nd room from east at south located at apt 2fl, 2nd story

    Nov 29, 2012 · Apt 2FL

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 2nd room from north at west located at apt 2fl, 2nd story

    Sep 22, 2012 · Apt 2FL

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over ceiling in the 2nd room from north at west located at apt 2fl, 2nd story

    Sep 22, 2012 · Apt 2FL

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective lower sash counter balance window in the 2nd room from north at east located at apt 2fl, 2nd story

    Sep 22, 2012 · Apt 2FL

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective upper sash counter balance window in the 1st room from north at east located at apt 2fl, 2nd story

    Sep 22, 2012 · Apt 2FL

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story

    Sep 22, 2012 · Apt 2FL

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1fl, 1st story

    Jul 10, 2011 · Apt 1FL

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 1fl, 1st story

    Jul 10, 2011 · Apt 1FL

    Closed — Violation dismissed
  • C

    Abate the nuisance consisting of concealed water leak at ceiling. in the bathroom located at apt 1fl, 1st story

    Jul 10, 2011 · Apt 1FL

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 1fl, 1st story

    Aug 21, 2010 · Apt 1FL

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of evidence of leak at ceiling in the bathroom located at apt 1fl, 1st story

    Aug 21, 2010 · Apt 1FL

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 1, 1st story

    Nov 13, 2008 · Apt 1

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1fl, 1st story

    Jun 29, 2008 · Apt 1FL

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling at bathroom located at apt 1fl, 1st story

    Jun 29, 2008 · Apt 1FL

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1fl, 1st story

    Jun 29, 2008 · Apt 1FL

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1fl, 1st story

    Jun 7, 2008 · Apt 1FL

    Closed — Violation dismissed

DOB building violations · 5

  • Construction other optional

    Emergency work order.it was reported that the rear brick facade at exp 3 on 9/15/2024.remaining.remaining wall at risk of collapse.ownr to immed rtain nyspe&dob reg gc to 1.prtlly demo rear exp3 brck facade& brace/stbilize rmaining wall,2.temp wthrprf

    Sep 16, 2024

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain. noted: rear yard wall facade is bulging and bowing up to 12 inches depth along length of property line also cracks in mortar throughout. at front (exp #1) vertical cracks in brick mortar at corner of exposure #1 and #4 and cracks throughout. at right side yard (exp #4): fa ade has multiple cracks in mortar throughout.

    Aug 29, 2024

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain. noted: observed at exp #1 above front door horizontal cracks in mortar (approx. 10 ft length). exp #1 below 2nd floor window step cracks in mortar (2 ft), below 1st floor window step cracks in mortar (1 ft). corner of exp #1 and #4 vertical crack in mortar (10 ft). exp #4 bet. 1st floor windows cracks in mortar approx.

    May 3, 2024

    Dob violation - dismissed
  • Construction other optional

    Building with brick facade of similar construction to 24-42 to 24-54 86 street with severely bulging wall.wall require investigation/rpairs ownr rtain pe/qewi to sbmt rprt to feu by 6/7/24 if req'd,rpair undr prmt strtng by 8/5/24,&cmpltd/sgnd off 9/27/24

    Apr 29, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 7, 2021

    Dob violation - dismissed

ECB violations · 4

  • Class - 2

    Failure to maintain building in code-compliant manner. note: observed excessive debris stored at rear of this location creating a potential fire hazard in violation of construction and fdny regulations., repair

    Sep 26, 2025 · Penalty $3,125

    Resolve
  • Class - 1

    Failure to maintain building in a code compliant manner. premises is a 2 family dwelling. large section of bricks approx 10x20 at exposure 3 between first and second floors fell into rear yard, repair and/repla

    Sep 15, 2024 · Penalty $1,280

    Resolve
  • Class - 1

    Found navien boiler installed without permit, obtain permit; obtain permit submit certificate of correction

    Apr 5, 2021

    Resolve
  • Class - 2

    Found navien gas fired boiler in basement not registered, maintain boiler; correct violating condition submit certificate of correction

    Apr 5, 2021

    Resolve

Complaints

  • Paint/plaster

    Wall

    Oct 20, 2026 · Apt BASEME

    Close
  • Water leak

    Damp spot

    Oct 20, 2026 · Apt BASEME

    Close
  • Plumbing

    Steam pipe/riser

    Oct 20, 2026 · Apt BASEME

    Close
  • Electric

    No lighting

    Jul 12, 2025 · Apt 1STFL

    Close
  • Electric

    No lighting

    Jun 25, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 24, 2024 · Apt 1FLOOR

    Close
  • Door/window

    Door

    Sep 13, 2024 · Apt 1

    Close
  • Door/window

    Door

    Dec 26, 2023 · Apt 1STFLO

    Close
  • Electric

    No lighting

    Dec 26, 2023 · Apt 1STFLO

    Close
  • Door/window

    Door

    Nov 14, 2022 · Apt 1

    Close
Show 36 more ↓
  • Door/window

    Door

    Nov 14, 2022 · Apt 1

    Close
  • Door/window

    Door

    Nov 8, 2022 · Apt 1FL

    Close
  • Door/window

    Door

    Nov 1, 2022 · Apt 1FL

    Close
  • Door/window

    Door

    Feb 28, 2022 · Apt 1

    Close
  • Door/window

    Door

    Dec 2, 2021 · Apt 1FL

    Close
  • Electric

    No lighting

    Dec 2, 2021 · Apt 1FL

    Close
  • Plumbing

    Boiler

    Dec 13, 2020 · Apt 1

    Close
  • Heating

    Heat related

    Aug 19, 2013 · Apt NA

    Close
  • Plumbing

    Toilet

    Aug 13, 2013 · Apt 2FL

    Close
  • Plumbing

    Water-leaks

    Aug 13, 2013 · Apt 2FL

    Close
  • General

    Windows

    Aug 13, 2013 · Apt 2FL

    Close
  • Plumbing

    Water supply

    Aug 13, 2013 · Apt 2FL

    Close
  • Paint/plaster

    Ceiling

    Dec 21, 2012 · Apt 2FL

    Close
  • Plumbing

    Water-leaks

    Dec 21, 2012 · Apt 2FL

    Close
  • Paint/plaster

    Ceiling

    Nov 16, 2012 · Apt 2FL

    Close
  • Paint/plaster

    Ceiling

    Nov 16, 2012 · Apt 2FL

    Close
  • Paint/plaster

    Ceiling

    Nov 16, 2012 · Apt 2FL

    Close
  • Plumbing

    Water-leaks

    Nov 16, 2012 · Apt 2FL

    Close
  • Nonconst

    Vermin

    Aug 30, 2012 · Apt 2FL

    Close
  • Nonconst

    Vermin

    Aug 30, 2012 · Apt 2FL

    Close
  • General

    Windows

    Aug 30, 2012 · Apt 2FL

    Close
  • Paint/plaster

    Ceiling

    Aug 30, 2012 · Apt 2FL

    Close
  • Plumbing

    Water-leaks

    Aug 30, 2012 · Apt 2FL

    Close
  • Paint/plaster

    Ceiling

    Aug 30, 2012 · Apt 2FL

    Close
  • Heating

    Heat related

    Jan 23, 2012 · Apt 2FL

    Close
  • Plumbing

    Water-leaks

    Jul 23, 2010 · Apt 1FL

    Close
  • Plumbing

    Water-leaks

    Jan 12, 2010 · Apt 1FL

    Close
  • Plumbing

    Water-leaks

    Oct 30, 2009 · Apt 1FL

    Close
  • Nonconst

    Carbon monoxide

    Apr 22, 2009 · Apt 2

    Close
  • Nonconst

    Smoke detector

    Apr 22, 2009 · Apt 2

    Close
  • Nonconst

    Janitor/super

    Apr 22, 2009 · Apt 2

    Close
  • Nonconst

    Janitor/super

    Apr 22, 2009 · Apt 2

    Close
  • Nonconst

    Janitor/super

    Apr 22, 2009 · Apt 2

    Close
  • Heating

    Heat related

    Nov 11, 2008 · Apt 1

    Close
  • Heating

    Heat related

    Jun 23, 2008 · Apt 1FL

    Close
  • Heating

    Heat related

    Jun 2, 2008 · Apt 1FL

    Close

Sales history

DatePriceTypeUnits
Aug 25, 2026$770,000Two family dwellings2

Building details

Building type
Two-family home (B1)
Year built
1949
Floors
2
Residential units
2
Building area
1,400 ft²
Lot area
1,888 ft²
Zoning
R4
Community board
403
Council district
22
Block / lot
1098 / 58
Assessed value
$51,360
Landmark / historic district
No

Questions about 86-05 25 Avenue

Who owns 86-05 25 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Islam, Tahmina.

Does 86-05 25 Avenue have violations?

Yes. NYC HPD has recorded 29 housing violations at this property.

Is 86-05 25 Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 86-05 25 Avenue built?

City records list 1949 as the year it was built.

How many apartments are in 86-05 25 Avenue?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.