Violations at 79-02 21 Avenue
Queens, NY 11370 · BBL 4-00975-0001 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
28 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2018 external hgh pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - active - High pressure boiler boiler required
Violation issued - failure to file 2017 external high pressure boiler inspection
Mar 16, 2020
Dob violation - active - High pressure boiler boiler required
Violation issued for failure to file 2016 annual high pressure boiler inspection
Jun 22, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Facade facade optional
Ll1080-local law 10/80 - facade facade optional
Jul 1, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - active - Plumbing none
Fd
Feb 3, 1993
Dob violation - active - Construction other optional
C-construction other optional
Aug 31, 1992
Vpw*-violation unserved ecb-work without permit-dismissed - Plumbing none
P-plumbing none
Mar 8, 1990
Dob violation - active - Plumbing none
P-plumbing none
Mar 8, 1990
Dob violation - dismissed
ECB violations
19 ECB violations, newest first.
- Class - 3
Work w/o a permit. noted: installed a wooden shed of approx 9'6"x4'6"x8'6"(height)in rear yard of the restaurant. no filling in dob records. this structure has a door of approx 30"wide x 80"height at time of
Dec 22, 2016 · Penalty $500
Active - Class - 2
Work w/o a permit. noted: at rear of restaurant/pizzeria erected an enlargement approx size 10' x 25' x 9'high. the structure built from metal, glass, plastice. work 100% completed. remedy: obtain permit to
Jan 5, 2014 · Penalty $4,000
Active - Class - 3
Work does not conform to approved construction documents or amendments. noted: 1 rear canopy web (struss), steel supports, 4" steel columns,traffic,(bollards)not installed as shown dwg #420506312 dated 11.21.11
Jan 24, 2013
Resolve - Class - 2
Sec. 28-116.4 misc viols. sign off completed work. alt 3 #420506312 inst'n of new breezeway canopy of rear yard of cleaners. work completed & permit expired 8/5/12 & job not signed off & no approved plans
Sep 10, 2012 · Penalty $800
Resolve - Class - 2
Occupancy contrary to that allowed by the cert of occupancy#59694 11/18/49 legal use permits (10)stores & @ time of inspections stores were combined to make (7)stores.79-02(cand store)79-06(dry-cleaners)79-08(
Jun 14, 2011 · Penalty $1,200
Active - Class - 1
Bc1001.3)failure to maintain egress clear & unobstructed.noted @ top of exterior exit stair @ rear of bldg is a approx 2' wall @ gate also bottom of stair has excessive debris in front of exit door.remove all o
Aug 13, 2010 · Penalty $1,600
Resolve - Class - 1
Failure to maintain bldg in a code compliant manner.noted stair @ rear of bldg leading from cellar have several steps cracked & deteriorating upper section of stair missing hand rail & accumulation of debris @
Aug 13, 2010 · Penalty $1,000
Resolve - Class - 1
Work w/o a permit premises under pc altii 410158555 exp 10/29/09 note at time of insp found interior of premises completely gutted plumbing removed at area of noted restroom floor has been removed throughout &
Aug 5, 2010 · Penalty $8,000
Resolve - Class - 2
Failure to file a cofc for vio #34809878x remedy:file cofc
Feb 16, 2010 · Penalty $800
Resolve - Class - 1
Total obstruction of exit passageway. 1st flr side exit padlocked alsocellar exit to rear staircase metal gate padlocked at time of inspection. remedy: remove padlock when store's occupied by any person.
Oct 2, 2009 · Penalty $1,200
Resolve - Class - 1
Failure to maintain building in code-compliant manner: unobstructed exit passageway noted exit passageway located at rear of cellar pad lock during business hours. remedy: remove obstruction.
May 11, 2009 · Penalty $1,200
Resolve - Hazardous
Work w/o a permit work noted at rear of property an awning was erected a slab was poured approx 20'x15' steel tuding and trusses were installed and aluminum awning installed over the steel 2x4 were also
Jan 12, 2008
Resolve - Non-hazardous
34b. 2002 hurst n.b. 332
May 2, 2005
Resolve - Non-hazardous
49-leftside of boiler(wallside)not accessible for inspection.receipt for welded holes leya certified welder holding r stamp to submit.bottom blow down nipple from the boiler corroded,leaking to replace.
Aug 21, 2000
Resolve - Non-hazardous
16
Dec 18, 1998
Resolve - Hazardous
Boilers
May 2, 1997
Resolve - Hazardous
3a. flue pipe corroded on the top near the brick chimney section be replaced to avoid fumes.
Aug 10, 1995 · Penalty $250
Active - Hazardous
3a,
Jul 21, 1994
Resolve - Hazardous
Egress violations. exit door: total obstruction. exit from basement does not open properly also obstruction at top of stairs from base- ment to 1st floor by counter and floor.
Aug 31, 1992
Resolve