roofy

Violations at 21-59 78 Street

Queens, NY 11370 · BBL 4-00974-7501 · Back to the property

HPD housing violations

14 HPD violations, newest first.

  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story

    Mar 16, 2006 · Apt 2

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 2nd story

    Apr 20, 2005 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department north wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from north at east

    May 20, 2004 · Apt 2

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from north located at apt 2, 2nd story, 1st apartment from north at east

    May 20, 2004 · Apt 2

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department walls and ceiling throughout in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from north at east

    May 20, 2004 · Apt 2

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective brickwork front at cellar window.

    Mar 10, 2003

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of concealed leak, ceiling and around windows, 2nd sty. apt. d32662h

    Mar 10, 2003

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department walls and ceiling 1 sty apt bathroom.

    Mar 10, 2003

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department radiators thru-out in the entire apartment located at apt 1a, 1st story

    Sep 21, 2000 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1a, 1st story

    Sep 21, 2000 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling south west corner in the 1st room from east located at apt 2, 2nd story

    Jun 15, 2000 · Apt 2

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color south wall in the room from north located at apt 2flr, 2nd story

    May 26, 2000 · Apt 2FLR

    Open — Nov sent out
  • BHazardous

    Repair the roof so that it will not leak over in the room from north located at apt 2flr, 2nd story

    May 26, 2000 · Apt 2FLR

    Open — Nov sent out
  • CImmediately hazardous

    Abate the nuisance consisting of mold and mildew ceiling and north wall in the bathroom located at apt 1c, 1st story

    Jan 13, 2000 · Apt 1C

    Closed — Violation dismissed

DOB building violations

7 DOB violations, newest first.

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 7, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 7, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 7, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 7, 2011

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - active

ECB violations

15 ECB violations, newest first.

  • Class - 2

    Observed in the basement installed bushing and union on gas line which is contrary to code section fgc 403.10.1.1 and fgc 411.1.6, repair and/or replace

    May 7, 2025 · Penalty $6,250

    Active
  • Class - 2

    Observed in basement installed gas line for gas dryer 90 percent of the work completed no permits on file, obtain all permits

    May 7, 2025 · Penalty $6,250

    Active
  • Class - 2

    Work without permit. at time of inspection in cellar i observed illegal gas line for illegal gas dryer for apartment a1. no permit on dob records to perform this work., obtain all permits

    Feb 10, 2025 · Penalty $6,250

    Active
  • Class - 2

    Failure to maintain building in code compliant manner. at time of inspection in cellar i observed illegal future tee on gas line for apartment a1- prohibited by 404.15 of nyc fgc, repair and/or replace

    Feb 10, 2025 · Penalty $3,125

    Active
  • Class - 2

    Failure to provide approved / accepted plans at job site at time of inspection at time of spot check inspection for gas roughing for all floors no plans on site job number 421693965, provide approved /accepted

    Dec 10, 2019

    Resolve
  • Class - 1

    Failure to provide/use lifeline while working on scaffold.noted:observed 2 workers on suspended scaffold w/o safety harness,1 harness was 1 ground the other was locates @ roof level,workers "sated"too hot to pu

    Jun 9, 2011 · Penalty $1,600

    Resolve
  • Class - 1

    Bc3314.6.2)lifeline anchorage shall be fastened to a fixed safe point of anchorage,shall be independent of the scaffold & shall be protected from sharp edges & abrasion.noted:no protection for life lines,life l

    Jun 9, 2011 · Penalty $800

    Resolve
  • Class - 1

    Licensed rigger failed to ensure scaffold work met min requirements.noted:1 worker on suspended scaffold did not have a cert of fitness issued by the rigger.rem:comply w/ code.

    Jun 9, 2011 · Penalty $1,600

    Resolve
  • Class - 1

    Licensed rigger designated an unqualified forearm.noted:1 of the workers not wearing a safety harness on suspended scaffold was issued a dob rigging foreman cert#12881 & issued to antonio mainato.make safe by r

    Jun 9, 2011 · Penalty $1,600

    Resolve
  • Class - 1

    Work w/o a permit: installation of clothes washing machine and gas dryer in cellar of apt bldg. illegal gas hookup, illegal drain connection, drain tied into fresh air inlet of bldg sewer. see photos. remedy:

    Sep 8, 2009 · Penalty $400

    Resolve
  • Class - 3

    B354,15,34b,48a,50,50a,b,c,d,e,f,g.50-missing brass syphon tube on steam gauge.50a-discharge pipe on pop safety to short.50b-boiler make up water piped into bottom of boiler & missing check valve.50c-shut off

    Sep 17, 2008

    Resolve
  • Hazardous

    Occupancy contrary to that of the bldg dept recrods.illegal occupancy noted legal 1 fam converted to an illegal 1 fam and living quarters.note:in cellar orth erected full height partitions creating a bedroom/li

    Apr 14, 2001 · Penalty $800

    Resolve
  • Hazardous

    Work without apermit.work noted:at cellar north storage are converted to living space with a 3pc bath,living room/bedroom and kitchen area.rem:obtain permit or restore premises to prior legal conditions.

    Apr 14, 2001

    Resolve
  • Hazardous

    Work without a permit.work noted:at cellar south full partition walls erected creating a class a apt with a kitchen w/gas stove,3pc bath and living room/bedroom area full plumbing and electrical service were no

    Apr 8, 2001 · Penalty $800

    Resolve
  • Hazardous

    Residence aftered for occupancy as a dwelling for more than the legally approved number of families.building department records indicate that residence is a legal 2 families;residence now altered for occupancy.

    Apr 8, 2001 · Penalty $3,050

    Resolve