roofy

Violations at 21-01 24 Avenue

Queens, NY 11105 · BBL 4-00876-0012 · Back to the property

HPD housing violations

No HPD violations on record

DOB building violations

47 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Immediate emergency anythingoptional

    Remedy: install construction fence #1 (50' additional lf needed at 24 ave side up to adjcent bldg at 21-15 24 av) & exposure #2 (135' lf nee ded at 21 st side) exposure #1 (24 ave) has 82' lf of construction fen ce currently proided up to corner of 24 ave and 21 st

    Dec 15, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Construction other optional

    Fail to maintain-vacant bldg in state of severe disrpr.roof opn, ceilings collpsd.severe water dmg &mold.bldg is not sate to occupy immed vacate bldg until condtns are remedied.rpr/demo bldg undr prmt obtn prmt by 10/21/22 strt wrk nlt 11/15/22

    Oct 3, 2022

    Dob violation - dismissed
  • Construction other optional

    Emergency work-parapet of south wall severely leaning & in danger of collapse,posing a risk to public immed demo/rmve south wall parpt undr drct &cont suprv of pe.pe submit m&m for rview.cmplt wrk no later then 10/7/22

    Oct 3, 2022

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Provide construction fence between the existing sidewalk shed and bldg facade at exposure#1 approximately 90.0'. encapsulate area with fence so the public can not access the area between the sidewalk shed and the facade of the building at exposure#1

    Jun 17, 2022

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 11, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 11, 2022

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Extend sidewalk shed westward, towards 21 street, an additional 16 linear feet,and the entire sidewalk shed (new and existing), shall be installed tight back to the building

    Mar 10, 2022

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 2, 2022

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Install approximately 30 linear feet of sidewalk shed in front of the 24th avenue side amin entrance

    Feb 11, 2022

    Dob violation - active
  • Unsafe buildings none

    Ub-unsafe buildings none

    Feb 10, 2022

    V%-dob violation
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 28, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 28, 1993

    Dob violation - dismissed

ECB violations

9 ECB violations, newest first.

  • Class - 1

    Summons issued for failure to maintain due approximately 20 feet of exterior facade pulling away from structure at exposure 1, along with multiple cracks around around exterior of building, repair and/replace;

    Feb 12, 2022 · Penalty $6,280

    Resolve
  • Class - 1

    Failure to maintain bldg in codecompliant manner.noted:during insp observed@exp1/front,parapet wall over main entrance in state of disrepairdue to decorative stone having several cracks&starting to detach&leani

    Feb 10, 2022 · Penalty $3,125

    Resolve
  • Class - 1

    Failure to maintain building in a code compliant manner. decorative stone facade in a state of disrepair with leaning and cracks., repair and/replace

    Dec 9, 2021 · Penalty $12,500

    Resolve
  • Non-hazardous

    Operation of a place of assembly w/o a current permit. p.a permit #105/59 expired 12-13-06. remedy: obtain a p.a permit.

    Apr 2, 2007 · Penalty $500

    Resolve
  • Non-hazardous

    Place of assembly exit sign does not meet building code standards. emergency exit signs to emergency egress exits are not illuminated. remedy:repair and/or replace sign.

    Apr 2, 2007

    Resolve
  • Non-hazardous

    Use of prohibited hardware. slide bolt on second means of egress. fire door and escape with occupant load of over 1000. remedy: the law requires that panic equipment be installed.

    Jan 4, 1990

    Resolve
  • Non-hazardous

    Emergency lighting inadequate. remedy: make adequate and file 10e and 10f to support adequate lighting.

    Jan 4, 1990 · Penalty $200

    Resolve
  • Unknown

    No emergency lighting. one fixture missing. remedy: install fix- ture. use of prohibited hardware. fire exit have seld bolt and lock.remedy: remove illegal device and replace with panic hardware.

    Jan 4, 1990

    Resolve
  • Unknown

    Required means of egress obstructed in dinning area with hanging curtains and plastic covering. exit lighting inoperative. remedy: remove obstruction, and make exit lighting operative.

    Jan 4, 1990

    Resolve