roofy

Violations at 25-16 Crescent Street

Queens, NY 11102 · BBL 4-00872-0063 · Back to the property

HPD housing violations

11 HPD violations, newest first.

  • CImmediately hazardous

    Abate the nuisance consisting of excessive extension cords in the entire apartment located at apt 2f, 2nd story

    Jul 23, 2012 · Apt 2F

    Open — Nov sent out
  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2f, 2nd story

    Jul 23, 2012 · Apt 2F

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective connection locknut waste line sink in the kitchen located at apt 2f, 2nd story

    Jul 23, 2012 · Apt 2F

    Open — Nov sent out
  • BHazardous

    Repair the roof so that it will not leak over ceiling in the kitchen located at apt 2f, 2nd story

    Jul 23, 2012 · Apt 2F

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of mice in the entire apartment located at apt 2f, 2nd story

    Jul 23, 2012 · Apt 2F

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective ceiling light fixture in the 3rd room from east located at apt 2f, 2nd story

    Jul 23, 2012 · Apt 2F

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective ceiling light fixture in the 1st room from north located at apt 2f, 2nd story

    Jul 23, 2012 · Apt 2F

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective exterior frame wall 1st story front bldg

    Jun 13, 2012

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of hot water fluctuate from hot to cold at bathtub 1st story apartment # 1 floor.

    May 9, 2002

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of exposed electric wire of front room ceiling 1st story apartment # 1 floor.

    May 9, 2002

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling of private hall 1st story apartment # 1 floor.

    Apr 29, 2002

    Open — Nov sent out

DOB building violations

2 DOB violations, newest first.

  • Construction other optional

    C-construction other optional

    Aug 5, 2000

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    Dd

    Nov 9, 1990

    Dob violation - dismissed

ECB violations

8 ECB violations, newest first.

  • Hazardous

    Work without permit(s). on second floor installed a second 3 piece bathroom. remedy:obtain permit(s) or restore premises to prior legal conditions

    Aug 5, 2000

    Resolve
  • Hazardous

    Occupancy contrary to dept of building records converting a legal two family dwelling to an illegal three family dwelling. illegal occupancy noted at cellar level. created class 'a' apartment with three bedroom

    Aug 5, 2000

    Resolve
  • Hazardous

    Residence altered for occupancy for more than the legally approved number of families. building department records indicate that residence is a legal 2 family; residence now converted for occupancy by 3 familie

    Aug 5, 2000

    Resolve
  • Hazardous

    Residence altered fpr occupancy as a dwelling. for more than the legally approved # of familys bldg. dept. records indecate legal (2) family w/ 4 sro's cellar, work noted: in cellar. partition erected

    Jun 30, 1998 · Penalty $800

    Resolve
  • Hazardous

    Occupancy contrary to that of bldg. dept. records occupancy noted: legal (2) family into illegal. (4) family w/(4) sro's in cellar. in cellar- full kitchen, full bathroom, (4) bedrooms w/ locking devices

    Jun 30, 1998

    Resolve
  • Unknown

    Dwelling illegaly converted from 2 family into 3 family dwelling.in c-ellar of premises a class "a" apt has been constructed.remedy:discontinue illegal use or amend the c of o.

    Feb 27, 1995

    Resolve
  • Non-hazardous

    Work without a permit. work noted at cellar level of premises sheet rock walls have been erected creating 4 gas stove and 3 peice bathroomhave been installed. remedy: obtain a permit if feasible or restore

    Feb 27, 1995

    Resolve
  • Non-hazardous

    Work without a permit work noted:partitions of sheetrock erected throughtou the basement. remedy:obtain a permit if feasible or restore to prior legal condition

    Nov 9, 1990

    Resolve