Violations at 20-25 Crescent Street
Queens, NY 11105 · BBL 4-00870-0028 · Back to the property
HPD housing violations
31 HPD violations, newest first.
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective smoke detector in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Feb 15, 2026 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective co detector in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Feb 15, 2026 · Apt 1A
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... ,grater than 10 sqft.at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Feb 15, 2026 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 1sq feet on ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Dec 1, 2024 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lower wooden cabinets in the kitchen located at apt 3b, 3rd story, 1st apartment from east at south
Apr 11, 2024 · Apt 3B
Open — Invalid certification - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Apr 11, 2024 · Apt 3B
Open — Invalid certification - BHazardous
Trace and repair the source and abate the visible mold condition... approx 16 sqft at ceiling in the 1st room from north located at apt 3b, 3rd story, 1st apartment from east at south
Apr 11, 2024 · Apt 3B
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from north located at apt 3b, 3rd story, 1st apartment from east at south
Apr 11, 2024 · Apt 3B
Open — Invalid certification - BHazardous
Repair the roof so that it will not leak above ceiling in the 1st room from north located at apt 3b, 3rd story, 1st apartment from east at south
Apr 11, 2024 · Apt 3B
Open — Invalid certification - ANon-hazardous
Paint with light colored paint to the satisfaction of this department east wall at public hall, 3rd story
Apr 9, 2024
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at east wall at public hall, 3rd story
Apr 9, 2024
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall at public hall, 3rd story
Apr 9, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective leak at water supply line at boiler at boiler room
Feb 29, 2024
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 24, 2023
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Oct 11, 2023 · Apt 2C
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 27, 2023
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Mar 23, 2023 · Apt 1A
Open — Nov certified late - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 2, 2022
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the bathroom located at apt 2c, 2nd story, 2nd apartment from east at south
Feb 11, 2022 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 1 sq. ft. at ceiling. in the bathroom located at apt 2c, 2nd story, 2nd apartment from east at south
Feb 11, 2022 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation radiator and steam riser in the 3rd room from east at north located at apt 1c, 1st story, apartment at south
Aug 1, 2019 · Apt 1C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls in the 3rd room from east at north located at apt 1c, 1st story, apartment at south
Aug 1, 2019 · Apt 1C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the bathroom located at apt 1c, 1st story, apartment at south
Aug 1, 2019 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from north at west located at apt 3a, 3rd story, apartment at north
Jan 13, 2017 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling in the 2nd room from north at west located at apt 3a, 3rd story, apartment at north
Jan 13, 2017 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls bulkhead to roof at public hall, 3rd story
Jan 13, 2017
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retarding plaster walls bulkhead to roof at public hall, 3rd story
Jan 13, 2017
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north at west located at apt 3a, 3rd story, apartment at north
Jan 13, 2017 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at west located at apt 3a, 3rd story, apartment at north
Jan 13, 2017 · Apt 3A
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 14, 2015
Closed — Violation dismissed
DOB building violations
5 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
ECB violations
No ECB violations on record