Violations at 20-65 26 Street
Queens, NY 11105 · BBL 4-00860-0001 · Back to the property
HPD housing violations
The newest 50 of 100 HPD violations. The city keeps the complete history.
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from east at south, the private hallway , the 3rd room from east at south, the 1st room from east located at apt 3a, 3rd story, 1st apartment from east at south
Sep 5, 2026 · Apt 3A
Open — Civ14 mailed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 7, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Sep 5, 2026 · Apt 3A
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north at east located at apt 3c, 3rd story, 1st apartment from east at south
Dec 27, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 4th room from north at east located at apt 3c, 3rd story, 1st apartment from east at south
Dec 27, 2025 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches at public hall, 2nd story
Aug 19, 2025
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches at public hall, 3rd story
Aug 19, 2025
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches at public hall, 2nd story
Aug 19, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 11, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the private hallway located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st closet from north at east wall door frame in the 1st room from north at west located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st closet from south at west wall door frame, 1st door frame from south at west wall in the 1st room from north at east located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the private hallway located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame in the 1st room from north at west located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st door frame from south at west wall in the 1st room from north at east located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north, the bathroom located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the kitchen located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from south at west wall, 1st window frame from south at west wall in the 1st room from north at west located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall, 1st radiator from north at east wall, south wall in the 1st room from north at east located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall in the kitchen located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective upper cabinet door at north wall in the kitchen located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st closet from east at south wall door frame, 1st closet from east at south wall door frame, 1st closet from east at south wall door frame, 1st closet from east at south wall door frame in the private hallway located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from north at east wall, 1st door frame from east at south wall, 1st radiator from north at east wall, 1st door frame from east at south wall, 1st radiator from north at east wall in the 1st room from north at west located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from south at west wall in the 1st room from north at west located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st door frame from east at south wall in the 1st room from north at west located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall in the 1st room from north at east located at apt 3a, 3rd story, 1st apartment from west at north
Jun 18, 2024 · Apt 3A
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at west stack building front at fire escape, 3rd story
May 6, 2024
Open — Not complied with - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 2 sq.ft ceiling in the bathroom located at apt 1c, 1st story, 1st apartment from north at east
May 6, 2024 · Apt 1C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1c, 1st story, 1st apartment from north at east
May 6, 2024 · Apt 1C
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from north located at apt 1c, 1st story, 1st apartment from north at east
May 6, 2024 · Apt 1C
Open — Nov certified late - BHazardous
Properly repair the source and abate the evidence of a water leak east wall in the 1st room from north located at apt 1c, 1st story, 1st apartment from north at east
May 6, 2024 · Apt 1C
Open — Nov certified late - ANon-hazardous
Properly repair with similar material the broken or defective grout joints at east and south tiled wall in the bathroom located at apt 1b, 1st story, 2nd apartment from west at north
Apr 19, 2024 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 1b, 1st story, 2nd apartment from west at north
Apr 19, 2024 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ''hinges'' in the entrance located at apt 1b, 1st story, 2nd apartment from west at north
Apr 19, 2024 · Apt 1B
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2024
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department north wall at bulkhead , 3rd story
Jan 5, 2024
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak north wall at bulkhead , 3rd story
Jan 5, 2024
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of key operated thumb lock at bulkhead door at public hall, 3rd story
Dec 20, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge on bulkhead door at public hall, 3rd story
Dec 20, 2023
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 27, 2023
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond window sill at 2nd story balcony, building front, east court at south fire escape,
Sep 30, 2022
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling approx 1 sq ft in the bathroom located at apt 1b, 1st story, 2nd apartment from south at west original violation 15394396 issued 28-sep-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Sep 28, 2022 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling approx 1 sq ft in the bathroom located at apt 1b, 1st story, 2nd apartment from south at west
Sep 28, 2022 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles on east wall in the bathroom located at apt 1b, 1st story, 2nd apartment from south at west
Sep 28, 2022 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1b, 1st story, 2nd apartment from south at west
Sep 28, 2022 · Apt 1B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 6 square feet at ceiling in the bathroom located at apt 1b, 1st story, 2nd apartment from west at north original violation 15385071 issued 25-sep-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Sep 25, 2022 · Apt 1B
Closed — Violation dismissed
DOB building violations
3 DOB violations, newest first.
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed
ECB violations
No ECB violations on record