Violations at 22-25 46 Street
Queens, NY 11105 · BBL 4-00768-0025 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
19 DOB violations, newest first.
- High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2018 external hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2018 external hgh pressure inspection
Jun 20, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 24, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 24, 2020
Dob violation - resolved - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 external high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 external high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 17, 2017
Dob violation - dismissed
ECB violations
18 ECB violations, newest first.
- Class - 2
Permit expired - jobsite fence. at time of inspection of a 3 story nb,observed a construction fence surrounding the property, upon check permit on bis,permit expired 11/29/17. remedy:renew permit/comply w/ code
Dec 20, 2019 · Penalty $3,125
Resolve - Class - 1
Bldg or open lot occupied w/o a valid cert of occupancy. constructed anew bldg w/job#421460519-nb & occupied the bldg before the job sign off & getting c of o. observed the bldg occupied as cube smart self stor
May 1, 2019 · Penalty $6,250
Resolve - Class - 2
Fai;lure to post permit for jobsite fence at premises. at time of inspection,observed at exp#1 of jobsite fence that there were no fence permit posted for the work(fence). as per code all permits shall be displ
Apr 23, 2019 · Penalty $312
Resolve - Class - 2
Sec. 3301.1 project information panel. at time of inspection observed that information panel was noit eligible. remedy: provide & maintain adequate project panel comply w/code.
Apr 23, 2019
Resolve - Class - 1
Failure to inspect or test elevator.at time of inspection on a active commercial jobsite observed elevator at expo#4 in use,upon request to see inspection name was unavailable or provided upon reviewing of dept
Feb 16, 2019 · Penalty $1,250
Resolve - Class - 2
Construction jobsite fence.at time of inspection on a active commercial jobsite it was observed that jobsite fence was missing approx 12ft at corner of expo#3 and #4 making jobsite accessible from adjacent prop
Feb 16, 2019 · Penalty $400
Resolve - Class - 1
Manufactor specifications for use of manlift.at time of inspection on a active jobsite(commercial)it was observed 4 workers operating 2 man lifts,2 man per lift.workers on manlift not tie on or ppe in use.upon
Feb 16, 2019 · Penalty $2,500
Resolve - Class - 1
Site safety plan.at time of inspection on a commercial active jobsite upon request to se site safely plan for jobs that require a construction super no site safety plan was available or provided.rem:stop all wo
Feb 16, 2019 · Penalty $1,250
Resolve - Class - 2
Work does not conform to approved construction docs and of approved amendments.at time of inspection contractor installed multiple piles at exp#3 within the reqd distance specified on the approved drawings.the
Oct 20, 2017 · Penalty $250
Resolve - Class - 2
Failure to post or properly post permit for work at premises.noted:on active jobsit under permit #421460519-01 fo-ex permit has not been posted.rem:post/properly post permit
Oct 20, 2017 · Penalty $400
Resolve - Class - 1
Failure to provide required notificaiton prior to the commencement of demolition. noted: demolition jobsite-entire site is filled and gradedbldg has been removed.bis shows pdm insp passed on 11-20-16 and there
Feb 14, 2017 · Penalty $1,200
Resolve - Class - 2
Failure to maintain housekeeping.noted expo#1 directly in front of site exit gates.dirt/soil has been allowed to collect on public sidwalk and carry into the street.remedy:maintain housekeeping remove all soil
Jan 21, 2017 · Penalty $800
Resolve - Class - 2
3307.7 fences:not adequate noted: const fence erected at expo#1. does not have adequate horizontal support causing plywood to warp and pull away. from frame support.remedy:maintain const.fence as per code repai
Jan 21, 2017 · Penalty $800
Resolve - Non-hazardous
50a/50b/50c. 1969 cyclotherm nb 1470. 50a- pipe down safety valve discharge to a safe point. 50b- add a slow opening valve to the bottom blowdown line. 50c-pipe down the glass drain valve
May 4, 2005 · Penalty $180
Resolve - Hazardous
Boiler needs to be operated by licensed operator
Jul 9, 2001
Resolve - Hazardous
No supervising licensed operator for the boiler
Jul 9, 2001
Resolve - Hazardous
2-49 boiler cyclothem nb36 year 1988 is stamped with fire side heatingsurface of 99 sq ft if the area of heating surfce calculated on water side it is going to exceedes 100 sq ft therefore requries supervision
Jun 22, 2001
Resolve - Hazardous
2-49 boiler cyclothem nb14047 year 1969 hoists fire side heating surface of 99 sq ft when calculated on water side the same exceeds 100 sq ft therefore needs to be supervised by licensed operator -2- submit p-2
Jun 22, 2001
Resolve