roofy

Violations at 31-27 49 Street

Queens, NY 11377 · BBL 4-00738-0050 · Back to the property

HPD housing violations

16 HPD violations, newest first.

  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom , the 4th room from north at west located at apt 6a, 6th story, 2nd apartment from north at east

    Mar 3, 2020 · Apt 6A

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 6d, 6th story

    Mar 19, 2019 · Apt 6D

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    Replace with new the broken or defective base cabinet in the kitchen located at apt 6d, 6th story

    Mar 19, 2019 · Apt 6D

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 6d, 6th story

    Mar 19, 2019 · Apt 6D

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd bedroom from north at west located at apt 6d, 6th story, 1st apartment from east at south

    Mar 19, 2019 · Apt 6D

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at east wall in the 1st living room from north located at apt 6d, 6th story, 1st apartment from east at south

    Mar 19, 2019 · Apt 6D

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at south wall in the private hallway located at apt 6d, 6th story, 1st apartment from east at south

    Mar 19, 2019 · Apt 6D

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the foyer , the kitchen , the bathroom , the 4th room from east, the 1st room from east at south, the 1st room from east at north located at apt 1d, 1st story, 1st apartment from east at south

    Nov 27, 2012 · Apt 1D

    Closed — Violation closed
  • BHazardous

    Repair or replace the smoke detector inoperable located at apt 1d, 1st story, 1st apartment from east at south

    Nov 27, 2012 · Apt 1D

    Closed — Violation closed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). inoperable located at apt 1d, 1st story, 1st apartment from east at south

    Nov 27, 2012 · Apt 1D

    Closed — Violation closed
  • BHazardous

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate ,, located at apt 1d, 1st story, 1st apartment from east at south

    Nov 27, 2012 · Apt 1D

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... around the east one window in the 1st room from east at south located at apt 1d, 1st story, 1st apartment from east at south

    Nov 27, 2012 · Apt 1D

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling and south wall in the bathroom located at apt 1d, 1st story, 1st apartment from east at south

    Nov 27, 2012 · Apt 1D

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at south wall in the private hallway located at apt 1d, 1st story, 1st apartment from east at south

    Nov 27, 2012 · Apt 1D

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the private hallway located at apt 1d, 1st story, 1st apartment from east at south

    Nov 27, 2012 · Apt 1D

    Closed — Violation closed
  • ANon-hazardous

    Refit lower sash at east one window in the 4th room from east located at apt 1d, 1st story, 1st apartment from east at south

    Nov 27, 2012 · Apt 1D

    Closed — Violation closed

DOB building violations

The newest 50 of 218 DOB violations. The city keeps the complete history.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner. observed broken window on exposure 2 on 3rd floor same window from previous inspection on 6/6/2025. remedy: repair and or replace

    Oct 29, 2025

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain building in code compliant manner. observed step cracking spalled brick work on exposure 4 east elevations in multiple locations. also 2 broken windows on exposure 2 west elevation 3fl remedy: repair and/or replace

    Jun 6, 2025

    Dob violation - active
  • Construction other optional

    Emergency work order due to step cracking on exposure 4 east elevation north & south ends. step cracks seen at 5th and 6th fl at the corners of the building near the edge shifted brick work noicable. remedy: immediately provide adequate safety measures at exposure 4 north and south ends of the east elevation

    Jun 6, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    May 1, 2024

    Dob violation - active
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    May 1, 2024

    Dob violation - active
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    May 1, 2024

    Dob violation - active
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    May 1, 2024

    Dob violation - active
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    May 1, 2024

    Dob violation - active
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    May 1, 2024

    Dob violation - active
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    May 1, 2024

    Dob violation - active
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    May 1, 2024

    Dob violation - active
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    May 1, 2024

    Dob violation - active
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    May 1, 2024

    Dob violation - active
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    May 1, 2024

    Dob violation - active
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    May 1, 2024

    Dob violation - active
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    May 1, 2024

    Dob violation - active
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    May 1, 2024

    Dob violation - active
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    May 1, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • Nycha elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Dec 17, 2021

    Dob violation - dismissed
  • Nycha elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Dec 17, 2021

    Dob violation - dismissed
  • Nycha elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Dec 17, 2021

    Dob violation - dismissed
  • Nycha elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Dec 17, 2021

    Dob violation - dismissed
  • Nycha elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Dec 17, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 17, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 17, 2020

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 17, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 17, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 17, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 17, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 17, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 17, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 17, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 17, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 17, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 17, 2020

    Dob violation - resolved

ECB violations

33 ECB violations, newest first.

  • Class - 2

    Failure to maintain exterior building facade and appurtenances.note:attime of inspection i observed a cracked/broken window at exposure#1 north elevation approx.4th floor.rem:maintain exterior facade and appurt

    Apr 16, 2026 · Penalty $2,500

    Resolve
  • Class - 1

    A piece of sharp terracotta cut a worker's left forearm during demolition, taken to hospital. permit holder job# q00809863 failed to submit report within 3 business days of required 16 items to code 28-103.21 p

    Jul 11, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications.note:observed defective(bent)rails and braces to the sidewalk shed located at exposure#4 east elevation.rem:comply to code specifications.

    Dec 20, 2022 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to provide adequate safety measures such as shed,netting,etc,where required to protect public and property.note:observed inadequate safety measures(no safety measures in place)at exposure#2 west elevati

    Dec 20, 2022 · Penalty $10,000

    Resolve
  • Class - 2

    Failure to maintain building exterior walls or appurtenances. note:at time of inspection,observed open-cracked brick masonry in numerous locations on bulkhead&chimney at roof level. remedy:provide safety measur

    Jun 16, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to provide sidewalk shed where required as noted:at time of inspection i observed on exposure#2 & 3 damaged:missing mortar joints;step cracks in parapet brick work and at 5th floor.rem:provide adequate

    Jun 7, 2022 · Penalty $10,000

    Resolve
  • Class - 2

    Broken zone valve for heat to the building., maintain boiler; correct violating condition and submit a certificate of correction.

    Nov 13, 2020 · Penalty $625

    Resolve
  • Class - 2

    Exit door not self-closing properly.at first floor,kitchen area,one exit door not self closing properly when tested at the time of inspection.rem:repair/replace door.

    Feb 18, 2020 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain building in code-complaint manner illumination forexits.exit discharges and public corridors per bc 1006.1;27-381 at 1stfloor room no.1 one place(near exit door)2 lights are not operational

    Feb 18, 2020 · Penalty $625

    Resolve
  • Class - 2

    13x10;13-x-10 repair emergency light

    Apr 3, 2019

    Resolve
  • Class - 2

    64m7,100m7,100k11,70o2,41d6,60l10; 64-m-7 city i.d missing inside car provide.100-m-7 brail tags missing on door bucks 1fl-lth fl. 100-k-11 door buck rusted on 2nd fl.-replace.70-o-2 41-d-6 key for motor room s

    Apr 2, 2019

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner illumination forexits. exit discharges. and public corridors per bc 1006.1;27-381 at 1st fl room#3 exit to playground one place 2 exit light is not operatio

    Feb 21, 2019

    Resolve
  • Class - 2

    Failure to provide approved plans/docs @ time of insp. note: @ the time of insp. observed sidewalk shed in place. i spoke to the super on site & he instructed me that he didn't have approved plans/docs on site.

    Jul 28, 2017

    Resolve
  • Class - 2

    Temporary equipment on site. expired permit. note: observed sidewalk shed in place sw shed permit # 440270760 expired on 11/23/16. remedy: reniew permit.

    Jul 28, 2017

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner.noted:first floor kitchen w/emergency exit light inoperative.rem:repair/replace lighting

    May 1, 2017 · Penalty $250

    Active
  • Class - 2

    Failure to maintain bldg in code-compliant manner:lack of emergency lighting for exits, exit discharges and public corridors per bc 1006.227-542. noted: at main entrance and class #3, emergency lights found

    Apr 7, 2017

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner:lack of emergency lighting for exits, exit discharges and public corridors per bc1006.1; 27-542. noted: first floor pal front corridor with 3 emergency exit

    Aug 26, 2016

    Resolve
  • Class - 2

    70o02,07x10. 70o02-remove water from the pit. 97x10-restore to service.

    Dec 17, 2012

    Resolve
  • Class - 2

    52-l-10/52-l-10-2 hoist ropes crossed

    Aug 10, 2011

    Resolve
  • Class - 1

    Supervision!use of rigging equipment without a rigger's license.noted:4-5525/zoria housing llc was put on a inactive list on 5/23/2011,upon inspection on today's date,this job site was active with rigging equi

    May 27, 2011 · Penalty $4,800

    Resolve
  • Class - 2

    Xailed to notify the dept prior to use/installation of outrigger beamsin connection with suspended scaffold.noted:no outrigger beams notification @ all exposure for scaffolds in use @ time of inspection.rem:not

    Feb 15, 2011 · Penalty $400

    Resolve
  • Class - 2

    Failed to notify dob prior the installation of out-rigger beams in connection w/susp scaffolds observed @ time of inspection a workers on a two ft suspend scaffolds from outrigger beams.doing abestos abatement

    Feb 15, 2011 · Penalty $400

    Resolve
  • Class - 1

    Inadequate safety measures operation of hoisting equipment in unsafe manner. noted: upon inspection found defective cables on material hoist on bldg #2,#3 also found 1 defective motor in use,cables from under

    Feb 11, 2011 · Penalty $4,800

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations rem:

    Sep 20, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable 6round technical report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.36012050k.

    Sep 20, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/ code provisions : periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rule & regulations

    Feb 17, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/ code provisions : periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rule & regulations

    Feb 17, 2010

    Resolve
  • Class - 2

    Failure to submit an acceptable 6th rd technical report in compliance w/code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations. remedy

    Nov 28, 2008

    Resolve
  • Class - 2

    Failure to submit an acceptable 6th rd technical report in compliance w/code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations. remedy

    Nov 28, 2008

    Resolve
  • Class - 2

    Failure to submit an acceptable 6th rd technical report in compliance w/code provisions: periodic inspection of exterior walls & appurtenances as reqired by article 28.302 & the dob rules & regulations. remedy

    Nov 28, 2008

    Resolve
  • Class - 2

    Failure to submit an acceptable 6th rd technical report in compliance w/code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations. remedy

    Nov 28, 2008

    Resolve
  • Class - 2

    Failure to submit an acceptable 6th rd technical report in compliance w/code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations. remedy

    Nov 28, 2008

    Resolve
  • Hazardous

    Residence altered for more than the legally approved number of families dept of bldg. records indicates residence to be legally approved for two families residence now altered by three families. alteration work

    Jul 1, 2002 · Penalty $3,000

    Resolve