28-25 41 Street
Queens, NY 11103BBL 4-00664-0011Map
Owner of record: Cubas, Roger
28-25 41 Street is a walk-up apartment building built in 1941 in Queens, 11103. It has 3 residential units across 2 floors. The owner of record is Cubas, Roger. HPD has recorded 32 housing violations here, most recently on June 11, 2025.
- HPD violations
- 32
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 32
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 32
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 11, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2024
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 2 square feet at ceiling in the bathroom located at bsmt-apt ground, 1st bsmt-apt from north at east
Sep 6, 2023 · Apt GROUND
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at bsmt-apt ground, 1st bsmt-apt from north at east
Sep 6, 2023 · Apt GROUND
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at bsmt-apt ground, 1st bsmt-apt from north at east
Sep 6, 2023 · Apt GROUND
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at bsmt-apt ground, 1st bsmt-apt from north at east
Sep 6, 2023 · Apt GROUND
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at bsmt-apt ground, 1st bsmt-apt from north at east
Sep 6, 2023 · Apt GROUND
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at bsmt-apt ground, 1st bsmt-apt from north at east
Sep 6, 2023 · Apt GROUND
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls , ceiling and trims in the entire apartment located at bsmt-apt ground, 1st bsmt-apt from north at east
Sep 6, 2023 · Apt GROUND
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot exceeding 130 degrees fahrenheit in the entire apartment located at bsmt-apt ground, 1st bsmt-apt from north at east
Sep 6, 2023 · Apt GROUND
Closed — Violation closed
Show 22 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 28, 2023
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective electrical outlet at south wall in the 2nd room from north located at apt 2f, 1st story, 1st apartment from east at south
Oct 26, 2022 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical outlet at east wall in the 4th room from north at east located at apt 2f, 1st story, 1st apartment from east at south
Oct 26, 2022 · Apt 2F
Closed — Violation closed - BHazardous
Properly secure the loose ceramic wall tiles at north wall in the bathroom located at apt 2f, 1st story, 1st apartment from east at south
Oct 26, 2022 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair the broken or defective ,electrical light fixture at east wall in the 2nd room from north located at apt 2f, 1st story, 1st apartment from east at south
Sep 9, 2022 · Apt 2F
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, south wall, east wall, north wall, 1st window frame from north at east wall, 1st door from south at west wall in the bathroom located at apt 2f, 1st story, 1st apartment from east at south
Sep 9, 2022 · Apt 2F
Closed — Violation closed - BHazardous
Replace with new the broken or defective ,electrical outlet at east wall in the 4th room from north at east located at apt 2f, 1st story, 1st apartment from east at south
Sep 9, 2022 · Apt 2F
Closed — Violation closed - BHazardous
Properly secure the loose ,electrical outlet at south wall in the 2nd room from north located at apt 2f, 1st story, 1st apartment from east at south
Sep 9, 2022 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the bathroom located at apt 2f, 1st story, 1st apartment from east at south
Sep 9, 2022 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, 1st window frame from east at south wall in the 1st room from north located at apt 2f, 1st story, 1st apartment from east at south
Sep 9, 2022 · Apt 2F
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at showerstall in the bathroom located at bsmt-apt 1, 1st bsmt-apt from south at west
Sep 6, 2022 · Apt 1
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees fahrenheit at all hot water fixtures in the entire apartment located at bsmt-apt 1, 1st bsmt-apt from south at west
Sep 6, 2022 · Apt 1
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening key operated hasp and eye installed in the foyer located at bsmt-apt 1, 1st bsmt-apt from south at west
Sep 6, 2022 · Apt 1
Closed — Violation closed - BHazardous
Properly secure the loose smoke alarm at ceiling in the private hallway located at bsmt-apt 1, 1st bsmt-apt from south at west
Sep 6, 2022 · Apt 1
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective secondary egress door leading to rear yard in the kitchen located at bsmt-apt 1, 1st bsmt-apt from south at west
Sep 6, 2022 · Apt 1
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at bsmt-apt 1, 1st bsmt-apt from south at west
Sep 6, 2022 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak ... in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Aug 5, 2022 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Aug 5, 2022 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective tile floor in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Aug 5, 2022 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets shower assembly knobs leaking in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Aug 5, 2022 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 1, 1st story, 1st apartment from north at east
Aug 5, 2022 · Apt 1
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 3, 2022
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Water leak
Slow leak
Feb 24, 2024 · Apt BASEME
Close - Water leak
Heavy flow
Aug 15, 2023 · Apt GROUND
Close - Plumbing
Bathtub/shower
Aug 15, 2023 · Apt GROUND
Close - Plumbing
Toilet
Aug 15, 2023 · Apt GROUND
Close - Unsanitary condition
Pests
Aug 15, 2023 · Apt GROUND
Close - Paint/plaster
Wall
Oct 16, 2022 · Apt 2F
Close - Unsanitary condition
Mold
Oct 16, 2022 · Apt 2F
Close - Electric
Wiring
Oct 16, 2022 · Apt 2F
Close - Door/window
Door
Aug 31, 2022 · Apt GROUND
Close - Plumbing
Bathtub/shower
Aug 31, 2022 · Apt GROUND
Close
Show 22 more ↓
- Electric
Outlet/switch
Aug 29, 2022 · Apt 2F
Close - Paint/plaster
Ceiling
Aug 29, 2022 · Apt 2F
Close - Heat/hot water
Apartment only
Aug 29, 2022 · Apt 2F
Close - Electric
Lighting
Aug 29, 2022 · Apt 2F
Close - Plumbing
Water supply
Aug 29, 2022 · Apt 2F
Close - Unsanitary condition
Mold
Aug 29, 2022 · Apt 2F
Close - Paint/plaster
Ceiling
Aug 18, 2022 · Apt BASEME
Close - Plumbing
Water supply
Aug 18, 2022 · Apt BASEME
Close - Door/window
Door
Aug 18, 2022 · Apt BASEME
Close - Paint/plaster
Ceiling
Aug 3, 2022 · Apt 1
Close - Water leak
Heavy flow
Jul 30, 2022 · Apt GROUND
Close - Paint/plaster
Ceiling
Jul 30, 2022 · Apt GROUND
Close - Paint/plaster
Ceiling
Jul 21, 2022 · Apt B
Close - Electric
Power outage
Aug 20, 2015 · Apt 1FL
Close - Electric
Electric-supply
Jan 3, 2014 · Apt 1
Close - Electric
Electric-supply
Jan 3, 2014 · Apt 1
Close - Heating
Heat related
Aug 29, 2013 · Apt 1
Close - Paint/plaster
Ceiling
Aug 29, 2013 · Apt 1
Close - General
Floor
Jul 26, 2010 · Apt 2
Close - General
Mold
Jul 26, 2010 · Apt 2
Close - Construction
Roof
Jul 26, 2010 · Apt 2
Close - General
Doors
Jul 26, 2010 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1941
- Floors
- 2
- Residential units
- 3
- Building area
- 2,520 ft²
- Lot area
- 2,000 ft²
- Zoning
- R5
- Community board
- 401
- Council district
- 22
- Block / lot
- 664 / 11
- Assessed value
- $96,420
- Landmark / historic district
- No
HPD registration #431827, last renewed Jul 15, 2025.
Questions about 28-25 41 Street
Who owns 28-25 41 Street?
The owner of record in NYC Department of City Planning PLUTO data is Cubas, Roger.
Does 28-25 41 Street have violations?
Yes. NYC HPD has recorded 32 housing violations at this property.
Is 28-25 41 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 28-25 41 Street built?
City records list 1941 as the year it was built.
How many apartments are in 28-25 41 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.