34-16 38th Street
Queens, NY 11101BBL 4-00645-0038Map
Owner of record: Lic 38 Realty LLC
34-16 38th Street is an elevator apartment building built in 2025 in Queens, 11101. It has 89 residential units across 9 floors. The owner of record is Lic 38 Realty LLC. HPD has recorded 11 housing violations here, most recently on May 28, 2008.
- HPD violations
- 11
- DOB violations
- 0
- ECB violations
- 27
- HPD complaints
- 14
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 11
- BHazardous
Abate the nuisance consisting of vermin bed bugs in the entire apartment located at apt 2flr, 2nd story, apartment at north
May 28, 2008 · Apt 2FLR
Closed — Violation closed - ANon-hazardous
Remove the torn and/or loose floor covering linoleum tiles in the kitchen located at apt 2flr, 2nd story
May 28, 2008 · Apt 2FLR
Closed — Violation closed - BHazardous
Properly secure the loose ceiling light fixture in the bathroom located at apt 2flr, 2nd story, apartment at north
May 28, 2008 · Apt 2FLR
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2flr, 2nd story, apartment at north
May 28, 2008 · Apt 2FLR
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2flr, 2nd story, apartment at north
May 28, 2008 · Apt 2FLR
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2flr, 2nd story, apartment at north
May 28, 2008 · Apt 2FLR
Closed — Violation closed - BHazardous
Properly repair the broken or defective wooden cabinet base in the bathroom located at apt 2flr, 2nd story, apartment at north
May 28, 2008 · Apt 2FLR
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles in the kitchen located at apt 2flr, 2nd story, apartment at north
May 28, 2008 · Apt 2FLR
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical outlet west wall in the bathroom located at apt 2flr, 2nd story, apartment at north
May 28, 2008 · Apt 2FLR
Closed — Violation closed - BHazardous
Properly repair the broken or defective wall light fixture west wall in the bathroom located at apt 2flr, 2nd story, apartment at north
May 28, 2008 · Apt 2FLR
Closed — Violation closed
Show 1 more ↓
- ANon-hazardous
Properly secure the loose shower rod in the bathroom located at apt 2flr, 2nd story, apartment at north
May 28, 2008 · Apt 2FLR
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 27
- Class - 2
Work after hours without a various permit contrary to 28-105.12.5. at time of inspection active ahv permit#q5401467 contrary 9:50 am, generator running at actively at front extreme loud of active site within 20
Feb 22, 2026 · Penalty $1,250
Resolve - Class - 2
Bc 3303.2.3.1 temp lighting: during inspection of an active site i observed on the upper floor 6/8 there was portion of the floor that was missing lighting. there was a worker on that floor, and only half of th
Dec 23, 2025 · Penalty $2,500
Resolve - Class - 2
Bc 3303.16 worker sheds: during inspection of a proposed 9 story building i observed multiple shanties (worker sheds) within the site on the ground floor. i noticed that the wood plywood was missing the require
Dec 23, 2025 · Penalty $2,500
Resolve - Class - 2
Bc3306.9.10.3 covering of floor openings: during inspection of a proposed 9 story building i observed that there were uncovered, unsecured and unmarked holes throughout the site. this created trip, fall and the
Dec 23, 2025 · Penalty $2,500
Resolve - Class - 2
At time of inspection observed work being done contrary to approved documents. 2 delivery trucks were parked side to side contrary to the approved single lane parking on the site safety plan. occupying the road
Dec 1, 2025
Resolve - Class - 1
During inspection of a site were a worker was carrying signage and first aid boxes up the concrete wooden ladder, the worker tripped and fell down the ladder, hit his head on the concrete wall and injured his l
Nov 24, 2025 · Penalty $2,500
Resolve - Class - 1
During inspection of an active site, i observed concrete/pump truck was not fully enclosed by barriers as required. manufactures specs require barriers to be interlocked & filled to provide vehicle and pedestri
Nov 21, 2025 · Penalty $2,500
Resolve - Class - 2
At the time of inspection of a 9 story proposed new building active jobsite during my inspection i observed at exp#3 construction fence not maintain 8-ft in height as per bc3307.7maintain 8-ft construction fen
Nov 13, 2025 · Penalty $1,000
Resolve - Class - 1
At the time of inspection of 9 story proposed new building i observed inadequate housekeeping at cellar and ground floor bricks plywood and combustible materials and standing water creating a unsafe work condit
Nov 13, 2025 · Penalty $2,500
Resolve - Class - 2
At time of inspection i observed delivery truck concrete washout box in place at storage zone not as per code 3307.4.7 inadequate barriers adjacent to sidewalk shed and roadway, and missing 4-ft chain link fenc
Nov 13, 2025 · Penalty $2,500
Resolve
Show 17 more ↓
- Class - 1
Removal of the posted stop work order. noted: posted stop work order has been removed., comply with code
Oct 9, 2025 · Penalty $5,000
Resolve - Class - 2
At time of inspection, a truck was positioned on the temporary pedestrian sidewalk, jersey barriers not interlocked creating a hazard to pedestrians. operations were not being conducted in accordance with dot
Sep 30, 2025 · Penalty $625
Resolve - Class - 1
During my inspection of an active 9-story at the foundation phase. i observed inadequate protection at the end of excavation, approximately 12' deep, with no 45-degree angle of repose. stop all foundation opera
Sep 19, 2025 · Penalty $5,000
Resolve - Class - 2
During my inspection. i observed the adjacent property at exposure 4; the foundation wall was exposed. this constitutes undermining the structural integrity. stop all excavation and foundation work 10' back exp
Sep 19, 2025 · Penalty $2,500
Resolve - Class - 1
At time of inspection of a proposed 9 story building at soe phase, i observed an existing concrete foundation wall at exposure 3 & rubble foundation wall at exposure 4 from demo operations in place, with no in
Aug 27, 2025 · Penalty $2,500
Resolve - Class - 1
During inspection of a site on a stop work order on all demo operations since 07/24/2025 and only allowed to put in safety measures at ex#2 and #3 i noticed that the entire building had been demoed against the
Aug 8, 2025 · Penalty $10,000
Resolve - Class - 2
During inspection of an active demo site, i requested the logbook. the site had 5 buildings to be demoed site 34-12 38 st did not have a superintendent logbook. logbooks are required to be onsite and updated da
Jul 29, 2025 · Penalty $5,000
Resolve - Class - 1
Bc 3306.4 mechanical demolition equipment: during inspection of an active demo site, i observed demo operations at the rear of the building exposure#3 no safety zone established/barriers for the adjacent proper
Jul 28, 2025 · Penalty $5,000
Resolve - Class - 2
Bc 3306.9.3 dust: during inspection of an active site under demo operations, i observed plumbs of dust in the air. there was no dust mitigation protocol in place. no watering down of the construction dust and d
Jul 28, 2025 · Penalty $2,500
Resolve - Class - 1
15 rcny 20-08 (b) fire hydrant: inspection on 7/29/2025 i observed that there was a fire hydrant that was covered by a black plastic bag and a hose attached leading into the site. fire hydrants maybe opened onl
Jul 28, 2025 · Penalty $2,500
Resolve - Class - 1
Bc3301.13.5 alternate superintendent: during inspection of an active demo site, i requested for the superintendent #n-031462 logbook, but there was none onsite & there was no indication of the superintendent or
Jul 28, 2025 · Penalty $5,000
Resolve - Class - 2
During inspection of a demo site of multiple blocks (36,37,38,40,42)merged into lt38 for demo only i observed that there was no or missing protection for the adjacent properties throughout exposure #2 and #3 le
Jul 24, 2025 · Penalty $5,000
Resolve - Class - 2
Bc3303.3watchperson: during inspection of an inactive demo site of multiple buildings combined under block lt38 with a footprint of 6819 square feet. upon observing, calling out & banging on the fence, to alert
Jul 24, 2025 · Penalty $2,500
Resolve - Class - 2
At front of building, step crack and vertical crack at parapet,also at exposures 2 & 4, multiple step cracks and horizontal cracks appear., maintain exterior building wall
May 7, 2025 · Penalty $5,000
Resolve - Class - 2
Violation of parking regulation in a residential district. photo: (at side & rear yards: note: storage of 2 unlicensed white toyota sedans large grey comm. boc van, 2(commerical signage), auto driving school ve
Dec 26, 2008 · Penalty $800
Resolve - Non-hazardous
Occupancy contrary to dob records dob records indicates premises is a 2 family residence in m1-1 district illegal occupancy noted now premises converted to 2 family with a parking lot at the time of inspection
Jun 9, 2008 · Penalty $800
Resolve - Non-hazardous
Work w/o a permit work noted at rear of the premises demolished the entire garage and created off st parkings remedy: obtain permit or restore to prior legal condition
Jun 9, 2008 · Penalty $250
Resolve
Complaints
- Appliance
Electric/gas range
Sep 20, 2026 · Apt 704
Open - Nonconst
Vermin
May 20, 2008 · Apt 2FLR
Close - Nonconst
Vermin
May 20, 2008 · Apt 2FLR
Close - Nonconst
Vermin
May 20, 2008 · Apt 2FLR
Close - General
Cabinet
May 20, 2008 · Apt 2FLR
Close - Plumbing
Bathtub/shower
May 20, 2008 · Apt 2FLR
Close - General
Ceramic-tile
May 20, 2008 · Apt 2FLR
Close - General
Floor
May 20, 2008 · Apt 2FLR
Close - General
Doors
May 20, 2008 · Apt 2FLR
Close - Nonconst
Vermin
May 12, 2008 · Apt 2FLR
Close
Show 4 more ↓
- Nonconst
Vermin
May 12, 2008 · Apt 2FLR
Close - Nonconst
Vermin
May 12, 2008 · Apt 2FLR
Close - General
Cabinet
May 12, 2008 · Apt 2FLR
Close - General
Cabinet
May 12, 2008 · Apt 2FLR
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2025
- Floors
- 9
- Residential units
- 89
- Building area
- 73,687 ft²
- Lot area
- 15,609 ft²
- Zoning
- R6A
- Community board
- 401
- Council district
- 22
- Block / lot
- 645 / 38
- Assessed value
- $656,550
- Landmark / historic district
- No
HPD registration #434721, last renewed Jul 31, 2026.
Questions about 34-16 38th Street
Who owns 34-16 38th Street?
The owner of record in NYC Department of City Planning PLUTO data is Lic 38 Realty LLC.
Does 34-16 38th Street have violations?
Yes. NYC HPD has recorded 11 housing violations at this property.
Is 34-16 38th Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 34-16 38th Street built?
City records list 2025 as the year it was built.
How many apartments are in 34-16 38th Street?
It has 89 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.