roofy

35-01 36 Avenue

Queens, NY 11106BBL 4-00639-0001Map

Owner of record: 35-01 Astoria Owner LLC

35-01 36 Avenue is an office building built in 2021 in Queens, 11106. The owner of record is 35-01 Astoria Owner LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
7
ECB violations
51
HPD complaints
1

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 7

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - dismissed
  • Construction other optional

    Boro commissioner has ordered work stopped for # 420666915 due to general contractor withdrawal.

    Sep 12, 2022

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed

ECB violations · 51

  • Class - 2

    At the time of my inspection i observed a construction fence installed at exposure 1 and 2 not maintained or installed contrary to code. damaged and protruding wood. graffiti & paper from unlawful postings (not

    Oct 28, 2024 · Penalty $1,000

    Resolve
  • Class - 2

    I observed pedestrian protection (sidewalk shed) not maintained in a safe condition contrary to code 3307.6.5.1. rusted deteriorating vertical members. rusted, rotting, deteriorating shed deck (holes in deck),

    Oct 28, 2024 · Penalty $2,400

    Resolve
  • Class - 2

    Upon inspection of an active 9 story nb and after review of the approved site safety plan work was determined to be installed contrary to code. no netting provide on chain link fence on top of jersey barriers a

    Oct 28, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    I observed pedestrian protection (sidewalk shed) installed contrary to codes: 3307.6.4.4-multiple vertical beams installed closer than 18 inches of face of curb expos 2. 3307.6.4.7- pipe across crosswalk pathwa

    Oct 28, 2024 · Penalty $2,400

    Resolve
  • Class - 2

    Observed construction fence at several exposures, permit q00364769-i1-fn expired 04/01/2024. permitholder failed to renew permit in contrary with 28-105.2 classification of work permits section 8 temporary cons

    Jul 18, 2024 · Penalty $625

    Resolve
  • Class - 1

    Observed 9 str/140 ft new building under construction- active site w/ aprox. 15 workers on site. upon review of department records, i found that the permit holder of the main new building permit had not updated

    Apr 9, 2024 · Penalty $5,000

    Resolve
  • Class - 2

    I observed sf at all 4-exp installed contrary to plans-using 2-5' high masonary frames on base(1st row)-not on plans(plans shows walkthrough frames),distance to work is(outrigger used-3inch max space -per code)

    Sep 20, 2023

    Resolve
  • Class - 1

    At the time of my inspection of 10 story new building i observed inadequate guardrail system on roof at corners of exp#1,2,3-loose top/middle wire(moves more than 1inch)support post not attached fully -moving ,

    Sep 20, 2023 · Penalty $5,000

    Resolve
  • Class - 2

    At time of inspection of department records no compliance was recorded for incident 5-12-2023.

    Aug 14, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to notify the department of an accident incident that resultedin a fatally or an injury.a worker fall off a frame ladder during framing operation worker was taken to hospital as per check of the departm

    May 12, 2023 · Penalty $2,500

    Resolve
Show 40 more ↓
  • Class - 1

    & industry safety standard for safe ladder use.@9 story nb site in response to interior framer/carpenter worker fell off &landed on masonry per personnel taken to offsite medical facility while framing on 7th f

    Apr 25, 2023 · Penalty $2,500

    Resolve
  • Class - 2

    Upon review of approved scaffold/needle beam plans, site condition did not conform to the approved plan. site condition was differ from needle beam clamp system with insufficient details on plan. no use of scaf

    Mar 20, 2023

    Resolve
  • Class - 2

    At the time of inspection, observed unprotected mechanical vent at exposure 3 and unprotected antenna dish at exposure 4. roof protection did not conform to site safety plan. no exterior work at exposure 3 and

    Mar 20, 2023

    Resolve
  • Class - 2

    At time of inspection at an active jobsite, it was observed failure to maintain adequate housekeeping with construction debris on various floors,electric cables crossing path ways/corridor and on set back at ex

    Jan 16, 2023

    Resolve
  • Class - 2

    At time of inspection at an active jobsite it was observed scaffold has not been installed and maintained as per code on various exposure and floors - missing toe boards, not fully planked,distance to face of b

    Jan 16, 2023

    Resolve
  • Class - 2

    At time of inspection at an active jobsite it was observed failure to rovide tree protection at exposure-2 (35th street) as per site safety plan presented at jobsite and contrary to code. provide tree protectio

    Jan 16, 2023

    Resolve
  • Class - 2

    Time of inspection at 9 story new building open active site observed supported scaffold installed at all exposure. upon review on dob approved plans determine that scaffold planks installed contrary to plans.

    Dec 21, 2022

    Resolve
  • Class - 1

    At time of my inspection responding to complaint that sidewalk shed roof parapet damage hit by truck at 35 street and 36 avenue corner approximately 20 feet. the permit holder did not notify immediately as requ

    Jul 15, 2022

    Resolve
  • Class - 2

    I observed 9 story building roof level under construction working in progress with work not conform as per approved ssp plan as required. the site safety plan & supported scaffold plan provided scaffold around

    Jul 15, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to provide watchperson as required: at time of my inspection observed 9 story building roof level under construction. upon request for watchperson job site unable to provided and no documentation on si

    Jul 15, 2022 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to temporary elevator certificate as required. i observed temporary elevator /hoist installed with certificate expired 06/14/2022. not renew as required. stop all work 75 feet. do not use hoist. obtain

    Jul 15, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    Failed to provide watch person.note:at the time of my inspection of a new 9 story building with approximately 6774 sqaure foot upon poundingon the fence and shouting at exposure#1,2 to verify compliance attenti

    Apr 16, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    Bc 3307.4.7 work and storage zone note:at the time of my inspection ofa 9 story building no active construction site is closed,i observed work and storage zone at exposure 1,2 adjacent to the sidewalk shed was

    Apr 16, 2022 · Penalty $6,250

    Resolve
  • Class - 2

    Work contrary to approved/accepted docs/drawing-ato my insp on nb9sty mixuse i observed needle beams on 3fl level.upon rev const docs i noted needle beams on exp3&4 has been erected contr build-contrary to draw

    Dec 27, 2021

    Resolve
  • Class - 2

    Bc3309.10 inadequate roof protection.ato my insp on 9stynb,i observed active site w/ssm onsite.also observed inadequate.roof protection on exp3.pipes&chimney arent protected contrary to nyc code(bldg code).comp

    Dec 27, 2021

    Resolve
  • Class - 2

    Bc3314.1 inadequate support scf.ato my insp on 9stynb i observed active site w/ssm onsite.also observed supported scf w/missing debris netting on exp1 left side from hoist&on exp3 on 5fl&up.provide debris netti

    Dec 27, 2021

    Resolve
  • Class - 1

    Work doesnt conform to approved const docs &/or approved amendments.atoi of proposed 9stynb under const (6fl poured,8th working),i observed vert cable netting@fl2-8 w/steel angle vert spacing posts used-not sho

    Oct 19, 2021 · Penalty $625

    Resolve
  • Class - 1

    Work doesnt conform to approved const docs &/or approved amendments.atoi of proposed 9stynb under const (6fl poured/8th working), i observeda needle beam platforms@exp2rear,exp3&3rear,exp4 w/ following conditio

    Oct 19, 2021 · Penalty $625

    Resolve
  • Class - 1

    Failure to perform successful hydrostatic pressure test of standpipe system.atoi of proposed 9stynb under const (6fl poured,8th working),i observed standpipe going up to 7fl.upon rev of provided hydrostatic tes

    Oct 19, 2021 · Penalty $5,000

    Resolve
  • Class - 1

    Work doesnt conform to approved const docs &/or approved amendments.atoi of proposed 9stynb under const,(6fl poured, 8th working),i observedthat ssp called for adj property parking lot@exp3 rear&exp4 corner to

    Oct 19, 2021 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per sec requirementsatoi of proposed 9stynb under const (6fl poured,8th working),i observed materials such as steel angles,posts,angles,staircases,storage containers,st

    Oct 19, 2021

    Resolve
  • Class - 1

    Failure to safety equipment measure note:at the time of my inspection responding to compliant where a worker got injured at 5th floor.inspection reveal that worker was operating electric moter mixture machine w

    Oct 15, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Pre-shift safety meeting content.note:at time of my inspection responding to complaint that where one worker got injured during fire proofing machines operating upon request for pre shift safety meeting did not

    Oct 15, 2021 · Penalty $625

    Resolve
  • Class - 1

    Bc 3314.1 failure to maintain supported pipe scaffold not guardrails inadequate platform.note:at time of my inspection of a 9 story buildingat 9th floor level under construction.i observed supported pipe scaffo

    Oct 15, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Bc 3314.4 failure to provide proper inspection note:at time of my inspection observed supported pipe scaffold installed outside of the building up 9th floor level and not inspected properly as required workers

    Oct 15, 2021 · Penalty $625

    Resolve
  • Class - 1

    Bc 1905.6.3.3 final curing:failure to property laboratory cure concrete cylinders in accordance with astm c31.10.1.2,10.1.3 and 11.as noted at time of inspection at nycdob actively licensed concrete testing lab

    Oct 5, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    At time of incident, lift director onsite of cd4794 under cn961/20, rodney babwah , failed to perform duties. hoisting steel column outside of the crane's load chart causing the crane to flip over onto the buil

    Jul 2, 2021 · Penalty $10,000

    Resolve
  • Class - 1

    At time of incident, crane cd4794 under cn961/20 on site. crane flipped over onto building due to hmo disregarding crane's capacity limit. hmo pushed override button causing crane's shutoff to not engage. crane

    Jul 2, 2021 · Penalty $10,000

    Resolve
  • Class - 1

    Permit holder failure to ensure all workers receive site safety orientation.note:at time of inspection responding to incident (complaint #4850421) where a boom truck tipped over when lifting steel column to 2nd

    Jul 2, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by construction operations.note:at time of inspection responding to incident(complaint #4850421)where a mobile crane tipped over when lifting steel column

    Jul 2, 2021 · Penalty $5,000

    Resolve
  • Class - 1

    At time of incident, hmo keith brown #8082, operating cd4794 under cn961/20, flipped the crane sideways onto the building, causing damage to the boom of the crane, building, and sidewalk shed., safeguard public

    Jul 2, 2021

    Resolve
  • Class - 1

    At time of incident, hmo keith brown #8082, operating cd4794 under cn961/20, knowingly picked a steel column weighing 2600 lbs, outside of the crane's load chart, and at a radius where the crane's capacity was

    Jul 2, 2021 · Penalty $10,000

    Resolve
  • Class - 1

    At time of incident, user of crane cd4794 under cn961/20, classic iron designs, was attempting to hoist a steel cloumn, weighing 2600 lbs at a radius of 104', outside of the crane's capacity at that radius, cau

    Jul 2, 2021

    Resolve
  • Class - 1

    At time of incident, crane cd4794 under cn961/20 on site. crane picking steel column at a radius outside of the crane's capacity, causing the crane to flip over onto building. thus causing damage to crane and s

    Jul 2, 2021 · Penalty $10,000

    Resolve
  • Class - 2

    Bc330747-work or storage zone.note:at the time of my inspection of an active 9 story new building currently at 2nd floor,i observed a storage and work zone adjacent to sidewalk shed at exposure one.i also obser

    Jun 29, 2021

    Resolve
  • Class - 2

    Inadequate work/storage zone at the time of inspection of a proposed 9story new building at 2nd story framing active jobsite observed construction equipment materials and crane placed on exp#1 roadway and not e

    Jun 21, 2021 · Penalty $625

    Resolve
  • Class - 2

    Yodocks not locked in place or waterfilled as per manufacturer specifications.at the time of inspection of a proposed 9 story new building at 2nd story framing active jobsite observed approx 15ft of roadway wid

    Jun 21, 2021

    Resolve
  • Class - 1

    Bc 3307.1 failure to obtain dot permit for a crane placement on streetat the time of inspection of a proposed & story new building at 2nd story framing jobsite with ongoing crane operations at exp#1 observed cr

    Jun 21, 2021 · Penalty $625

    Resolve
  • Class - 1

    Earthwork notification number expired.at the time of my inspection at a 9 story building under construction currently at excavation phase.after researching on bis i obseved that the earthwork notification numbe

    Mar 2, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Contractor's license expired.at the time of my inspection at a 9 storybuilding under construction,i observed construction operation in place-installing piles,excavation phase,upon research on bis i observed tha

    Mar 2, 2021 · Penalty $625

    Resolve

Complaints

  • Heating

    Heat related

    Dec 17, 2006 · Apt 2C

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Office building (O6)
Year built
2021
Floors
9
Residential units
—
Building area
47,449 ft²
Lot area
6,692 ft²
Zoning
M1-5
Community board
401
Council district
26
Block / lot
639 / 1
Assessed value
$3,850,650
Landmark / historic district
No

Questions about 35-01 36 Avenue

Who owns 35-01 36 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 35-01 Astoria Owner LLC.

Does 35-01 36 Avenue have violations?

NYC HPD has no housing violations on record for this property.

Is 35-01 36 Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 35-01 36 Avenue built?

City records list 2021 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.