36-44 37 Street
Queens, NY 11106BBL 4-00636-0047Map
Owner of record: Ruth Stein Trust
36-44 37 Street is a warehouse built in 1961 in Queens, 11106. The owner of record is Ruth Stein Trust. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 18
- ECB violations
- 8
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 18
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active
Show 8 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active
ECB violations · 8
- Class - 2
Work without permit. noted: at first floor level erected full height partition walls with doors creating (2) rooms for changing/dressing room and (2) bathrooms with toilets. installed water & waste lines for (2
Oct 17, 2018 · Penalty $1,250
Active - Class - 2
Occupancy contrary to that allowed by the certificate of occupancy or building dept records. coq #178302 indicates a (1) story warehouse for auto parts sales and service. illegal occupancy noted. at first fl l
Oct 17, 2018 · Penalty $1,250
Active - Class - 1
Failure to maintain bldg wall or appurentances at time of inspection at front exterior brick wall observed defects in facade defects noted there are 3 cracks approx 4 in length at lintel above a/c wall sleeves
Aug 5, 2008 · Penalty $1,000
Resolve - Non-hazardous
18a/18b/50a/50b:50a-remove direct connection of boiler blow down line from sewer line/50b-boiler requires a blow down separate installed
Jan 9, 2007
Resolve - Non-hazardous
18a,18b,50a,50b:50a-remove direct connection of boiler blow down line from sewer line/50b-boiler requires a blow down seperator installed.
Jan 9, 2007
Resolve - Non-hazardous
48(a)(b). fulton v.t boiler, nb 84388, 20hp, gas-fired, 1999. 48(a)(b) heavy steam leakage at gauge glass assembly. replacement required.
Jul 25, 2003 · Penalty $180
Resolve - Non-hazardous
44a,48a,b. fulton v.t boiler, nb 63540, 20hp, gas fired, 1991. 44(a) the system pressure gauge has a dial range of o-200 psi. replaces with a o-300psi gauge. 48(a)(b) steam leakage at gauge glass assembly.
Jul 25, 2003 · Penalty $180
Resolve - Hazardous
4a-49-flu pipe not sealed
Jan 14, 2002
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Warehouse (E9)
- Year built
- 1961
- Floors
- 2
- Residential units
- —
- Building area
- 16,850 ft²
- Lot area
- 17,500 ft²
- Zoning
- M1-1
- Community board
- 401
- Council district
- 26
- Block / lot
- 636 / 47
- Assessed value
- $894,150
- Landmark / historic district
- No
Questions about 36-44 37 Street
Who owns 36-44 37 Street?
The owner of record in NYC Department of City Planning PLUTO data is Ruth Stein Trust.
Does 36-44 37 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 36-44 37 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 36-44 37 Street built?
City records list 1961 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.