roofy

35-40 31 Street

Queens, NY 11106BBL 4-00603-0040Map

Owner of record: Lc 31 Street LLC

35-40 31 Street is a mixed residential and retail building built in 1927 in Queens, 11106. It has 5 residential units across 3 floors. The owner of record is Lc 31 Street LLC. HPD has recorded 57 housing violations here, most recently on March 30, 2026. 5 of the 50 most recent violations are still open.

HPD violations
57
DOB violations
3
ECB violations
1
HPD complaints
20

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Mar 30, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 57

  • C

    Replace or repair the self-closing doors that is missing or defective bulkhead door hinges , 3rd story

    Mar 30, 2026

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Mar 30, 2026

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox incorrect sign material

    Mar 30, 2026

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings incorrect sign material

    Mar 30, 2026

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 21, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 11, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective bulkhead door hinges , 3rd story

    Jan 8, 2025

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Jan 8, 2025

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Jan 8, 2025

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Jan 8, 2025

    Closed — Violation closed
Show 40 more ↓
  • C

    Remove the illegal fastening consisting of slidebolt with eye capable of being padlocked at bulkhead door at public hall, 3rd story

    Jul 5, 2024

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 3f, 3rd story, 1st apartment from south at west

    Jul 5, 2024 · Apt 3F

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 3f, 3rd story, 1st apartment from south at west

    Jul 5, 2024 · Apt 3F

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 3rd story, 1st apartment from south at west

    Jul 5, 2024 · Apt 3F

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3f, 3rd story, 1st apartment from south at west

    Jul 5, 2024 · Apt 3F

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3f, 3rd story, 1st apartment from south at west

    Jul 5, 2024 · Apt 3F

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of household items at public hall, 3rd story

    Jul 5, 2024

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 12, 2024

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall in the foyer located at apt 3f, 3rd story, 1st apartment from west at north

    Sep 16, 2023 · Apt 3F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen located at apt 3f, 3rd story, 1st apartment from west at north

    Sep 16, 2023 · Apt 3F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at east, the bathroom located at apt 3f, 3rd story, 1st apartment from west at north

    Sep 16, 2023 · Apt 3F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall door, 2nd closet from south at west wall door in the foyer located at apt 3f, 3rd story, 1st apartment from west at north

    Sep 16, 2023 · Apt 3F

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 3f, 3rd story, 1st apartment from west at north

    Sep 16, 2023 · Apt 3F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department , west wall, south wall, 1st window frame from north at east wall, ceiling in the kitchen located at apt 3f, 3rd story, 1st apartment from west at north

    Sep 16, 2023 · Apt 3F

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at the ceiling in the kitchen located at apt 3f, 3rd story, 1st apartment from west at north

    Sep 16, 2023 · Apt 3F

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... at the east wall and appx 12 sq ft ceiling in the bathroom located at apt 3f, 3rd story, 1st apartment from west at north

    Sep 16, 2023 · Apt 3F

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over ceiling in the kitchen located at apt 3f, 3rd story, 1st apartment from north at east

    Sep 14, 2023 · Apt 3F

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective mortise lock and assembly in the entrance located at apt 3f, 3rd story, 1st apartment from north at east

    Sep 14, 2023 · Apt 3F

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures electrical outlet on west wall in the 2nd room from east located at apt 3f, 3rd story, 1st apartment from north at east

    Sep 14, 2023 · Apt 3F

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of consisting of plant pots and construction material on 3rd story public hall stairs to roof , 3rd story

    Sep 14, 2023

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... approx 10 sq ft at south wall and ceiling in the bathroom located at apt 3f, 3rd story, 1st apartment from north at east

    Sep 14, 2023 · Apt 3F

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 3f, 3rd story, 1st apartment from east at south

    Jun 7, 2023 · Apt 3F

    Open — Lead docs submitted, not acceptable
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the foyer located at apt 3f, 3rd story, 1st apartment from east at south

    Jun 7, 2023 · Apt 3F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department .. 1st window frame from east at south wall, south wall, west wall, 1st door from west at north wall in the 4th room from north at east located at apt 3f, 3rd story, 1st apartment from east at south

    Jun 7, 2023 · Apt 3F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls, ceiling and trim in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south

    Jun 7, 2023 · Apt 3F

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 2 in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south

    Jun 7, 2023 · Apt 3F

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 3f, 3rd story, 1st apartment from east at south

    Jun 7, 2023 · Apt 3F

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of protruding nails from wood floor in the 4th room from north at west located at apt 3f, 3rd story, 1st apartment from east at south

    Jun 7, 2023 · Apt 3F

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south

    Jun 7, 2023 · Apt 3F

    Closed — Violation closed
  • B

    Abate the infestation consisting of bedbugs in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south

    Jun 7, 2023 · Apt 3F

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of protruding nails from wood floor in the 4th room from north at east located at apt 3f, 3rd story, 1st apartment from east at south

    Jun 7, 2023 · Apt 3F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at east wall, west wall, 1st door from west at north wall in the 4th room from north at west located at apt 3f, 3rd story, 1st apartment from east at south

    Jun 7, 2023 · Apt 3F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at west wall, ceiling in the bathroom located at apt 3f, 3rd story, 1st apartment from east at south

    Jun 7, 2023 · Apt 3F

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation at 1st riser from east at south wall in the bathroom located at apt 3f, 3rd story, 1st apartment from east at south

    Jun 7, 2023 · Apt 3F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from south at west wall in the 3rd room from north located at apt 3f, 3rd story, 1st apartment from east at south

    Jun 7, 2023 · Apt 3F

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south

    Jun 7, 2023 · Apt 3F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, east wall in the 4th room from north at east located at apt 3f, 3rd story, 1st apartment from east at south

    Jun 7, 2023 · Apt 3F

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st window frame from east at south wall in the 4th room from north at west located at apt 3f, 3rd story, 1st apartment from east at south

    Jun 7, 2023 · Apt 3F

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall in the 3rd room from north located at apt 3f, 3rd story, 1st apartment from east at south

    Jun 7, 2023 · Apt 3F

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the bathroom located at apt 3f, 3rd story, 1st apartment from east at south

    Jun 7, 2023 · Apt 3F

    Open — Defect letter issued

DOB building violations · 3

  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed

ECB violations · 1

  • Class - 2

    Licensed rigger failed to place appropriate "danger" sign while using rigging equipment observed. using a 2 pt susp. scaffold at exposure one) w/out danger signs for public protection. remedy: provide proper

    Apr 17, 2009

    Resolve

Complaints

  • Safety

    Fire escape

    Aug 7, 2025 · Apt BLDG

    Close
  • Door/window

    Door

    Aug 7, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 7, 2025 · Apt BLDG

    Close
  • Door/window

    Door

    Sep 2, 2023 · Apt 3F

    Close
  • Door/window

    Door

    Sep 2, 2023 · Apt 3F

    Close
  • Flooring/stairs

    Floor

    Sep 2, 2023 · Apt 3F

    Close
  • Safety

    Fire escape

    May 31, 2023 · Apt 3F

    Close
  • Plumbing

    Basin/sink

    May 31, 2023 · Apt 3F

    Close
  • General

    Cabinet

    May 31, 2023 · Apt 3F

    Close
  • Electric

    Wiring

    May 31, 2023 · Apt 3F

    Close
Show 10 more ↓
  • Flooring/stairs

    Floor

    May 31, 2023 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    May 31, 2023 · Apt 3F

    Close
  • Paint/plaster

    Wall

    May 31, 2023 · Apt 3F

    Close
  • Paint/plaster

    Wall

    May 31, 2023 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    May 31, 2023 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    May 31, 2023 · Apt 3F

    Close
  • Nonconst

    Vermin

    Jul 3, 2006 · Apt 3F

    Close
  • Nonconst

    Vermin

    Jul 3, 2006 · Apt 3F

    Close
  • Nonconst

    Vermin

    Jul 3, 2006 · Apt 3F

    Close
  • Paint/plaster

    Wall

    Jul 3, 2006 · Apt 3F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S5)
Year built
1927
Floors
3
Residential units
5
Building area
4,200 ft²
Lot area
2,000 ft²
Zoning
R5
Community board
401
Council district
22
Block / lot
603 / 40
Assessed value
$651,150
Landmark / historic district
No

HPD registration #413380, last renewed Mar 11, 2026.

Questions about 35-40 31 Street

Who owns 35-40 31 Street?

The owner of record in NYC Department of City Planning PLUTO data is Lc 31 Street LLC.

Does 35-40 31 Street have violations?

Yes. NYC HPD has recorded 57 housing violations at this property.

Is 35-40 31 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 35-40 31 Street built?

City records list 1927 as the year it was built.

How many apartments are in 35-40 31 Street?

It has 5 residential units and 6 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.