36-07 31 Street
Queens, NY 11106BBL 4-00600-0125Map
Owner of record: Jalalabad Usa INC.
36-07 31 Street is a two-family home built in 1925 in Queens, 11106. It has 2 residential units across 2 floors. The owner of record is Jalalabad Usa INC.. HPD has recorded 44 housing violations here, most recently on August 16, 2002. 44 of the 44 most recent violations are still open.
- HPD violations
- 44
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 0
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 44
- BHazardous
Provide adequate lighting for vestibule at public hall, 1st story
Aug 16, 2002
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures kitchen and bathroom in the entire apartment located at apt 2, 2nd story
Aug 16, 2002 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story
Aug 16, 2002 · Apt 2
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the roof extention at rear of building
Aug 10, 2002
Open — Nov sent out - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard
Aug 10, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2, 2nd story
Aug 10, 2002 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2, 2nd story
Aug 10, 2002 · Apt 2
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet / in the bathroom located at apt 2nd, 2nd story
Aug 10, 2002 · Apt 2ND
Open — Nov sent out - BHazardous
Replace with new the broken or defective faucet at sink in the kitchen located at apt 2, 2nd story
Aug 10, 2002 · Apt 2
Open — Nov sent out - BHazardous
Repair by closing so as to be gas tight all openings in the wasteline at washbasin in the bathroom located at apt 2, 2nd story
Aug 10, 2002 · Apt 2
Open — Nov sent out
Show 34 more ↓
- BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2r, 2nd story
Apr 24, 2002 · Apt 2R
Open — Nov sent out - BHazardous
Repair by closing so as to be gas tight all openings in the drain pipe at sink in the kitchen located at apt 2r, 2nd story
Apr 24, 2002 · Apt 2R
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2r, 2nd story
Apr 24, 2002 · Apt 2R
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the extension roof east at apt #2 kit. window , 2nd story
Sep 1, 2001 · Apt 2ND
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin water bugs,evidence found in the entire apartment located at apt 2 , 2nd story, apartment at east
Sep 1, 2001 · Apt 2
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard at east
Sep 1, 2001
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice,evidence found in the kitchen located at apt 2 , 2nd story
Sep 1, 2001 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls throughout in the entire apartment located at apt 2, 2nd story
Apr 11, 2001 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2nd, 2nd story
Apr 11, 2001 · Apt 2ND
Open — Nov sent out - BHazardous
Repair by closing so as to be gas tight all openings in the wasteline at kitchen sink in the kitchen located at apt 2, 2nd story
Apr 11, 2001 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles missing at east wall in the bathroom located at apt 2nd, 2nd story
Apr 11, 2001 · Apt 2ND
Open — Nov sent out - BHazardous
Replace with new the broken or defective gas stove knobs in the kitchen located at apt 2nd, 2nd story
Apr 11, 2001 · Apt 2ND
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2fl, 2nd story
Mar 25, 2001 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from east located at apt 2fl, 2nd story
Mar 25, 2001 · Apt 2FL
Open — Nov sent out - BHazardous
Replace with new the broken or defective vinyl tiles on floor in the 1st room from east located at apt 2fl, 2nd story
Mar 25, 2001 · Apt 2FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice droppings roaches in the entire apartment located at apt 2, 2nd story
Jul 7, 2000 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective rubber gasket around refrigerator doors in the kitchen located at apt 2, 2nd story
Jul 7, 2000 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective gas burners at stove in the kitchen located at apt 2, 2nd story
Jul 7, 2000 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the kitchen located at apt 2, 2nd story
Jul 7, 2000 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets kitchen sink in the kitchen located at apt 2, 2nd story
Jul 7, 2000 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets washbasin in the bathroom located at apt 2, 2nd story
Jul 7, 2000 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles in the bathroom located at apt 2, 2nd story
Jul 7, 2000 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings east room and closet in the 1st bedroom from east located at apt 2, 2nd story
Jul 7, 2000 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed leak over windows in the 1st bedroom from east located at apt 2, 2nd story
Jul 7, 2000 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2fl, 2nd story
Apr 15, 2000 · Apt 2FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2fl, 2nd story
Apr 15, 2000 · Apt 2FL
Open — Nov sent out - BHazardous
Replace with new the missing gasket refrigerator in the kitchen located at apt 2fl, 2nd story
Apr 15, 2000 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets hot water kitchen sink in the kitchen located at apt 2fl, 2nd story
Apr 15, 2000 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective and make operable pilot light at gas range in the kitchen located at apt 2fl, 2nd story
Apr 15, 2000 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyil tile in the 2nd bedroom from east located at apt 2fl, 2nd story
Apr 15, 2000 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyil tile in the 1st private hallway from south located at apt 2fl, 2nd story
Apr 15, 2000 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the 1st bedroom from east located at apt 2fl, 2nd story
Apr 15, 2000 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color east wall in the bathroom located at apt 2fl, 2nd story
Apr 15, 2000 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the bathroom located at apt 2fl, 2nd story
Apr 15, 2000 · Apt 2FL
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Hazardous
Failure to retain water: work noted in rear of building pipe protecding from roof over windows. remedy: maintain plumbing install liter lme to inside dcainage system.
Feb 5, 2003 · Penalty $800
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B3)
- Year built
- 1925
- Floors
- 2
- Residential units
- 2
- Building area
- 1,463 ft²
- Lot area
- 1,575 ft²
- Zoning
- M1-2/R6A
- Community board
- 401
- Council district
- 26
- Block / lot
- 600 / 125
- Assessed value
- $65,400
- Landmark / historic district
- No
Questions about 36-07 31 Street
Who owns 36-07 31 Street?
The owner of record in NYC Department of City Planning PLUTO data is Jalalabad Usa INC..
Does 36-07 31 Street have violations?
Yes. NYC HPD has recorded 44 housing violations at this property.
Is 36-07 31 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 36-07 31 Street built?
City records list 1925 as the year it was built.
How many apartments are in 36-07 31 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.