33-34 Crescent Street
Queens, NY 11106BBL 4-00557-0003Map
Owner of record: Queensview INC
33-34 Crescent Street is an elevator apartment building built in 1950 in Queens, 11106. It has 726 residential units across 15 floors. The owner of record is Queensview INC. HPD has recorded 122 housing violations here, most recently on May 7, 2026. 2 of the 50 most recent violations are still open.
- HPD violations
- 122
- DOB violations
- 404
- ECB violations
- 107
- HPD complaints
- 386
Available now in this building
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. The newest 10 per agency here; the full lists are a click away.
HPD housing violations · 122
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at north located at apt 14a, 13th story, 1st apartment from west at north
May 21, 2025 · Apt 14A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 3rd room from east at north located at apt 14a, 13th story, 1st apartment from west at north
May 21, 2025 · Apt 14A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchen located at apt 14a, 13th story, 1st apartment from west at north
May 21, 2025 · Apt 14A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the 3rd room from north at west located at apt 14a, 13th story, 1st apartment from south at west
May 12, 2025 · Apt 14A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 3rd room from north at west located at apt 14a, 13th story, 1st apartment from south at west
May 12, 2025 · Apt 14A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the kitchen located at apt 14a, 13th story, 1st apartment from south at west
May 12, 2025 · Apt 14A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the kitchen located at apt 14a, 13th story, 1st apartment from south at west
May 12, 2025 · Apt 14A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 3rd room from east located at apt 14a, 13th story, 1st apartment from west at north
May 10, 2025 · Apt 14A
Open — Not complied with
DOB building violations · 404
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed
ECB violations · 107
- Class - 2
Upon inspection i observed a temp construction chain link fence installed at expos 4 without a fence project info panel installed contrary to code: 3301.9.1- where a site is enclosed with a fence in accordance
Oct 29, 2024 · Penalty $1,280
Resolve - Class - 2
I observed pedestrian protection (sidewalk shed) installed @ expos 1,2&4 contrary to codes: 3307.6.4.7 height- pipe header across pathway set at approx. 7ft 2in near main entry at expos 2. 3307.6.4.11 color- in
Oct 4, 2024 · Penalty $2,400
Resolve - Class - 2
I observed a temp chain link construction fence installed at all exposures contrary to code 3307.7.4 chain link fences or gates. posts shall be suitable for setting in concrete footings, for driving into the g
Oct 1, 2024 · Penalty $1,000
Resolve - Class - 2
Upon inspection i observed a sidewalk shed/overhead protection installed at exposure 4 entry contrary to code 3307.6.4.11 color - sidewalk sheds erected on or after july 1, 2013: vertical members, cross bracing
Oct 1, 2024 · Penalty $1,250
Resolve - Class - 2
3309.11 protection of trees during constuction. upon inspection of an active facade alt construction site i observed no tree protection provided for multiple trees at exposure 1. protection meeting the requirem
Sep 30, 2024 · Penalty $2,500
Resolve - Class - 2
Upon inspection of an active 14 story alt construction site i observed a chain link construction fence installed at exposures 1,2&4 contrary to code 3307.7.4 - chain link fences or gates. the fence or gate shal
Sep 30, 2024 · Penalty $1,000
Resolve - Class - 2
I observed pedestrian protection (sidewalk shed) installed at expos 1,2&4 contrary to codes 3307.6.4.7- minimum 8ft clear ceiling height not maintained. pipes set approx. at 7ft 3" across pedestrian pathway. sh
Sep 30, 2024 · Penalty $2,400
Resolve - Class - 2
Upon inspection of an active 14 story alt facade repair construction site i observed a chain link fence installed at all exposures with no cloth contrary to code 3307.7.4 chain link fences or gates- the fence o
Sep 27, 2024 · Penalty $1,000
Resolve - Class - 2
Upon inspection of an active 14 story facade repair construction site i observed pedestrian protection (sidewalk shed) installed at expos 1&4 contrary to code: 3303.8.2 free from obstruction- no red light provi
Sep 27, 2024 · Penalty $2,400
Resolve - Class - 2
Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #910653. remedy: submit acceptable requ
Apr 11, 2024 · Penalty $1,250
Resolve
Complaints
- Heat/hot water
Apartment only
Dec 19, 2025 · Apt 5D
Close - Heat/hot water
Apartment only
Nov 27, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Nov 25, 2025 · Apt 4B
Close - Heat/hot water
Apartment only
Nov 24, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Nov 22, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Nov 19, 2025 · Apt 4B
Close - Heat/hot water
Apartment only
Nov 18, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Nov 13, 2025 · Apt 4B
Close - Heat/hot water
Apartment only
Nov 6, 2025 · Apt 4B
Close - Heat/hot water
Apartment only
Nov 5, 2025 · Apt 4B
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Sep 8, 2026 | $370,000 | Coops - elevator apartments | — |
| Aug 26, 2026 | $525,000 | Coops - elevator apartments | — |
| Jul 30, 2026 | $379,000 | Coops - elevator apartments | — |
| Jul 24, 2026 | $560,000 | Coops - elevator apartments | — |
| Jul 7, 2026 | $400,000 | Coops - elevator apartments | — |
| Jun 30, 2026 | $350,000 | Coops - elevator apartments | — |
| Jun 24, 2026 | $995,000 | Coops - elevator apartments | — |
| Jun 16, 2026 | $389,000 | Coops - elevator apartments | — |
| Jun 15, 2026 | Non-market transfer | Coops - elevator apartments | — |
| May 11, 2026 | $390,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1950
- Floors
- 15
- Residential units
- 726
- Building area
- 563,800 ft²
- Lot area
- 449,820 ft²
- Zoning
- R5
- Community board
- 401
- Council district
- 22
- Block / lot
- 557 / 3
- Assessed value
- $20,631,600
- Landmark / historic district
- No
HPD registration #409293, last renewed Sep 23, 2026.
Questions about 33-34 Crescent Street
Who owns 33-34 Crescent Street?
The owner of record in NYC Department of City Planning PLUTO data is Queensview INC.
Does 33-34 Crescent Street have violations?
Yes. NYC HPD has recorded 122 housing violations at this property.
Is 33-34 Crescent Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 33-34 Crescent Street built?
City records list 1950 as the year it was built.
How many apartments are in 33-34 Crescent Street?
It has 726 residential units and 727 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.



