42-02 Orchard Street
Queens, NY 11101BBL 4-00265-0013Map
Owner of record: Bldg Orchard LLC
42-02 Orchard Street is an elevator apartment building built in 2022 in Queens, 11101. It has 824 residential units across 69 floors. The owner of record is Bldg Orchard LLC. HPD has recorded 1 housing violation here, most recently on May 11, 2026. 1 of the 1 most recent violations are still open.
- HPD violations
- 1
- DOB violations
- 13
- ECB violations
- 81
- HPD complaints
- 3
Available now in this building
For rentstudio condo for rent in long island city
New York, NY
For rentstudio condo for rent in long island city
New York, NY
For rentstudio condo for rent in long island city
New York, NY
For rent1-bedroom condo for rent in long island city
New York, NY
For rent1-bedroom condo for rent in long island city
New York, NY
For rent1-bedroom condo for rent in long island city
New York, NY
Show 9 more ↓
For rent2-bedroom condo for rent in long island city
New York, NY
For rent2-bedroom condo for rent in long island city
New York, NY
For rent2-bedroom condo for rent in long island city
New York, NY
For rent1-bedroom condo for rent in long island city
New York, NY
For rent2-bedroom condo for rent in long island city
New York, NY
For rent2-bedroom condo for rent in long island city
New York, NY
For rent2-bedroom condo for rent in long island city
New York, NY
For rent2-bedroom condo for rent in long island city
New York, NY
For rent3-bedroom condo for rent in long island city
New York, NY
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Open — Nov sent out
DOB building violations · 13
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 18, 2024
Dob violation - dismissed - Structurally compromised building none
Failure to submit an acceptable inspectn rpt for structurally compromised bldg.
Aug 15, 2024
Dob violation - dismissed - Construction other optional
Additional information.on 5/7/24 a fire occurred@the 66th fl level of the proposed 69 story nb structure under construction w/-re-shorng installed@the lvl of fire.fire dmg to the concrete slab.the engineer of record to immed investigate the dmg to the strctrl elements caused by fire&eval the structure stbility
May 9, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 1, 2024
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 17, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 17, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 17, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 17, 2021
Dob violation - resolved - High pressure boiler boiler required
Violation issued - failure to file 2017 external high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed
Show 3 more ↓
- High pressure boiler boiler required
Violation issued for failure to file 2013 annual high pressure boiler inspection
Mar 3, 2015
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 12, 2013
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 12, 2013
Dob violation - dismissed
ECB violations · 81
- Class - 2
At time of inspection observed: interference of traffic light signal at exposure# 4 jackson avenue side installed behind construction fence, contrary to bc 3307.6.4.9 creating a potential safety hazardous condi
Oct 18, 2025 · Penalty $2,400
Resolve - Class - 2
At time of inspection, i observed yodock system set up on the roadway for a temporary pedestrians walkway unballasted (not filled with water/sand) or usage of coupler allowing unintended movement of the barrier
Oct 11, 2025 · Penalty $1,250
Resolve - Class - 2
Bc 3307.1 at time of inspection observed construction chainlink fence obstruction the path to the fire hydrant. this creates unsafe conditions to public, property, and emergency services by not being able to ac
Oct 11, 2025 · Penalty $2,530
Resolve - Class - 1
Note an active jobsite, while responding to an incident where an electrician accidentally, trip and fell over a shovel protruding on an a-frame/dolly on the 36th floor hoist platform which, result in a face inj
Aug 4, 2025 · Penalty $2,500
Resolve - Class - 1
Responding an incident, where electrician edwin gomez fell off from extension ladder inspection revealed: gc failure to institute and maintain safety measures work contrary to specifications using extension lad
Jul 2, 2025 · Penalty $2,500
Resolve - Class - 1
Bc 3314.1 scope scaffold: during inspection of a supported scaffold at the roof level, i observed that there was missing guardrails and debris netting missing and did not fully enclose the scaffold as per code.
Mar 27, 2025 · Penalty $5,000
Resolve - Class - 1
Follow up inspection of material dislodged off 70story nb site observed housekeeping not maintained to code where loose debris(nails,cement&etc) outside of vertical safety netting system to leading edges&@roof
Jun 25, 2024
Resolve - Class - 1
Failure to safeguard all persons and property affected by construction operations. noted: several 4' x 8' sheets of insulation have been displaced from the east side of the 51 floor to ground level of adjacent
Jun 24, 2024 · Penalty $10,000
Resolve - Class - 2
3301.5 incident where a worker fell of ladder, inspection reveals: platform ladder had a broken/missing brace making equipment defective and unsafe to personnel during use. failure to correct and removed equipm
May 28, 2024 · Penalty $10,000
Resolve - Class - 1
@active 69 story nb site follow up to sites incident of fire occurred on 5/7/24 complaint# 4958744 reported by fdny with results of fire damaged concrete, observe-verified structural material failure(fire damag
May 8, 2024 · Penalty $5,000
Resolve
Show 40 more ↓
- Class - 1
@active 69story nb site with active concrete operations on 69th fl working deck observe standpipe riser up to 67th floor&nb gc failed to ensure standpipe hydrostatic was performed&submitted to dob (last submitt
May 8, 2024 · Penalty $5,000
Resolve - Class - 1
&industry safety standard for safe storage of lithium batteries for power tools.@active 69 story nb site follow up to incident of fire, inspection revealed site failed to comply with industry safety standard fo
May 8, 2024 · Penalty $2,500
Resolve - Class - 1
On 02-28-2024, rigging operation was observed using sling with missingtag. i verified there was no tag on the sling when the load was landed and i then examined the sling. therefore there was no way to, verify
Feb 28, 2024 · Penalty $2,500
Resolve - Class - 2
Observed cocoon w/out diaper installed/secured as per plans. conform all work to approved documents,
Feb 8, 2024
Resolve - Class - 2
No daily inspections for work being performed @ leading edge w/ inadequate inspection of fall protection equipment.conduct daily inspections for all leading edge work, adequateley inspect all fall protection
Feb 8, 2024
Resolve - Class - 2
Miscellaneous violations. suspended scaffold in use with tie-back points not maintained and w/out record of inspection before each use. remedy: comply with code, cease use of suspended scaffold. conform to appr
Feb 6, 2024 · Penalty $2,500
Resolve - Class - 2
Miscellaneous violations. work being performed at leading edge on scaffold w/caster wheels and tethered w/damaged make-shift rope contrary pre-shift meetings requirements. fall protection w/extensions on retrac
Feb 6, 2024 · Penalty $2,500
Resolve - Class - 2
Observed use of acetylene torch without fire-retardant ppe, observed torch work being conducted w/ inadequate fire retardant personal protection equipment.cease torch work, provide fire retardant ppe for person
Feb 6, 2024
Resolve - Class - 2
Cantilevered needle beams at expos-2 on 3 floor level not confirmed to approved plans. approved plans showed 25 beams, where in site conditions was 23 beam in placed. conform needle beam with approved plans or
Jan 26, 2024
Resolve - Class - 1
I observed temp wiring installed inthe stairwells to provide power to temp outlets and temp lights, without filing a an application. application # q00815120 does not cover work done., obtain permit; obtain temp
Dec 22, 2023 · Penalty $1,630
Resolve - Class - 2
Observed a temporary needle-beam platform at the 3rd fl at exp#3, approximately 50ft from grade, cantilevered approx. 20ft over the exp#3 adjoining property, being used as overhead protection. upon review of de
Nov 27, 2023
Resolve - Class - 1
Obsvd a temp needle-beam pltfm (ohp) at the 3rd fl at exp#3, approx 50ft from grade, cantilevered approx 20ft over the exp#3 adj prop. upon review of pe-aprvd dd, plan calls for all beams that do not extend a f
Nov 27, 2023 · Penalty $625
Resolve - Class - 2
Work after hours without a variance permit contrary to 28-105.12.5 at the time of inspection noted after hours construction work without a valid variance. work taking place observed, trucks pouring concrete and
Aug 5, 2023 · Penalty $625
Resolve - Class - 2
Bc 3301.6 failure to provide design drawing for temporary platform: at time on inspection it was observed temporary platform in use at the 2nd floor upon request for the design drawing for the platform none was
Aug 3, 2023
Resolve - Class - 2
Bc 3301.1.2 failure to have fireguard present at location as required as required by code: at time of inspection, it was observed at the 4th floor worker cutting rebar and generating spark, upon request for the
Aug 3, 2023
Resolve - Class - 2
Failure to maintain/display on site documents required by bc chaper 33: at time of inspection, it was observed shoring work with chime (wooden) supporting the floor above on the 2nd floor supporting the 3rd flo
Aug 3, 2023 · Penalty $1,250
Resolve - Class - 1
Worker klisman perez injured and wend to local area hospital by ambulance, while he was striping operation with 2 other workers (fares & sazo) and a about 150lb re-shore felt and hit his head, nose broken migh
Jun 19, 2023 · Penalty $2,500
Resolve - Class - 1
Failure to provide safety measures as per code, workers were performing under the crane swinging area with loads and no flag persons / spotter was provided and no caz was created. it could be life hazard for an
Jun 19, 2023 · Penalty $2,500
Resolve - Class - 1
Failure to provide / have permanent stairs as per code while the structure all ready above 40ft ( aprox 52ft) on 3rd flor deck. stop all work above 40ft (above 2nd flor), provide and maintain permanent stairs a
Jun 19, 2023
Resolve - Class - 1
While investigating a worker injury involving crawler crane cd 4622 cn 69222, it was discovered that jose irigoin was not a certified rigger. on 03/06/23, jose was injured while detaching rigging equipment conn
Mar 7, 2023
Resolve - Class - 1
While investigating a worker injury involving crawler crane cd 4622 cn 69222, it was discovered that jose irigoin was not a certified rigger. on 03/06/23, jose was injured while detaching rigging equipment conn
Mar 7, 2023
Resolve - Class - 1
At time of inspection, it was discovered that julio torres was not competent to perform lift director duties on 03/06/23. an incident occured in which a worker who was not rigging qualified was detaching a load
Mar 7, 2023 · Penalty $5,000
Resolve - Class - 1
At time of inspection, it was discovered that worker jose irigoin was actively engaged in rigging operations with no rigging certification. on 03/06/23, jose was injured while detaching rigging connected to cra
Mar 7, 2023
Resolve - Class - 1
At time of inspection, it was discovered that worker jose irigoin was actively engaged in rigging operations with no rigging certification. on 03/06/23, jose was injured while detaching rigging connected to cra
Mar 7, 2023 · Penalty $2,500
Resolve - Class - 1
While investigating an incident that occurred on 03/06/23, it was discovered that the crane log for cd 4622 cn 69222 was not properly maintained. the pre-shift meeting log for 03/06/23 did not provide specific
Mar 7, 2023
Resolve - Class - 2
Responding an incident inspection revealed: gc failure to institute maintain safety measures for construction operations, inadequate means of access when container is full of debris creating an unsafe slipperin
Mar 6, 2023
Resolve - Class - 1
Responding an incident inspection revealed: gc failure to keep and maintain adequate housekeeping creating an unsafe slippering and fall condition that occur. moving forward.
Mar 6, 2023
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#35454000n issued on 3/2/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without permit at 1
Mar 1, 2022 · Penalty $6,250
Resolve - Class - 1
Failure to comply w/commissioner's order contained in summons/v35454400n issued 3/2/20 &to file c/c pursuant to28-201.1&1rcny102-01.work w/opermit.@1fl created mezzanine level w/2pc bathrm,wooden walkway,etc.co
Jul 13, 2021 · Penalty $12,500
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35454401p issued on 03/02/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner.
Jul 2, 2021 · Penalty $3,125
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#35454400n issued on 3/2/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without a permit.re
Jun 2, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35454401p issued on 3/2/20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain.rem:co
May 12, 2021 · Penalty $3,125
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35454400n issued on 03/02/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a cert of c
Mar 16, 2021 · Penalty $6,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35454401p issued on 03/02/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a cert of c
Mar 16, 2021 · Penalty $3,125
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons.violation #35454400n issued on 03-02-20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-02.work without a permit co
Oct 22, 2020 · Penalty $6,250
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35454401p issued on 03-02-20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain comp
Oct 22, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to maintain bldg in code compliant manner at 3rd floor wood beam at exposure 3 & 4 in state of disrepair & has settled downward. remedy:repair/& or/replace.submit engineers report.
Mar 2, 2020 · Penalty $3,125
Resolve - Class - 1
Work w/out a permit:at 1st fl erected wood staircase & partitions to create a mezzanine level w/2 rms,2pc bathroom,wood walkway & storage platform.at exposure 1 wall cut opening in brick 3'x 7' to create storag
Mar 2, 2020 · Penalty $6,250
Resolve - Class - 2
Failure to comply w/commissioner's order to file a certificate of correction with the dob for nov #35035894x issued on 4/13/2015 pursuant to28-204.4 and 1rcny 102-01. rmdy: file a certificate of correction.
Jun 9, 2015 · Penalty $800
Resolve - Class - 2
Exit door not self closing.noted:at left side front,the fireproof exitdoor is not self closing.no device installed on door to close when open.supersedes ecb #35129240y.rem:comply with code, maintain door self c
Jun 9, 2015 · Penalty $500
Resolve
Complaints
- Safety
Smoke detector
Jul 20, 2026 · Apt ALL
Close - Safety
Smoke detector
Apr 16, 2026 · Apt 23D
Close - Safety
Carbon monoxide detector
Apr 16, 2026 · Apt 23D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2022
- Floors
- 69
- Residential units
- 824
- Building area
- 801,916 ft²
- Lot area
- 20,200 ft²
- Zoning
- M1-5/R9
- Community board
- 402
- Council district
- 26
- Block / lot
- 265 / 13
- Assessed value
- $55,331,700
- Landmark / historic district
- No
HPD registration #434605, last renewed May 6, 2026.
Questions about 42-02 Orchard Street
Who owns 42-02 Orchard Street?
The owner of record in NYC Department of City Planning PLUTO data is Bldg Orchard LLC.
Does 42-02 Orchard Street have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 42-02 Orchard Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 42-02 Orchard Street built?
City records list 2022 as the year it was built.
How many apartments are in 42-02 Orchard Street?
It has 824 residential units and 825 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.