23-30 Borden Avenue
Queens, NY 11101BBL 4-00068-0038Map
Owner of record: 23-30 Borden Owner LLC
23-30 Borden Avenue is a warehouse built in 2022 in Queens, 11101. The owner of record is 23-30 Borden Owner LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 34
- ECB violations
- 31
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 34
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 5, 2025
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 5, 2025
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 26, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - dismissed
Show 24 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 7, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 29, 2020
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2018
Jun 28, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 16, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 6, 2014
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 20, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 6, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 6, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 31
- Class - 1
Work without a permit. as noted at time of inspection on an active construction site 5 story new building respondent to an incident happen worker injury and fal on 12/02/2024 according to demolish work at stair
Dec 17, 2024 · Penalty $6,250
Resolve - Class - 1
5-story new building, incident: a carpenter fell and got seriously injured. damaged a-frame 5ft, improper type of ladder used for demolition of wiring conduit; 3 points of contact could not be maintained for th
Dec 2, 2024 · Penalty $12,500
Resolve - Class - 1
5-story new building active site observed area of construction incident stair j where two concrete runs and a landing are fully demolished. provided set of approved drawing is not reflecting the demolition work
Dec 2, 2024 · Penalty $6,250
Resolve - Class - 1
I observed on the fourth floor flexible sj cord hard wired into a breaker not per nec 400.8; 400.8, comply with ec code
Sep 20, 2024 · Penalty $4,000
Resolve - Class - 1
I observed on the fourth floor temporary installation of sj receptacle hard wired to a breaker to an open exposed electrical panel box. no application on file with d.o.b., obtain permit., obtain permit
Sep 20, 2024 · Penalty $1,600
Resolve - Class - 2
On exposure #1 in the 1st floor were installed mineral wool insulation thickness 2" with total r-value 8.6ci contrary to drawing which is total r-value 15ci., conform work to approved construction documents/ame
Apr 10, 2024
Resolve - Class - 1
While working on the 4th floor exposure 3 wall scaffold a worker fell through the open plank at approximately 20' high to the 4th floor slab injuring his head and wrist and was taken to a local hospital by ambu
Jul 15, 2023
Resolve - Class - 1
Failure to institute safety measures for temporary construction: at 4th floor exposure 3 wall scaffold, the pipe scaffold was missing hand rails and planking in various areas of the said scaffold at time of ins
Jul 15, 2023 · Penalty $2,500
Resolve - Class - 2
At the time of my inspection of an active 5 story nb construction site i observed a sidewalk shed installed at exposure 1 with no contractors parapet sign installed as per code 3301.9. a sign containing the own
Jun 3, 2023 · Penalty $3,125
Resolve - Class - 2
At the time of my inspection of an active 5 story nb construction site i observed pipe scaffold installed at exposure 2 approx. 72ft in height in use. after requesting to see a letter of installation none was p
Jun 3, 2023 · Penalty $3,125
Resolve
Show 21 more ↓
- Class - 2
At the time of my inspection of an active 5 story nb construction site i observed a sidewalk shed installed at exposure 1 contrary to approved drawings. incorrect sequence of cross bracing throughout and an 8ft
Jun 3, 2023 · Penalty $3,125
Resolve - Class - 1
At time of responding incident where turnbuckle fell from 4th floor level and landed on ground level hitting labor's right leg observed: gc failure to institute and maintain safety measures, as per pre-shift sa
Apr 28, 2023 · Penalty $12,500
Resolve - Class - 1
At time of responding incident where turnbuckle fell from 4th floor level and landed on ground level hitting labor's right leg observed: gc failure to institute and maintain safety measures, missing/ inadequate
Apr 28, 2023 · Penalty $6,250
Resolve - Class - 2
At time of responding incident where turnbuckle fell from 4th floor level and landed on ground level hitting labor's right leg observed: work contrary to approved drawings, no details and wind load calculations
Apr 28, 2023 · Penalty $3,125
Resolve - Class - 2
Bc2104.6 failure to provide masonry cmu block wall construction bracing in accoradance with tms 602/ aci 530.1/asci 6 section 3.3 as noted at time of inspection at active job site observed cmu at level #3 #2 #1
Mar 8, 2023
Resolve - Class - 1
Inspection of and 5 story building with work in progress, i observed a complaint where a work were hit with excavator bucket well performing rebar operation . i also observed excavator bucket were no secure to
Jul 20, 2022 · Penalty $12,530
Resolve - Class - 1
Inspection of an 5 story building with work in progress , i observed concrete operation at ground level . upon my request of construction document with approved stamp no was provide creating unsafe condition f
Jul 20, 2022 · Penalty $2,530
Resolve - Class - 1
Inspection of an 5 story building with work in progress, i observed concrete operation with rebar placement ,formwork, and steel placement . upon review department record for concrete manager there were no fili
Jul 20, 2022 · Penalty $2,530
Resolve - Class - 1
Inspection of an 5 story building with work in progress, i observed rebar placement and concrete form work. upon review doka panel worker have replace damage material with plywood. i also review approved desig
Jul 20, 2022 · Penalty $2,530
Resolve - Class - 2
Bc 3304.2 inadequate plan(soe)at time of inspection on an active jobsite observed new bulding under construction in pile-driving/soe phase.non-conformity noted:support of excavation(soe)does not include monitor
Mar 16, 2022
Resolve - Class - 2
Expired permit(temporary construction equipment)at time of inspection on an active jobsite,observed pile driving soe operations under permitq00464879-se.upon review on bis-dobnow found permit for support of exc
Mar 16, 2022
Resolve - Class - 1
Bc 3301.1.1.2 comply with fdny fire code(general)at time of inspectionon an active jobsite,observed welding/hot work operations.non conformity noted:(1)diesel fulled generator in operation is located 12 feet ap
Mar 16, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to provide required notification prior to commencement of demolition. at time of inspection,i observed 2 sty building already being demolished to grade as per approved plans. upon reviewing the bis syst
Apr 12, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to file annual certification that cooling tower 1000004717 hasbeen inspected,tested,& disinfected,& that a maintenance plan has beendeveloped & implemented by 11/1/16. remedy: file annual certification.
Jun 20, 2017 · Penalty $2,000
Resolve - Class - 1
Electrical work without a permit. warehouse note:at time of inspection5 per working for eel electric eel electric did not have permit issuedat time of inspection. jacob bleich handed me an app#303792 with lic #
Jul 25, 2012 · Penalty $1,600
Resolve - Class - 1
Property owner acting as outdoor advertising co failure to obtain valid oac registration number telvision shows remedy:remove illegal sign register
Nov 14, 2009 · Penalty $5,000
Resolve - Class - 1
Outdoor advertising co. failure to submit arterial sign registration info. television shows remedy: remove illegal sign registeredy:remove illegal sign
Nov 14, 2009 · Penalty $10,000
Resolve - Non-hazardous
Having prohibited illuminated flashing advertising signage. note permit# 401115994 was issued for a flashing accessory business sign. sign advertises url for west souy.com + earthbest.com remedy: remove illegal
Feb 25, 2002
Resolve - Non-hazardous
Work contrary to approved plans and permits that permit# 40111594 sa was approved and issued for the erection of a non advertising accessory business flashing sign. sign now has adverising copy with the url now
Feb 25, 2002
Resolve - Non-hazardous
Work without a permit. work noted: 1) excavated approx. 6'deep x 12' wide x 12'long under columns (10). 2) cut 4 - 4'x 4' holes in conc. slab around columns. remedy: stop all work. obtain a permit if feasibl
Jun 27, 2000
Resolve - Non-hazardous
Work without a permit:work noted excavated foundation trench approx 20"lx12"wx6"deep and lay reinforcing bars at 1st floor.remedy:"stop all work" obtain a permit if feasible or restore premises to prior legal c
Jun 22, 2000 · Penalty $250
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Warehouse (E9)
- Year built
- 2022
- Floors
- 5
- Residential units
- —
- Building area
- 777,258 ft²
- Lot area
- 203,236 ft²
- Zoning
- M3-2
- Community board
- 402
- Council district
- 26
- Block / lot
- 68 / 38
- Assessed value
- $77,554,350
- Landmark / historic district
- No
Questions about 23-30 Borden Avenue
Who owns 23-30 Borden Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 23-30 Borden Owner LLC.
Does 23-30 Borden Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 23-30 Borden Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 23-30 Borden Avenue built?
City records list 2022 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.