roofy

2251 Knapp Street

Brooklyn, NY 11229BBL 3-08821-0010Map

Owner of record: Soto James S

2251 Knapp Street is an elevator apartment building built in 1953 in Brooklyn, 11229. It has 162 residential units across 6 floors. The owner of record is Soto James S. HPD has recorded 88 housing violations here, most recently on September 11, 2026. 33 of the 50 most recent violations are still open.

HPD violations
88
DOB violations
36
ECB violations
19
HPD complaints
77

Available now in this building

What to know

Concern
9 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 11, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. The newest 10 per agency here; the full lists are a click away.

HPD housing violations · 88

  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1e, 1st story, 2nd apartment from south at west

    Sep 11, 2026 · Apt 1E

    Open — Civ14 mailed
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1e, 1st story, 2nd apartment from south at west

    Sep 11, 2026 · Apt 1E

    Open — Civ14 mailed
  • BHazardous

    Properly repair or replace the broken or defective latch set at the compactor closet door at public hall, 1st story

    Dec 5, 2025

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at the compactor closet door at public hall, 1st story

    Dec 5, 2025

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th story

    Dec 20, 2023

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective with fire retardant materials at ceiling at public hall, 6th story

    Dec 20, 2023

    Open — Nov sent out
  • BHazardous

    Repair the roof so that it will not leak at ceiling at public hall, 6th story

    Dec 20, 2023

    Open — Nov sent out
  • BHazardous

    Repair or replace the smoke detector defective in the entire apartment located at apt 6e, 6th story, 1st apartment from south at west

    Dec 20, 2023 · Apt 6E

    Open — Nov sent out
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 6e, 6th story, 1st apartment from south at west

    Dec 20, 2023 · Apt 6E

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6c, 6th story, 1st apartment from west at north

    Dec 12, 2023 · Apt 6C

    Open — Nov sent out
See all 88 HPD violations (10 shown here)

DOB building violations · 36

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 1, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 12, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 12, 2012

    Dob violation - resolved
See all 36 DOB violations (10 shown here)

ECB violations · 19

  • Class - 1

    Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips) report documenting the conditions of psid#b000

    Oct 1, 2024 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips) report documenting the conditions of psid#b000

    Oct 1, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Misaligned cab mirror. slack in tail rope. inoperative car phone. machine room door not fire rated.

    Jun 7, 2023 · Penalty $312

    Resolve
  • Class - 2

    Non fire rated machine room door.

    Dec 20, 2021

    Resolve
  • Class - 2

    Shorten gov rope. non fire rated mr door.

    Dec 20, 2021

    Resolve
  • Class - 2

    Misaligned cab mirror. missing in case of fire sign in basement

    Dec 8, 2021

    Resolve
  • Class - 2

    Eailure to maintain building wall(s) or appurtenances (exteiror) noted at the time of my inspection observed at exposure 1 and 3 of the above location three large ac units not being supported with brakec

    Nov 10, 2020 · Penalty $625

    Resolve
  • Class - 1

    No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. file application install dlm and perfor

    May 6, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. file application install dlm and perfor

    May 6, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. file application install dlm and perfor

    May 6, 2020 · Penalty $1,250

    Active
See all 19 ECB violations (10 shown here)

Complaints

  • Safety

    Smoke detector

    Jul 31, 2026 · Apt 1E

    Close
  • Heat/hot water

    Entire building

    Dec 5, 2025 · Apt 2F

    Close
  • Plumbing

    Water supply

    Dec 4, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 19, 2023 · Apt 6E

    Close
  • Heat/hot water

    Entire building

    Dec 11, 2023 · Apt 6C

    Close
  • Safety

    Window guard broken/missing

    Jun 11, 2023 · Apt 6G

    Close
  • Heat/hot water

    Apartment only

    Feb 10, 2023 · Apt 5H

    Close
  • Electric

    Lighting

    Nov 15, 2022 · Apt 6C

    Close
  • Unsanitary condition

    Mold

    Nov 15, 2022 · Apt 6C

    Close
  • Unsanitary condition

    Pests

    Nov 15, 2022 · Apt 6C

    Close
See all 77 HPD complaints (10 shown here)

Sales history

DatePriceTypeUnits
Sep 8, 2026$220,000Coops - elevator apartments—
Nov 13, 2025$249,500Coops - elevator apartments—
Nov 12, 2025$175,000Coops - elevator apartments—
Oct 28, 2025$240,000Coops - elevator apartments—
Oct 28, 2025Non-market transferCoops - elevator apartments—

Building details

Building type
Elevator apartment building (D4)
Year built
1953
Floors
6
Residential units
162
Building area
174,580 ft²
Lot area
84,200 ft²
Zoning
R5
Community board
315
Council district
46
Block / lot
8821 / 10
Assessed value
$7,610,400
Landmark / historic district
No

HPD registration #330800, last renewed Aug 25, 2026.

Questions about 2251 Knapp Street

Who owns 2251 Knapp Street?

The owner of record in NYC Department of City Planning PLUTO data is Soto James S.

Does 2251 Knapp Street have violations?

Yes. NYC HPD has recorded 88 housing violations at this property.

Is 2251 Knapp Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2251 Knapp Street built?

City records list 1953 as the year it was built.

How many apartments are in 2251 Knapp Street?

It has 162 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.