roofy

Violations at 34 West End Avenue

Brooklyn, NY 11235 · BBL 3-08713-0077 · Back to the property

HPD housing violations

No HPD violations on record

DOB building violations

The newest 50 of 83 DOB violations. The city keeps the complete history.

  • Construction other optional

    Partial vacate order due to unsafe notification filed for 60 west end ave as observed of cracked and displaced bricks at courtyard west elev ation and deteriorated bricks as well as unsecured hazard materials at playground at north elev.these conditions have therefore made the enti re courtyard and playground unable to be occupied.remedy:vacate

    Jun 5, 2024

    Dob violation - active
  • Hazardous condition (facade) facade required

    Cycle 9c unsafe report filed

    Jun 2, 2024

    Dob violation - active
  • Construction other optional

    Emergency work order due to cracked,spalling and deteriorated brick fa ce and stone as deteriorated mortar joints at multiple locations at ex p1 east elev and exp2 south elev and exp3 west elev.remedy:provide ade quate safety measures.repair unsafe facade as per 1rcny 103.04.file as unsafe report

    May 29, 2024

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)

    Aug 21, 2022

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 13, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 13, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 13, 2021

    Dob violation - resolved
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Jun 20, 2021

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 29, 2020

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2018

    Jun 28, 2020

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 28, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 28, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 30, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 30, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 30, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 25, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 25, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 25, 2017

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 17, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 28, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 28, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 8, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 8, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 8, 2016

    Dob violation - resolved
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years(2015)

    Jun 1, 2016

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2014

    May 14, 2016

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Jun 29, 2015

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Jun 29, 2015

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7c technical report by 02/21/2013

    Dec 31, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 1, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 1, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 1, 2013

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 19, 2012

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 8, 2012

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 8, 2012

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 28, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 28, 2010

    Dob violation - resolved

ECB violations

The newest 50 of 63 ECB violations. The city keeps the complete history.

  • Class - 2

    Failure to maintain building facade wall"s" and appurtenances. note: at the time of inspection, i observed at ex #4, north elevation, step cracked bricks near parapet level/roof. spalling mortar joints near roo

    Jul 8, 2026 · Penalty $2,500

    Active
  • Class - 2

    Failure to maintain exterior building facade and appurtenances. notes at the time of inspection observed at exposure 2 south elevation cracked brick with open mortar joints. at exposure 3 west cracked brick wit

    May 21, 2026 · Penalty $2,500

    Active
  • Class - 2

    Failure to file acceptable amended cycle 9c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #910486. remedy: file acceptable report.

    Apr 20, 2026 · Penalty $1,250

    Active
  • Class - 1

    Observed active facade operations using suspended scaffold, upon review the department records observed general contractor license# 618608 for facade operation non-registered and has tracking number only. also

    Mar 16, 2025 · Penalty $5,030

    Active
  • Class - 1

    Bc3303.10 operations in occupied buildings.observed active facade operations using suspended scaffold in an occupied building with no barricades, signs, drop cloths, and other protective means. observed kids us

    Mar 16, 2025 · Penalty $5,030

    Resolve
  • Class - 1

    Observed active facade operations using suspended scaffold, upon request from rigger foreman for approved facade drawings, c-hook drawings ( bc 3314.3.3) and completion letter ( bc 3314.4.3.2), parapet inspect

    Mar 16, 2025

    Resolve
  • Class - 1

    Observed active facade operations using suspended scaffold at exp#1&4. upon review the department records ( bis & dob now) did not observe any after hour variance permit for construction operations on sunday 3/

    Mar 16, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain building facade and appurtenances. observed damaged mortar joints in multiple locations on exposure 1. also observed cracked stone work on exposure 2. remedy: maintain building facade. take

    Aug 1, 2024 · Penalty $1,250

    Active
  • Class - 1

    Failure to provide adequate safety measures. where required to protectpublic and property from unsafe facade as per 1rcny 103.04. at the time of inspection i observed inadequate safety measures at exp. #1 east

    May 29, 2024 · Penalty $10,000

    Resolve
  • Class - 2

    Replace worn gibs where needed. secure gibs where needed. adjust spring closures where needed. oil leaking into top of shaft/deflector sheave. unreadable controller fuses. seal hoist machine leaks. adjust right

    Nov 14, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Restore service to device in order to perform a full inspection.

    Nov 14, 2023 · Penalty $1,250

    Resolve
  • Class - 1

    Out of service. upon inspection, the device is found to be out-of-service remedy: restore to service immediately and, notify nycdob the device has been returned to service. e-mail [email protected] so an in

    Sep 10, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    Out of service. upon inspection, the device is found to be out-of-service remedy: restore to service immediately and, notify nycdob the device has been returned to service. e-mail [email protected] so an in

    Sep 10, 2021 · Penalty $312

    Active
  • Class - 1

    Repair in-car lights., repair in-car alarm ( works periodically)., repair in-car stop switch audible ( works periodically).

    Nov 20, 2020 · Penalty $312

    Resolve
  • Class - 1

    Work w/o a permit. on 8-29-18 @ approx 2:15pm i observed in the cellara new sprinkler system installed from cellar-1st fl w/o any approved or updated permit on file under dob records. remedy: obtain an approve

    Aug 29, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    New & altered sprinkler systems to be inspected in accordance w/bc sections 903 & 1704.21.1 on 8-29-18 @ approx 2:15pm i observed in the cellar a new sprinkler system installed from cellar-1st fl w/o any approv

    Aug 29, 2018 · Penalty $5,000

    Resolve
  • Class - 1

    Salnt fin boiler model #gg300e is not registerd.rem:register boiler & submit a cert of correction.

    Aug 15, 2017 · Penalty $250

    Active
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35226552h issued on 02/19/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for illegal occupancy. remedy: comply w/comm's order &/or file

    Jun 1, 2017 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/vio # 35226552h issued on 02/19/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for occupancy contary to that allowed by c of o #1

    Apr 22, 2017 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35207916x issued on 10/06/16 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for work w/o a permit. remedy: comply w/comm's order &/or file

    Mar 13, 2017 · Penalty $800

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by the c of o or bldg dept records.noted: co #178655 dated 2-19-62 issued by the dob has no record of portable day care. at the time of inspection 3 portables approx 18'x9'0 l

    Feb 19, 2017 · Penalty $3,000

    Resolve
  • Class - 1

    Work w/out a permit.failure to comply w/the comm's order contained in summons/vio# 35207916x issued on 10/6/16 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01.erected 3 portables & used as da

    Jan 22, 2017 · Penalty $800

    Resolve
  • Class - 2

    Occupancy contrary to that allowed by the c of o issued by dob.failureto comply w/the comm's order contained in summons/vio# 35222430l issued on 12/11/16 & to file a cert of correction pursuant to 28-201.1 & 1r

    Jan 22, 2017 · Penalty $800

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by the c of o or bldg dept records.noted: c of o issued by the dob #178655 dated 2-19-62 has no record ofportables day care. at the time of my inspection 3 portables are being

    Dec 11, 2016 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in nov #35207916x issued on 10/06/16 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny102-01. work w/o a permit. noted: 3 portables being erected & used as

    Dec 11, 2016 · Penalty $800

    Resolve
  • Class - 1

    Work w/o a permit. noted three portables being erected and used as day care along w/electrical wiring apprx 18'x90'l. no permit/job filing on the record for these portables.rmdy: obtain permit.

    Oct 6, 2016 · Penalty $800

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by the certificate of occupancy or building dept records. noted: certificate of occupancy issued by the dob #178655 dated feb19,1962 has no record of portable day care.at the

    Oct 6, 2016 · Penalty $1,200

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner.noted:@time of inspection observed exit door @stairwell north is 32" door.code requires a minimum of 36" door for proper egress out of bldg.fire doors are missi

    Oct 5, 2016 · Penalty $250

    Active
  • Class - 2

    Removal of sidewalk shed without department's approval.noted:at time of inspection,building facades were still designated as"unsafe"the amended facade report(tr6)received on 7-25-16 had not been accepted and sa

    Aug 10, 2016 · Penalty $400

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping. noted: at rear of bldg,pool area,2nd fl landing,storage of debris. remedy: maintain adequate housekeeping.

    Jul 26, 2016

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. use of prohited hardware. noted: rear exit doors at 1st fl,have sliding bolts hardware & key lock w/brackets to shed a wooden 2x4 styd. remedy: provide legal

    Jul 26, 2016 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to provide power for emergency exit lighting. noted: on 1st,kitchen area. emergency exit signs are inoperatable,no power source to signs. remedy: provide adequate power for emergency exit signs.

    Jul 26, 2016 · Penalty $250

    Resolve
  • Class - 1

    Sec. 27-1019(c) failure to provide proper storage of combustible material. noted: at pool house,where pool filter & heating system is located excessive storage of pool chemicals in cardboard boxes being stored

    Jul 26, 2016 · Penalty $250

    Resolve
  • Class - 1

    Failure to maintain bldg. noted: at rear of school,where swimming pools are located system are located,structure is in disrepair,metal system are located,structure is in disrepair metal roof is rotten w/opening

    Jul 26, 2016 · Penalty $1,000

    Resolve
  • Class - 1

    Sec. 305.2 misc violations: hazardous area-equipment & appliances having an ignition source shall not be installed in group'h' occupancies or control areas where open use,handling or dispensing of combustible,

    Jul 26, 2016 · Penalty $400

    Resolve
  • Class - 2

    Failure to provide approved plans at job site at time of inspection. noted: at time of inspection,active work site w/approx 6-8 workers. no approved plans on site to show removal of staircase & removal or windo

    Jul 26, 2016 · Penalty $530

    Active
  • Class - 2

    Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat

    Jan 26, 2015 · Penalty $800

    Active
  • Class - 2

    Fail to maintain bldg in code-compliant manner.note:@ 6fl lvl there exists in such existing perimeter sheetrock walls consist of cracks & holes.rem:repair/replace.

    Mar 19, 2014 · Penalty $250

    Resolve
  • Class - 1

    61g11,56y13,56d06,42g11.independent elevators inc,license no 504-001 submitted a noterized statement to be used un the dismisal of nov#38218299m.after an inspec conducted on march 2,2012 reveals that statement

    Mar 2, 2012 · Penalty $4,800

    Resolve
  • Class - 1

    61g11,56y13,56d06,42g11. filed a c/c or other related materials containing material false statements. respondent filed a c/c on 11.2.11 fornew #38218299m an inspection made on 3.2.12 resulted in the issuance

    Mar 2, 2012 · Penalty $4,800

    Resolve
  • Class - 2

    61g11,56y13,56d06,42g11.respondent failed to comply w/ the comms order to correct the violating conditions and file a cert of correction pursuant to section 28-204.4 for nov#38218299m a false certification was

    Mar 2, 2012 · Penalty $800

    Resolve
  • Class - 2

    *(60q03 60d06 40b07) 43x10 52x10 59y02 56y03 17h11 53b14 77b11 *recurring condition previously in nov#38218550n 60q-lighting 40b-provide proper ventilation per k3* 43x-repair or replace 52k-rouge developing 59x

    Mar 2, 2012

    Resolve
  • Class - 2

    *(56y13 42g11) 15m07 17h11 60d06 43x10 90b07 29q03 37y02 39m07 16h11 77b07 10j11 *recurring conditions previously cited in nov#38218298k 56y-seal leaks 42g-unreadable fuses 15m-certificat only 17h-replace where

    Mar 2, 2012

    Resolve
  • Class - 2

    61g11,56y13,56d06,42g11,02x10,52k10,37y02,17h11,17m07,16h11,53o02,77b11.recurring conditions previously cited in nov#38218299m.(61)unreadable fuses.(56y)seal leaks.(56d)secure conduit.(42g)unreadable fuses.(02x

    Mar 2, 2012

    Resolve
  • Class - 2

    50b10,40b07,56y13,60q03,60d06,42g11,17h11,17d06,76m07,70z09,39m07,37d 06. 50b- excessive (arcing). 40b- ventilation per k3. 56y- seal leaks 60b,d- lighting and conduit. 42g-unreadable fuses. 17hd-replace/secure

    Sep 23, 2011 · Penalty $500

    Resolve
  • Class - 2

    15m07,12m07,39y02,37y02,29q03,17h11,17d06,42g11,61g11,56y13,52y02,76m07,72j01,23i11,56d06,40y02,97x10. 15m- cert. 12m-additional lighting. 39,37,40- oil spills. 29q- cover. 17h- replace/secure where needed.

    Sep 23, 2011

    Resolve
  • Class - 2

    15m07,56y13,42g11,40b07,60d06,17h11,17d06,10v01,16j01,76m07. 15m- certificate. 56y- seal leaks. 76- unreadable. 40b- ventilation per k3.60d-lighting. 17hd- replace/secure where needed. 10v- adjust to (rise) at

    Sep 23, 2011 · Penalty $500

    Resolve
  • Class - 2

    60q03,60b07,56y13,59h11,42g11,41w06,40m07,69b11,17h11,17d06,03m07,16j01,16i10,100j01,70m07,72m07,81t07,25m07,33h11,33e01,10h11.(60q,b)provide additional lighting.(56y)seal leaks.(59h)worn pads.(42g)unreadable f

    Jan 5, 2011 · Penalty $250

    Resolve
  • Class - 2

    40r09,60q03,56y13,59h11,42g11,40m02,15m07,14j01,17h11,17d06,10h11,10j01,70m07,72m07,81t07,16j01,39y02,37y02,39q03,39l10,76j01,25m07.(40r)non elevator items.(60q)guards.(56y)seal leaks.(59h)replace pads.(42g)unr

    Jan 5, 2011 · Penalty $250

    Resolve
  • Class - 2

    17h11,17d06,26d06,15m07,14j01,56y13,59j01,60x10,42g11,99l07,61g11,40m07,40o02,69b11,10h11,10m07,70o02,10m07,72m07,81t07,25m07,16j01,37y02,39y02,39l10,16i10.(17h,d)replace/secure where needed.(26d)secure.(15m)pr

    Jan 5, 2011 · Penalty $250

    Resolve