Violations at 2859 Flatbush Avenue

Brooklyn, NY 11234 · BBL 3-08591-0150 · Back to the property

HPD housing violations

No HPD violations on record

DOB building violations

16 DOB violations, newest first.

  • Construction other optional

    The department of buildings under section 28-207.2 orders that you stop all work under permit # b08021093 on 10/05/26 due to the construction superintendent of record has informed the department that she or he has withdrawn from the project. stop all work immediately and make site safe.

    Oct 20, 2026

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2021

    Aug 21, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 25, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 8, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 8, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 8, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 8, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 8, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 8, 2017

    Dob violation - dismissed

ECB violations

18 ECB violations, newest first.

  • Class - 2

    Electrical work without a permit.on 3/3/23 at 9:30am i observed the following,in electrical service room on first floor,1 200amps service switch for t-mobile 2#3/0 feeders.also 1 generator located on first floo

    Mar 3, 2023 · Penalty $830

    Resolve
  • Class - 2

    Defective car phone. gov missing test tags. missing cat one tag. expired brake maint tag. expired maint log

    Jan 28, 2021 · Penalty $625

    Resolve
  • Class - 1

    Sec. 1rcny 3301-02(b)(c) failure to designate &/or have construction superintendent present at site as required. note: at the time of my inspection of a 3 sty commercial bldg at roof level,construction work in

    May 24, 2018 · Penalty $10,000

    Resolve
  • Class - 2

    Sec. 3301-02(d) logs. note: at the time of my inspection of a 3 sty bldg at roof level,construction work in progress. upon request for designated construction superintendent none was avaible or presence at site

    May 24, 2018

    Resolve
  • Class - 1

    Sec. 3303.10 operations in occupied bldgs. note: at the time of my inspection of a 3 sty bldg construction work in progress. i observed bldg was occupy & being use for automative sales & repair w/customers also

    May 24, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Use of power operated hoisting equipment without a hoisting machine license. at time of inspection, i observed the use of crane to erect steel for a pylon sign. the crane in use had a possible boom length, requ

    Apr 4, 2018 · Penalty $5,000

    Resolve
  • Class - 1

    Inadequate safety measures, operation of crane in an unsafe manner. at time of inspection i observed a crane with a load of steel attached to the hook for a pylon sign. when i approached the operators station f

    Apr 4, 2018 · Penalty $5,000

    Resolve
  • Class - 1

    Use of power operated hoisting machine without a hoisting machine license. at time of inspection, i observed the use of a crane to erect a pylon sign. efrain gonzalez: njsdl #g6459 19600 09747 told me he was th

    Apr 4, 2018 · Penalty $5,000

    Resolve
  • Class - 2

    Operation of a crane without a certificate of operation/no cd. at time of inspection i observed the use of a crane with a load attached to its load line for the installation of pylon sign. when i asked efrain g

    Apr 4, 2018 · Penalty $625

    Resolve
  • Class - 2

    Ecc-cmisc.nb job#320625506o.at time of an energy compliance inspectioni observed that there were eight(8)hvac root top units were installed which did not match the hvac roof top units indicated on energy and me

    Dec 22, 2017 · Penalty $800

    Resolve
  • Class - 1

    Sec. 3301.02 failure to adequately supervise site at a construction site so as to maintain a safe construction site & ensure compliance w/chapter 33,the following hazardous conditions observed & swo issued.

    Dec 13, 2016 · Penalty $1,600

    Resolve
  • Class - 2

    No project panel sign provided. noticed at time of inspection nb in progress noticed no project panel provided. remedy: provide project panel.

    Dec 13, 2016 · Penalty $400

    Resolve
  • Class - 2

    Sec. 3303.3 obstruction & crossing of sidewalk w/o dot permit. noticedjob site fence erected on sidewalk at exp#1 no dot permit. remedy: obtain dot permit.

    Dec 13, 2016

    Resolve
  • Class - 1

    Failure to safeguard. noticed at time of inspection nb in progress noticed approx 30 used cars for sale parked on site inside job site fence in area noticed used car sites man entering site to cars as well.

    Dec 13, 2016 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to safeguard. noticed at time of inspection nb in progress noticed fueling station refill for active marina is on site. trucks come in and refill tanks on site for more fueling station refill not protec

    Dec 13, 2016 · Penalty $10,000

    Resolve
  • Class - 1

    Sec. 3307.3.2 failure to provide job site fence. noticed at time of inspection nb in progress noticed site is one big site w/used cars parked on site as well as fueling station for marina on site & egress for

    Dec 13, 2016

    Resolve
  • Class - 1

    Sec. 3307.3 no overhead protection. noticed at time of inspection nb in progress noticed at exp#4 adjacent parking lot & driving lane for active toys r us store has no overhead protection nb erected above adjac

    Dec 13, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard. noticed at time of inspection 3 sty comm. nb in progress noticed at exp#3 active(marina)gas station ramp egress exits in & out into site. causing hazard to marina & site. non construction

    Dec 13, 2016 · Penalty $10,000

    Resolve