Violations at 9512 Schenck Street
Brooklyn, NY 11236 · BBL 3-08330-0005 · Back to the property
HPD housing violations
24 HPD violations, newest first.
- CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock installed at metal entrance door to building
Dec 13, 2006
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt top, 2nd story
Sep 15, 2005 · Apt TOP
Open — Nov sent out - ANon-hazardous
Repair the leaky and/or defective faucets washbasin in the 2nd bathroom from east located at apt top, 2nd story
Sep 15, 2005 · Apt TOP
Open — Nov sent out - BHazardous
Properly secure the loose handrail to the floor and wall at the stairs lower level to the upper level located at apt top, 2nd story
Sep 15, 2005 · Apt TOP
Open — Nov sent out - BHazardous
Properly secure the loose handrail to the wall 1 story to 2 story private hall stairs located at apt top, 2nd story
Sep 15, 2005 · Apt TOP
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color water damaged ceiling and walls in the closet upper level in the 2nd room from east at south located at apt top, 2nd story
Sep 15, 2005 · Apt TOP
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color water damaged ceiling and east wall lower level in the 1st room from north located at apt top, 2nd story
Sep 15, 2005 · Apt TOP
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls in the entire apartment located at apt top, 2nd story
Sep 15, 2005 · Apt TOP
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tile north wall in the 2nd bathroom from east located at apt top, 2nd story
Sep 15, 2005 · Apt TOP
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective caulking material at the shower door in the 2nd bathroom from east located at apt top, 2nd story
Sep 15, 2005 · Apt TOP
Open — Nov sent out - ANon-hazardous
Repair leaky water closet flush pipe connection in the 1st bathroom from east located at apt top, 2nd story
Sep 15, 2005 · Apt TOP
Open — Nov sent out - BHazardous
Repair the leaky and/or defective water supply pipe washbasin in the 1st bathroom from east located at apt top, 2nd story
Sep 15, 2005 · Apt TOP
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening key operated double cylinder lock apt etrance door located at apt 2flr, 2nd story
Sep 13, 2002 · Apt 2FLR
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ; in the bathroom located at apt 2flr, 2nd story
Sep 13, 2002 · Apt 2FLR
Open — Nov sent out - BHazardous
Properly secure the loose ceramic wall tiles ceiling over bath tub in the bathroom located at apt 2flr, 2nd story
Sep 13, 2002 · Apt 2FLR
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective sheet rock in the 1st room from east at south located at apt 2flr, 2nd story
Sep 13, 2002 · Apt 2FLR
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of a key operated double cylinder lock on entrance gate to building at public hall, 1st story
Mar 1, 2002
Open — Nov sent out - BHazardous
Properly secure the loose handrail 1 story to at public hall stairs, 2nd story
Mar 1, 2002
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass pane lower sash window in the southeast room located at apt 2, 2nd story
Mar 1, 2002 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective counter balance springs fo the windows in the northeast room located at apt 2, 2nd story
Mar 1, 2002 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective doorbell in the entire apartment located at apt 2, 2nd story
Mar 1, 2002 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass panes of the door in the terrace located at apt 2, 2nd story
Mar 1, 2002 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the northeast room located at apt 2, 2nd story
Mar 1, 2002 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the missing ceramic floor tiles in the bathroom located at apt 2, 2nd story
Mar 1, 2002 · Apt 2
Open — Nov sent out
DOB building violations
1 DOB violations, newest first.
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 28, 2011
Dob violation - dismissed
ECB violations
3 ECB violations, newest first.
- Class - 3
Occupancy contrary to that allowed by the cert of occupancy bldg dept records &/or all applicable laws & regulations. c of o # 202914 indicates recreation room,storage,laundry & one car garage at 1st floor. il
Apr 3, 2014 · Penalty $400
Active - Class - 1
Failure to comply w/ comm's order to correct vio#34883795x for work w/o permit .altered garage,removed door,installed windows+door to createresidential space.no record of correction.rem:comply w/ comm's order
Jan 21, 2011
Resolve - Class - 1
Work w/o permit.garage door was removed then replaced w/ a ent door & double hung windows.no permit on file for work.obtain work permit or restore to original condition.
Oct 30, 2010
Resolve