Violations at 1269 Remsen Avenue
Brooklyn, NY 11236 · BBL 3-08198-0014 · Back to the property
HPD housing violations
32 HPD violations, newest first.
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 5, 2026
Open — Info nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2floor, 2nd story, 1st apartment from east at south
Oct 3, 2026 · Apt 2FLOOR
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame in the private hallway located at apt 2floor, 2nd story, 1st apartment from east at south
Oct 3, 2026 · Apt 2FLOOR
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, west wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at south located at apt 2floor, 2nd story, 1st apartment from east at south
Oct 3, 2026 · Apt 2FLOOR
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2floor, 2nd story, 1st apartment from east at south
Oct 3, 2026 · Apt 2FLOOR
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at window frame at south wall in the bathroom located at apt 2floor, 2nd story, 1st apartment from east at south
Oct 3, 2026 · Apt 2FLOOR
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective shut off valve knob at radiator at east wall in the 1st room from east at south located at apt 2floor, 2nd story, 1st apartment from east at south
Oct 3, 2026 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at north wall in the 5th room from east at south located at apt 2floor, 2nd story, 1st apartment from east at south
Oct 3, 2026 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at first closet from north at east at south wall in the 5th room from east at north located at apt 2floor, 2nd story, 1st apartment from east at south
Oct 3, 2026 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by the method of reglazing at bathtub in the bathroom located at apt 2floor, 2nd story, 1st apartment from east at south
Oct 3, 2026 · Apt 2FLOOR
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak active water leak at west wall in the 1st room from east at south located at apt 2floor, 2nd story, 1st apartment from east at south
Oct 3, 2026 · Apt 2FLOOR
Open — Certification postponment denied - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 1, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures no volume at all faucets in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Sep 25, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1flr, 1st story, apartment at south
Nov 17, 2020 · Apt 1FLR
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1flr, 1st story, apartment at south
Nov 17, 2020 · Apt 1FLR
Open — Nov sent out - BHazardous
Properly repair the broken or defective closet door in the private hallway located at apt 1, 1st story, 1st apartment from east at south
Oct 28, 2020 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass pane at lower window sash in the 1st room from east at south located at apt 1, 1st story, 1st apartment from east at south
Oct 28, 2020 · Apt 1
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Oct 28, 2020 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Oct 28, 2020 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Oct 28, 2020 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches located at apt 1stflo, 1st story, 1st apartment from west at north
Oct 21, 2020 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair the broken or defective faucet at sink in the kitchen located at apt 1stflo, 1st story, 1st apartment from west at north
Oct 21, 2020 · Apt 1STFLO
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice located at apt 1stflo, 1st story, 1st apartment from west at north
Oct 21, 2020 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly secure the loose south metal handrail at stoop at front at building
Feb 26, 2018
Closed — Violation closed - BHazardous
Remove the illegal fastening double cylinder key operated lock at street entrance metal door to building
Feb 13, 2018
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls thru out in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Oct 25, 2006 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electric wire at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Oct 25, 2006 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the missing light fixture at ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Oct 25, 2006 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electric wire at ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Oct 25, 2006 · Apt 2
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Oct 25, 2006 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Oct 25, 2006 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the missing light bulb in vestibule fixture ceiling.
Jul 5, 2005
Open — Nov sent out
DOB building violations
No DOB violations on record
ECB violations
1 ECB violations, newest first.
- Class - 3
Work w/o permit. noted: at 1st fl apt now bearing sheetrock wall installed subdividing living to create extra bedroom. remedy: obtain permitor restore to its original.
Jan 31, 2020 · Penalty $500
Active