roofy

Violations at 757 East 103 Street

Brooklyn, NY 11236 · BBL 3-08191-0001 · Back to the property

HPD housing violations

21 HPD violations, newest first.

  • ANon-hazardous

    Properly repair the broken or defective piliot light at gas range in the kitchen located at apt 1b, 1st story, 1st apartment from east at south

    Oct 24, 2017 · Apt 1B

    Open — Nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the private hallway located at apt 1b, 1st story, 1st apartment from east at south

    Oct 24, 2017 · Apt 1B

    Open — Nov sent out
  • ANon-hazardous

    Properly repair with similar material the broken or defective vinyl floor tile in the kitchen located at apt 1b, 1st story, 1st apartment from east at south

    Oct 24, 2017 · Apt 1B

    Open — Nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchen located at apt 1b, 1st story, 1st apartment from east at south

    Oct 24, 2017 · Apt 1B

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at south wall in the kitchen located at apt 1b, 1st story, 1st apartment from east at south

    Oct 24, 2017 · Apt 1B

    Open — Nov sent out
  • ANon-hazardous

    Trace and repair the source and abate the nuisance consisting of mold ... mildew approx. 8 sq ft at ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from east at south

    Oct 24, 2017 · Apt 1B

    Open — Nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling. in the bathroom located at apt 1b, 1st story, 1st apartment from east at south

    Oct 24, 2017 · Apt 1B

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak over ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from east at south

    Oct 24, 2017 · Apt 1B

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the bathroom located at apt 1d, 1st story, 1st apartment from west at north

    May 9, 2016 · Apt 1D

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak all walls in the bathroom located at apt 1d, 1st story, 1st apartment from west at north

    May 9, 2016 · Apt 1D

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 1d, 1st story, 1st apartment from west at north

    May 9, 2016 · Apt 1D

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1d, 1st story, 1st apartment from west at north

    May 9, 2016 · Apt 1D

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the kitchen located at apt 1d, 1st story, 1st apartment from west at north

    May 9, 2016 · Apt 1D

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak west wall in the kitchen located at apt 1d, 1st story, 1st apartment from west at north

    May 9, 2016 · Apt 1D

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the private hallway located at apt 1d, 1st story, 1st apartment from west at north

    May 9, 2016 · Apt 1D

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak east wall in the private hallway located at apt 1d, 1st story, 1st apartment from west at north

    May 9, 2016 · Apt 1D

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the bathroom located at apt 3a, 3rd story

    May 17, 2010 · Apt 3A

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 5b, 5th story, 1st apartment from west at north

    Nov 17, 2007 · Apt 5B

    Open — Nov sent out
  • BHazardous

    Replace with new the broken or defective masonite panel at bath tub in the bathroom located at apt 5b, 5th story, 1st apartment from west at north

    Nov 17, 2007 · Apt 5B

    Open — Nov sent out
  • BHazardous

    Properly secure the loose wash basin in the bathroom located at apt 5b, 5th story, 1st apartment from west at north

    Nov 17, 2007 · Apt 5B

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective connection waste line at ceiling in the bathroom located at apt 5b, 5th story, 1st apartment from west at north

    Nov 17, 2007 · Apt 5B

    Open — Nov sent out

DOB building violations

31 DOB violations, newest first.

  • Construction other optional

    Failure to maintain building in a code compliant manner. throughout the entire facade there were multiple cracks in brick work spalling brick work at various levels of facade missing/spalling mortar joints remedy: repair and replace

    Jun 2, 2025

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner. observed at all exps deteriorating lintels spalling mortar joints, step cracks damaged spalling/spalled brick at various levels of the facade

    Jun 2, 2025

    Dob violation - active
  • Construction other optional

    Failure to maintain building in code compliant manner. note: observed multiple cracked/broken windows in various locations of the facade remedy: repair and replace

    Jun 2, 2025

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)

    Jun 23, 2024

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2021

    Aug 21, 2022

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst

    Sep 6, 2019

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Aug 19, 2019

    Dob violation - active
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Feb 8, 2018

    Dob violation - active
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Feb 17, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Nycha elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Jun 1, 2016

    Dob violation - dismissed
  • Nycha elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Jun 1, 2016

    Dob violation - dismissed
  • Nycha elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Jun 1, 2016

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7c technical report by 02/21/2013

    Dec 31, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7c technical report by 02/21/2013

    Dec 31, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Aug 2, 2013

    Dob violation - active
  • Facade facade optional

    Cycle 7 unsafe report filed

    Aug 2, 2013

    Dob violation - dismissed
  • Facade facade optional

    Unsafe local law 11/98 report filed

    Dec 26, 2012

    Dob violation - active
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Dec 7, 2005

    Dob violation - dismissed
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Aug 8, 2002

    Dob violation - dismissed
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Aug 8, 2002

    Dob violation - dismissed
  • Elevator elevatoroptional

    1

    Apr 7, 1992

    Dob violation - dismissed
  • Elevator elevatoroptional

    1

    Apr 7, 1992

    Dob violation - dismissed
  • Elevator elevatoroptional

    1

    Jun 29, 1990

    Dob violation - dismissed

ECB violations

12 ECB violations, newest first.

  • Class - 2

    Failure to maintain building exterior walls facade & appurtenances.observed vertical cracks on exp #1(south elevation) & exp #2(west elevation) in multiple locations near roof level.remedy:maintain building ext

    Dec 20, 2022 · Penalty $1,250

    Active
  • Class - 1

    Failure to take required measures to secure & protect public safety from documented unsafe facade building was deemed unsafe by pe/ra.noted:at time of inspection observed at exp #1 #2 #3 #4 crack in brickwork s

    Jun 17, 2022 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to provide adequate safety measures where required to secure public safety.noted:at time of inspection observed at exp #1 #2 #3 #4 cracks in brick at several floors damaged spalling sills at several flo

    Jun 17, 2022 · Penalty $10,000

    Resolve
  • Class - 2

    Fail to file an acceptable sixth round technical report in compliance with code provisions. periodic inspection of exterior walls & suppurtenances as required by article 28-302 and the dept of bldgs rules & reg

    Aug 19, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Jan 7, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Apr 24, 2009

    Resolve
  • Non-hazardous

    Failure to submit a 5th round technical report in compliance w/code provision:periodic inspection of exterior walls & appurtenances as required by local law 11 of 1998 & the dept of bldg rules & regulations.

    Jan 25, 2008

    Resolve
  • Non-hazardous

    Failure to submit a 5th round technical report in compliance w/ code provisions: periodic insp of exterior walls & appurtenances as requiredby local law 11 of 1998 & the dob rules & regulations. the 5th round

    Aug 25, 2006

    Resolve
  • Non-hazardous

    Failure to submit a fifth round technical report in compliance with code provisions:periodic insp of exterior walls & appurtenances as required by local law 11/98 & dob rules & regulations.remedy:file report

    Jun 2, 2006

    Resolve
  • Non-hazardous

    Failure to submit a fifth round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenancesas required by local law 11 of 1998 & the dept of bldgs rules & regul-

    Dec 9, 2005

    Resolve
  • Non-hazardous

    42l10 84## 55y07 19l01 63m15 84/# fire service doesn't work 19/l 4th and 5th floor door checks has to be adjusted.

    Jul 29, 2003

    Resolve
  • Hazardous

    Failure to maintain exterior of building facade issues i east elevator vertical cracks buildings in facades open mortar joints and push off is shelf angles ii west east and south elevator broken and missing w

    May 7, 2003 · Penalty $2,500

    Resolve