969 East 94 Street
Brooklyn, NY 11236BBL 3-08144-0114Map
Owner of record: Millie White As Trustee Of The
969 East 94 Street is a two-family home built in 1960 in Brooklyn, 11236. It has 2 residential units across 2 floors. The owner of record is Millie White As Trustee Of The. HPD has recorded 73 housing violations here, most recently on April 22, 2026. 19 of the 50 most recent violations are still open.
- HPD violations
- 73
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 121
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 73
- BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from west at north
Apr 22, 2026 · Apt 2NDFLO
Open — First no access to re- inspect violation - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from west at north
Apr 22, 2026 · Apt 2NDFLO
Open — First no access to re- inspect violation - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from west at north
Apr 22, 2026 · Apt 2NDFLO
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective wood floor in the 5th room from east located at apt 2ndflo, 2nd story, 1st apartment from west at north
Apr 22, 2026 · Apt 2NDFLO
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 5th room from north, the kitchen , the 4th room from north located at apt fl2, 2nd story, 1st apartment from west at north
Jan 10, 2026 · Apt FL2
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair or replace the broken or defective electrical outlet at north wall in the 6th room from north located at apt fl2, 2nd story, 1st apartment from west at north
Jan 10, 2026 · Apt FL2
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair with similar material the broken or defective wood saddle at south wall in the 5th room from north located at apt fl2, 2nd story, 1st apartment from west at north
Jan 10, 2026 · Apt FL2
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective ceramic wall saddles in the bathroom located at apt fl2, 2nd story, 1st apartment from west at north
Jan 10, 2026 · Apt FL2
Open — First no access to re- inspect violation - BHazardous
Replace the broken or defective water closet in the bathroom located at apt fl2, 2nd story, 1st apartment from west at north
Jan 10, 2026 · Apt FL2
Open — First no access to re- inspect violation - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt fl2, 2nd story, 1st apartment from west at north
Jan 10, 2026 · Apt FL2
Open — First no access to re- inspect violation
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective radiator valve at north wall in the 6th room from north located at apt fl2, 2nd story, 1st apartment from west at north
Jan 10, 2026 · Apt FL2
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt fl2, 2nd story, 1st apartment from west at north
Jan 10, 2026 · Apt FL2
Open — First no access to re- inspect violation - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt fl2, 2nd story, 1st apartment from west at north
Jan 10, 2026 · Apt FL2
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective ceramic tiles at floor in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Sep 27, 2023 · Apt 2NDFLO
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective electric outlet at north wall in the 5th room from east located at apt 2ndflo, 2nd story, 1st apartment from north at east
Sep 27, 2023 · Apt 2NDFLO
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair with similar material the broken or defective first and second window sill at north wall in the 5th room from east located at apt 2ndflo, 2nd story, 1st apartment from north at east
Sep 27, 2023 · Apt 2NDFLO
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective key operated lock at door at front entrance
Aug 7, 2023
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective building entance door mortise lock , 1st story
Jul 29, 2023
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical outlet at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Jul 29, 2023 · Apt 2
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jul 29, 2023 · Apt 2
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jul 29, 2023 · Apt 2
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in at bathtub waste pipe line in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Jul 29, 2023 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective window frame wood at 1st and 2nd window at north in the 5th room from east located at apt 2, 2nd story, 1st apartment from north at east
Jul 29, 2023 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective mixing valve at bathtub faucet in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Jul 6, 2023 · Apt 2
Closed — Violation closed - BHazardous
Properly secure the loose wood window frame sill at north in the 4th room from east located at apt 2, 2nd story, 1st apartment from south at west
Jul 6, 2023 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical outlet at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Jul 6, 2023 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the south wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from south at west
Jul 6, 2023 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective mixing valve at sink faucet in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Jul 6, 2023 · Apt 2
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Jul 6, 2023 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective building entrance mortise lock , 1st story
Jul 6, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tile at north wall in the bathroom located at apt 2floor, 2nd story, 1st apartment from west at north
Jun 2, 2023 · Apt 2FLOOR
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2floor, 2nd story, 1st apartment from west at north
Jun 2, 2023 · Apt 2FLOOR
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 5th room from east, the bathroom located at apt 2floor, 2nd story, 1st apartment from west at north
Jun 2, 2023 · Apt 2FLOOR
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2ndfl, 2nd story, 1st apartment from south at west
Apr 3, 2023 · Apt 2NDFL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the kitchen located at apt 2ndfl, 2nd story, 1st apartment from south at west
Apr 3, 2023 · Apt 2NDFL
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective 1st wood door from west at north in the 5th room from north located at apt 2ndfl, 2nd story, 1st apartment from south at west
Apr 3, 2023 · Apt 2NDFL
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall, west wall in the kitchen located at apt 2ndfl, 2nd story, 1st apartment from south at west
Apr 3, 2023 · Apt 2NDFL
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 5th room from north located at apt 2ndfl, 2nd story, 1st apartment from south at west
Apr 3, 2023 · Apt 2NDFL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling at public hall, 2nd story
Mar 28, 2023
Closed — Violation closed - ANon-hazardous
Properly secure the loose sink in the bathroom located at apt 2floor, 2nd story, 1st apartment from north at east
Mar 1, 2023 · Apt 2FLOOR
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl tile at floor in the kitchen located at apt 2floor, 2nd story, 1st apartment from north at east
Mar 1, 2023 · Apt 2FLOOR
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets washbasin in the bathroom located at apt 2floor, 2nd story, 1st apartment from north at east
Mar 1, 2023 · Apt 2FLOOR
Closed — Violation closed - BHazardous
Replace with new the broken or defective glass pane upper sash in the 2nd room from east located at apt 2ndflo, 2nd story, 1st apartment from south at west
Mar 1, 2023 · Apt 2NDFLO
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective bell at east to apartment 2 , 1st story
Mar 1, 2023
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balance upper sash west wall in the bathroom located at apt 2floor, 2nd story, 1st apartment from north at east
Mar 1, 2023 · Apt 2FLOOR
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures to outlet at west wall in the 1st room from east located at apt 2floor, 2nd story, 1st apartment from north at east
Mar 1, 2023 · Apt 2FLOOR
Open — First no access to re- inspect violation - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 24, 2023
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at north wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from west at north
Feb 18, 2023 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective counter balance, guilotine effect, at lower sash at west 1 window in the 5th room from east located at apt 2, 2nd story, 1st apartment from west at north
Feb 18, 2023 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation radiator at east in the 5th room from east located at apt 2, 2nd story, 1st apartment from west at north
Feb 18, 2023 · Apt 2
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Water leak
Slow leak
Jul 30, 2026 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Jul 30, 2026 · Apt 2NDFLO
Close - Safety
Window guard broken/missing
Jul 30, 2026 · Apt 2NDFLO
Close - Paint/plaster
Wall
Jul 30, 2026 · Apt 2NDFLO
Close - Plumbing
Radiator
Jul 30, 2026 · Apt 2NDFLO
Close - Plumbing
Basin/sink
Jul 30, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Jul 30, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Jul 30, 2026 · Apt 2NDFLO
Close - Door/window
Window frame
Jul 30, 2026 · Apt 2NDFLO
Close - Paint/plaster
Wall
Jul 30, 2026 · Apt 2NDFLO
Close
Show 40 more ↓
- Door/window
Window frame
Jul 30, 2026 · Apt 2NDFLO
Close - Flooring/stairs
Floor
May 26, 2026 · Apt SECOND
Close - Door/window
Window frame
May 26, 2026 · Apt SECOND
Close - Paint/plaster
Wall
May 26, 2026 · Apt SECOND
Close - Plumbing
Toilet
May 26, 2026 · Apt SECOND
Close - Flooring/stairs
Floor
May 26, 2026 · Apt SECOND
Close - Door/window
Window frame
May 26, 2026 · Apt SECOND
Close - Plumbing
Radiator
May 26, 2026 · Apt SECOND
Close - Unsanitary condition
Pests
May 26, 2026 · Apt SECOND
Close - Flooring/stairs
Floor
May 26, 2026 · Apt SECOND
Close - Unsanitary condition
Pests
May 26, 2026 · Apt SECOND
Close - Plumbing
Toilet
May 26, 2026 · Apt SECOND
Close - Plumbing
Basin/sink
May 26, 2026 · Apt SECOND
Close - Plumbing
Bathtub/shower
Jan 8, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Jan 8, 2026 · Apt 2NDFLO
Close - Plumbing
Radiator
Jan 8, 2026 · Apt 2NDFLO
Close - Door/window
Window frame
Jan 8, 2026 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Jan 8, 2026 · Apt FL2
Close - Plumbing
Radiator
Jan 8, 2026 · Apt FL2
Close - Plumbing
Basin/sink
Jan 8, 2026 · Apt FL2
Close - Paint/plaster
Wall
Jan 8, 2026 · Apt FL2
Close - Plumbing
Toilet
Jan 8, 2026 · Apt FL2
Close - Plumbing
Toilet
Jan 8, 2026 · Apt FL2
Close - Electric
Outlet/switch
Jan 8, 2026 · Apt FL2
Close - Flooring/stairs
Floor
Jan 8, 2026 · Apt FL2
Close - Plumbing
Bathtub/shower
Jan 8, 2026 · Apt FL2
Close - Paint/plaster
Wall
Jan 8, 2026 · Apt 2NDFLO
Close - Plumbing
Basin/sink
Jan 8, 2026 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Jan 8, 2026 · Apt 2NDFLO
Close - Outside building
Porch/balcony
Jan 8, 2026 · Apt 2NDFLO
Close - Electric
Outlet/switch
Sep 25, 2023 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Sep 25, 2023 · Apt 2NDFLO
Close - Paint/plaster
Wall
Sep 25, 2023 · Apt 2NDFLO
Close - Door/window
Window frame
Sep 25, 2023 · Apt 2NDFLO
Close - Paint/plaster
Wall
Sep 25, 2023 · Apt 2NDFLO
Close - Electric
Outlet/switch
Sep 18, 2023 · Apt 2NDFLO
Close - Paint/plaster
Wall
Sep 18, 2023 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Sep 18, 2023 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Sep 18, 2023 · Apt 2NDFLO
Close - Door/window
Window frame
Sep 18, 2023 · Apt 2NDFLO
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1960
- Floors
- 2
- Residential units
- 2
- Building area
- 2,160 ft²
- Lot area
- 2,783 ft²
- Zoning
- R4A
- Community board
- 318
- Council district
- 42
- Block / lot
- 8144 / 114
- Assessed value
- $64,740
- Landmark / historic district
- No
HPD registration #823707, last renewed Aug 23, 2025.
Questions about 969 East 94 Street
Who owns 969 East 94 Street?
The owner of record in NYC Department of City Planning PLUTO data is Millie White As Trustee Of The.
Does 969 East 94 Street have violations?
Yes. NYC HPD has recorded 73 housing violations at this property.
Is 969 East 94 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 969 East 94 Street built?
City records list 1960 as the year it was built.
How many apartments are in 969 East 94 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.