Violations at 1484 East 87 Street
Brooklyn, NY 11236 · BBL 3-08083-0042 · Back to the property
HPD housing violations
25 HPD violations, newest first.
- BHazardous
Replace the broken or defective waste line at wash basin in the bathroom located at apt 2ndfl, 2nd story
Oct 19, 2016 · Apt 2NDFL
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Sep 20, 2016
Open — Info nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2ndfl, 2nd story
Sep 16, 2016 · Apt 2NDFL
Open — Nov sent out - CImmediately hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 2ndfl, 2nd story
Sep 16, 2016 · Apt 2NDFL
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 2ndfl, 2nd story
Sep 16, 2016 · Apt 2NDFL
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling approx 6 sq. ft. in the bathroom located at apt 2ndfl, 2nd story
Sep 16, 2016 · Apt 2NDFL
Open — Nov sent out - BHazardous
Properly repair the broken or defective bell buzzer system in the entire apartment located at apt 2ndfl, 2nd story
Sep 16, 2016 · Apt 2NDFL
Open — Nov sent out - BHazardous
Replace with new the broken or defective rubber gasket around refrigerator door in the kitchen located at apt 2ndfl, 2nd story
Sep 16, 2016 · Apt 2NDFL
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures at sink in the kitchen located at apt 2ndfl, 2nd story
Sep 16, 2016 · Apt 2NDFL
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 2ndfl, 2nd story
Sep 16, 2016 · Apt 2NDFL
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at shower body in bathtub in the bathroom located at apt 2ndfl, 2nd story
Sep 16, 2016 · Apt 2NDFL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls throughout in the entire apartment located at apt 2ndfl, 2nd story
Sep 16, 2016 · Apt 2NDFL
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2flr, 2nd story, apartment at west
Aug 29, 2016 · Apt 2FLR
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ,, in the bathroom located at apt 2flr, 2nd story, apartment at west
Aug 29, 2016 · Apt 2FLR
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling and walls in the bathroom located at apt 2flr, 2nd story, apartment at west
Aug 29, 2016 · Apt 2FLR
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story
Aug 6, 2016 · Apt 2FL
Open — Nov sent out - BHazardous
Replace the broken or defective faucet at sink in the kitchen located at apt 2fl, 2nd story
Aug 6, 2016 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 2fl, 2nd story
Aug 6, 2016 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2fl, 2nd story
Aug 6, 2016 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective bell system in the entire apartment located at apt 2fl, 2nd story
Aug 6, 2016 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets sink in the kitchen located at apt 2fl, 2nd story
Aug 1, 2015 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Repair the leaky and/or defective faucets wash basin in the bathroom located at apt 2fl, 2nd story, 1st apartment from south at west
Aug 1, 2015 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 2fl, 2nd story, 1st apartment from south at west
Aug 1, 2015 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 2fl, 2nd story, 1st apartment from west at north
Jun 28, 2015 · Apt 2FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2, 2nd story
Mar 13, 2013 · Apt 2
Open — Nov sent out
DOB building violations
No DOB violations on record
ECB violations
2 ECB violations, newest first.
- Class - 2
Permitted obstructions in required yards noted:alit ii appl#301415485 to erect greenhouse.premises is a corner lot of which has no rear yardonly side yards & front of which greenhouse lot front yard is contrary
Jun 2, 2010
Resolve - Class - 2
(misc)28.104.7.1construction documents shall be complete &/of sufficient clarify for alt ii appl#301415485 insufficiencies noted:plans fail to provide plot plan or directions of lot or location of greenhouse
Jun 2, 2010 · Penalty $400
Resolve