Violations at 1445 East 84 Street
Brooklyn, NY 11236 · BBL 3-08081-0061 · Back to the property
HPD housing violations
12 HPD violations, newest first.
- BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at stoop, 1st story
Aug 3, 2026
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor at public hall, 1st story
Oct 1, 2024
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 1, 1st story, 1st apartment from north at east
Oct 1, 2024 · Apt 1
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north located at apt 1, 1st story
Dec 14, 2020 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective located at apt 1, 1st story, 1st apartment from north at east
Aug 13, 2018 · Apt 1
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... approx . 5 sq ft at the ceiling in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Aug 13, 2018 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the west wall in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Aug 13, 2018 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 2nd room from north at east located at apt 1, 1st story, 1st apartment from north at east
Aug 13, 2018 · Apt 1
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 2nd room from north at east located at apt 1, 1st story, 1st apartment from north at east
Aug 13, 2018 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective concrete tread, 1st tread from bottom at stoop, 1st story
Aug 29, 2016
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... all walls in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Aug 29, 2016 · Apt 1
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 2nd room from north at east located at apt 1, 1st story, 1st apartment from north at east
Aug 29, 2016 · Apt 1
Open — Not complied with
DOB building violations
2 DOB violations, newest first.
- Construction other optional
Work without a permit. work noted erected partitions for three piece b athroom and full kitchen and two bedrooms in basement remedy: obtain permits if feasible or restore to prior legal condition
Sep 28, 2001
Vw-violation work without permit - active - Construction other optional
Work without a permit work noted: erected partitions for three piece bathroom and full kitchen and two bedroom in basement remedy: obtain permits if feasible or restore to prior legal condition
Sep 28, 2001
Vw-violation work without permit - active
ECB violations
1 ECB violations, newest first.
- Non-hazardous
Work without a permit work noted erected partitions for three piece bathroom and full kitchen and two bedrooms in basement. remedy: obtain permits if feasible or restore to prior legal condition.
Sep 28, 2001 · Penalty $250
Active