roofy

Violations at 1474 East 85 Street

Brooklyn, NY 11236 · BBL 3-08081-0040 · Back to the property

HPD housing violations

23 HPD violations, newest first.

  • CImmediately hazardous

    Abate the nuisance consisting of hot water exceeding the allowed maximum temperature of 130 degrees f, measured temperature: 137 degrees f in the hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Mar 17, 2022 · Apt 1

    Open — Nov sent out
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Mar 17, 2022 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the 3rd room from east located at apt 1, 1st story, 1st apartment from north at east

    Mar 13, 2022 · Apt 1

    Open — Nov sent out
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the 1st room from east located at apt 1, 1st story, 1st apartment from north at east

    Mar 13, 2022 · Apt 1

    Closed — Violation closed
  • CImmediately hazardous

    Remove the illegal fastening consisting of double cylinder lock installed at metal storm door at building front entrance

    Feb 26, 2022

    Open — Nov sent out
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from south at west

    Feb 20, 2022 · Apt 1

    Closed — Violation closed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 16, 2022

    Open — Info nov sent out
  • CImmediately hazardous

    M/d law abate the nuisance consisting of hot water exceeding the allowed maximum temperature of 130 degrees f. in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Feb 12, 2022 · Apt 1

    Open — Nov sent out
  • CImmediately hazardous

    Remove all obstructions and repair all defects in at waste line under sink in the kitchen located at apt 1, 1st story, 1st apartment from south at west

    Sep 18, 2019 · Apt 1

    Open — Nov sent out
  • CImmediately hazardous

    Remove all obstructions from water closet over flow raw sewer in the bathroom located at apt 1, 1st story, 1st apartment from south at west

    Sep 18, 2019 · Apt 1

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Aug 12, 2019

    Open — Info nov sent out
  • CImmediately hazardous

    Provide temporary seal-up for all accessible openings in the entire apartment located at cellar apt bsmt

    Aug 6, 2019 · Apt BSMT

    Closed — Violation closed
  • IInformation / order

    Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts at basement vacate # 149160

    Jul 30, 2019

    Open — Info nov sent out
  • BHazardous

    Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections sink, watercloset, washbasin and showerstall at illegal class ''a'' apartment created at basement, section ''front''

    Jul 17, 2019

    Open — Nov sent out
  • BHazardous

    Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas range, at illegal class ''a'' apartment created at basement, section ''front''

    Jul 17, 2019

    Open — Nov sent out
  • BHazardous

    Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections sink, watercloset, shower stall, washbasin at illegal class '' a'' apartment created at basement, section ''rear''

    Jul 17, 2019

    Open — Nov sent out
  • BHazardous

    Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas range at illegal class ''a'' apartment created at basement, section ''rear''

    Jul 17, 2019

    Open — Nov sent out
  • BHazardous

    § 9, 170, 171, 300, 301, 302 m.d.law-file plans and application and obtain a certificate of occupancy to legalize the conversion from a private dwelling to multiple dwelling use if lawfully feasible or restore to lawful occupancy

    Jul 17, 2019

    Open — Nov sent out
  • CImmediately hazardous

    Remove the illegal double cylinder key operated locking device at door at building front entrance at basement

    Jul 17, 2019

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of 2 car garage door completely removed and brick wall with entrance door erected at building front at basement story

    Jul 17, 2019

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective paving front building

    Feb 13, 2018

    Open — Nov sent out
  • BHazardous

    Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections watercloset,washbasin, and shower stall . located at bsmt-apt groun

    Apr 16, 2013 · Apt GROUN

    Open — Nov sent out
  • BHazardous

    Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas stove . located at bsmt-apt groun

    Apr 16, 2013 · Apt GROUN

    Open — Nov sent out

DOB building violations

1 DOB violations, newest first.

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 5, 2020

    Dob violation - active

ECB violations

6 ECB violations, newest first.

  • Class - 1

    Occupancy contrary to that allowed by cofo and department of buildingsrecords-illegal class(a)apartment created at basement front with room for sleeping and living-unlawful gas range and sink present.also a ful

    Jul 17, 2019 · Penalty $12,500

    Active
  • Class - 2

    Occupancy contrary to that allowed by cofo and department of buildingsrecords.partitions erected creating two close a illegal apartment at basement front and rear unlawful gas stove present with sink.also prese

    Jul 17, 2019 · Penalty $6,250

    Active
  • Class - 2

    Occupancy contrary to that allowed by the certificate of occupancy or building dept records. note: observe at the time of inspection the basement/garage of a legal 2 family bldg was converted to 2 class "a"

    Jan 17, 2018 · Penalty $1,200

    Active
  • Class - 2

    Work w/o a permit. note observed at the time of inspection the bsementgarage of a legal 2family bldg was converted to 2 class "a" apartments with 3pc bathrooms and kitchen with gas stoves. there no records of

    Jan 17, 2018 · Penalty $800

    Active
  • Class - 2

    Work w/o a permit: work noted: garage door removed, brick wall installed w/window & entry door & exterior light. remedy: obtain permit or restore to prior legal condition.

    Jun 8, 2013 · Penalty $800

    Active
  • Class - 2

    Occupancy contrary to that allowed by c/o and dob records. class 'a' apt created at basement partitions erected creating rooms throughout for living full kitchen w/gas range and kitchen sink also full 3 pc

    Apr 16, 2013 · Penalty $1,200

    Active