Violations at 1342 East 88 Street
Brooklyn, NY 11236 · BBL 3-08078-0059 · Back to the property
HPD housing violations
16 HPD violations, newest first.
- BHazardous
Replace with new the missing door knob in the 1st room from east located at apt 1, 1st story
Dec 2, 2008 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the private hallway located at apt 1, 1st story
Dec 2, 2008 · Apt 1
Open — Nov sent out - ANon-hazardous
Refit door in the 1st room from east located at apt 1, 1st story
Dec 2, 2008 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective grouting around bathtub in the bathroom located at apt 1, 1st story
Dec 2, 2008 · Apt 1
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in waste line bathtub in the bathroom located at apt 1, 1st story
Dec 2, 2008 · Apt 1
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 1, 1st story
Dec 2, 2008 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of evidence of concealed water leak ceiling in the bathroom located at apt 1, 1st story
Dec 2, 2008 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the bathroom located at apt 1, 1st story
Dec 2, 2008 · Apt 1
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1fl, 1st story
Nov 24, 2008 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the 2nd bathroom from east located at apt 1fl, 1st story
Nov 24, 2008 · Apt 1FL
Open — Nov sent out - BHazardous
Replace the broken or defective washbasin in the 2nd bathroom from east located at apt 1fl, 1st story
Nov 24, 2008 · Apt 1FL
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in drain pipe to bathtub in the 1st bathroom from east located at apt 1fl, 1st story
Nov 24, 2008 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the 1st bathroom from east located at apt 1fl, 1st story
Nov 24, 2008 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling, west and east walls in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east
Nov 24, 2008 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color north wall in the private hallway located at apt 1fl, 1st story
Nov 24, 2008 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Refit door in the 3rd room from east located at apt 1fl, 1st story
Nov 24, 2008 · Apt 1FL
Open — Nov sent out
DOB building violations
No DOB violations on record
ECB violations
No ECB violations on record