Violations at 947 East 80 Street
Brooklyn, NY 11236 · BBL 3-08017-0022 · Back to the property
HPD housing violations
16 HPD violations, newest first.
- BHazardous
Properly repair or replace the broken or defective electrical outlet at north wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Dec 6, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Dec 6, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the north wall in the 1st room from east located at apt 2, 2nd story, 1st apartment from east at south
Dec 6, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the north wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Dec 6, 2025 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Dec 6, 2025 · Apt 2
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in wasteline at wash basin in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Dec 6, 2025 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Dec 6, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ..(lower level) in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Dec 6, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and the ceilings in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Remove all obstructions and repair all defects in the wasteline at the washbasin in the 1st bathroom located at apt 2, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective 3rd and 8th wood tread from the bottom at the stairs leading to the 2nd floor (duplex apt) located at apt 2, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Remove all obstructions and repair all defects in the wasteline at the washbasin in the 2nd bathroom located at apt 2, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2
Open — First no access to re- inspect violation - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the 2nd bathroom located at apt 2, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt unit2, 2nd story, 1st apartment from north at east
Jan 22, 2024 · Apt UNIT2
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt unit2, 2nd story, 1st apartment from north at east
Jan 22, 2024 · Apt UNIT2
Open — Nov certified late
DOB building violations
No DOB violations on record
ECB violations
No ECB violations on record