Violations at 983 East 77 Street
Brooklyn, NY 11236 · BBL 3-08014-0058 · Back to the property
HPD housing violations
12 HPD violations, newest first.
- IInformation / order
The premises have been vacated by an order of this department and cannot be reoccupied except for caretaker until a new certificate of occupancy has been obtained. vacate #: 259002, posted at 1st story bulding entrance door, 1st door from west at north; 2n story building entrance door, 1st door from east at south. at cellar
Nov 20, 2024
Open — Info nov sent out - ANon-hazardous
§ 9, 170, 171, 300, 301, 302 m.d.law-file plans and application and obtain a certificate of occupancy to legalize the conversion from a private dwelling to multiple dwelling use if lawfully feasible or restore to lawful occupancy
Nov 10, 2024
Open — Nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections water closet, wash basin, bath-tub, and kitchen sink at cellar
Nov 10, 2024
Open — Nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas stove at cellar
Nov 10, 2024
Open — Nov sent out - BHazardous
§ 9, 170, 171, 300, 301, 302 m.d.law-file plans and application and obtain a certificate of occupancy to legalize the conversion from a private dwelling to multiple dwelling use if lawfully feasible or restore to lawful occupancy at basement
Nov 10, 2024
Closed — Violation closed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections at water closet, wash basin, bathtub, and kitchen sink at basement
Nov 10, 2024
Closed — Violation closed - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas stove at basement
Nov 10, 2024
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 2nd room from north at west located at apt baseme, 1st apartment from west at north
Sep 4, 2023 · Apt BASEME
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 2nd room from north at east located at apt baseme, 1st apartment from west at north
Sep 4, 2023 · Apt BASEME
Open — Nov sent out - BHazardous
Provide adequate lighting for at ceiling in the private hallway located at apt baseme, 1st apartment from west at north
Sep 4, 2023 · Apt BASEME
Open — Nov sent out - BHazardous
Abate the infestation consisting of vermin flies in the entire apartment located at apt baseme, 1st apartment from west at north
Sep 4, 2023 · Apt BASEME
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt baseme, 1st apartment from west at north
Sep 4, 2023 · Apt BASEME
Open — Nov sent out
DOB building violations
1 DOB violations, newest first.
- Construction other optional
Work without a permit noted:garage door was removed and a masonary wall was erected with an entry door and a windown was installed inside partitions were placed separating rooms and a 3pce,bathroom was built without a permit remedy: obtain proper permit or reeturn to legal condition
Aug 4, 2001
Vw*-violation - work w/o permit dismissed
ECB violations
3 ECB violations, newest first.
- Class - 1
Occupancy contrary to that allowed by c of o and/or department of building records. partitions erected creating an illegal class "a" apartment at cellar. unlawful gas stove and kitchen sink present. also, full
Nov 10, 2024 · Penalty $2,500
Active - Class - 1
Occupany contrary to that allowed by c of o and/or department of builds records. illegal class "a" apartment at basement. rooms used for living. unlawful gas range, also present a bathroom. complete water close
Nov 10, 2024 · Penalty $12,500
Active - Non-hazardous
Work without permit noted garage door was removed and a masonary wall was removed and a window was installed was installed inside partition were placed separating rooms and a 3 piece bathroom was built without
Aug 4, 2001
Resolve