roofy

Violations at 901 East 76 Street

Brooklyn, NY 11236 · BBL 3-08013-7501 · Back to the property

HPD housing violations

The newest 50 of 647 HPD violations. The city keeps the complete history.

  • BHazardous

    Properly repair or replace the broken or defective lower window sash spring balance, 1st window at south from east in the 1st room from north located at apt 1f lower level, 1st story, 2nd apartment from east at south

    Sep 30, 2026 · Apt 1F

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1f, 1st story, 2nd apartment from east at south

    Sep 30, 2026 · Apt 1F

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1f, 1st story, 2nd apartment from east at south

    Sep 30, 2026 · Apt 1F

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt 1f, 1st story, 2nd apartment from east at south

    Sep 30, 2026 · Apt 1F

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east located at apt 1f, 1st story, 2nd apartment from east at south

    Sep 30, 2026 · Apt 1F

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 1f, 1st story, 2nd apartment from east at south

    Sep 30, 2026 · Apt 1F

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft observed at ceiling at closet in the 1st room from east located at apt 1f, 1st story, 2nd apartment from east at south

    Sep 30, 2026 · Apt 1F

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 1f, 1st story, 2nd apartment from east at south

    Sep 30, 2026 · Apt 1F

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    Repair the broken or defective rain leader at west at building front

    Sep 13, 2026

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west

    Sep 13, 2026 · Apt 2F

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    May 31, 2026 · Apt 2R

    Open — Notice of issuance sent to tenant
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    May 31, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    May 31, 2026 · Apt 2R

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 3rd room from east at south located at apt 2r, 2nd story, 1st apartment from south at west

    May 31, 2026 · Apt 2R

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    May 31, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Remove all obstructions and repair all defects in waste line under sink in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    May 31, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective metal door frame in the entrance located at apt 2r, 2nd story, 1st apartment from south at west

    May 31, 2026 · Apt 2R

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2r, 2nd story, 1st apartment from south at west

    May 31, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective vinyl tiles at floor in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west

    May 31, 2026 · Apt 2R

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair or replace the broken or defective counter balance at lower window sash in the 3rd room from east at south located at apt 2r, 2nd story, 1st apartment from south at west

    May 31, 2026 · Apt 2R

    Open — Nov sent out
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    May 31, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    May 31, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    May 31, 2026 · Apt 2R

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story

    Apr 5, 2026

    Open — Nov sent out
  • BHazardous

    Remove all encumbrances consisting of sheet rocks at public hall, 1st story

    Mar 11, 2026

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 2f, 2nd story, 1st apartment from south at west

    Mar 11, 2026 · Apt 2F

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2f, 2nd story, 1st apartment from south at west

    Mar 11, 2026 · Apt 2F

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north

    Dec 27, 2025 · Apt 1F

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north

    Dec 27, 2025 · Apt 1F

    Open — Invalid certification
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north

    Dec 27, 2025 · Apt 1F

    Open — Invalid certification
  • BHazardous

    Properly repair or replace the broken or defective electrical air vent at south wall in the bathroom located at apt 1f, 1st story, 1st apartment from west at north

    Dec 27, 2025 · Apt 1F

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair or replace the broken or defective hydronic baseboard missing cover in the bathroom located at apt 1f, 1st story, 1st apartment from west at north

    Dec 27, 2025 · Apt 1F

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective wash basin cabinet in the bathroom located at apt 1f, 1st story, 1st apartment from west at north

    Dec 27, 2025 · Apt 1F

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective entrance door to building hinges at public hall, 1st story

    Dec 23, 2025

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair with similar material the broken or defective porcelain enamel at bathtub by method of reglazing in the bathroom located at apt 3r, 3rd story, 1st apartment from east at south

    Dec 23, 2025 · Apt 3R

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3r, 3rd story, 1st apartment from east at south

    Dec 23, 2025 · Apt 3R

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective caulking around bathtub perimeter in the bathroom located at apt 3r, 3rd story, 1st apartment from east at south

    Dec 23, 2025 · Apt 3R

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Dec 22, 2025 · Apt 2F

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Dec 22, 2025 · Apt 2F

    Open — Notice of issuance sent to tenant
  • BHazardous

    Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west

    Dec 22, 2025 · Apt 2F

    Open — Not complied with
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west

    Dec 22, 2025 · Apt 2F

    Open — Not complied with
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west

    Dec 22, 2025 · Apt 2F

    Open — Not complied with
  • CImmediately hazardous

    M/d law abate the nuisance consisting of hotwater exceeding the maximum allowable temerature of 130 degrees in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north

    Nov 4, 2025 · Apt 1F

    Closed — Violation closed

DOB building violations

8 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 18, 2012

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active

ECB violations

13 ECB violations, newest first.

  • Class - 1

    Atoi observed unpermitted general construction work in apartment #3f consisting of alteration of partition walls with framing being erected., obtain permit

    Mar 4, 2026

    Resolve
  • Class - 1

    Atoi observed failure to maintain in an area of active construction work, the contents of a kitchen and bathroom have been removed with uncapped gas, water and sanitary lines., repair and/replace

    Mar 4, 2026 · Penalty $2,500

    Active
  • Class - 2

    Failure to maintain building walls and appurtenances. at time of inspection observed a column at left side of property not maintained. column has a vertical crack on masonry with damaged and missing bricks. als

    Feb 14, 2025 · Penalty $6,250

    Active
  • Class - 2

    4a,6a,19b,24b,32a,36

    Aug 1, 2018 · Penalty $3,125

    Active
  • Class - 2

    4a,6a,19b,24b,32a/36,50. illegal hot and cold water connection on thehot water heater.

    Aug 1, 2018 · Penalty $3,125

    Active
  • Class - 2

    4a,6a,19b,24b,32a,36

    Aug 1, 2018 · Penalty $3,125

    Active
  • Class - 2

    4a,6a,19b,24b,32a,36

    Aug 1, 2018 · Penalty $3,125

    Active
  • Class - 2

    B254,4a,6a,19b,24b,32a/36,50 (50)hot water heater safety discharge pipe is missing

    Aug 1, 2018 · Penalty $625

    Active
  • Class - 2

    4a,6a,15,19b,24b,32a,34a/b,36,38,44c.

    Aug 1, 2018 · Penalty $3,125

    Active
  • Class - 2

    Crown boiler 37,500 but installed w/o dob permit.

    Aug 1, 2018 · Penalty $6,250

    Active
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #34930583n issued on 1/27/12,for work w/o permit-cellar partitions,plumbing & gas lines. remedy: comply w/the comm's order.

    Mar 16, 2012

    Resolve
  • Class - 1

    Work w/o permit note at cellar level full height partitions erected creating seperate rooms kitchen area w/ gas stove sink cabinets and refrigerator a three pc bathroom (sink, toilet, shower) remedy obtain perm

    Jan 27, 2012

    Resolve
  • Hazardous

    Occupancy contrary to that allowed by c of o and dept of bldgs records class "a" apt created at cellar partitions erected creating rooms fixtures present. rem: restore premises to legal occupancy.

    Apr 29, 2008 · Penalty $800

    Active