Violations at 1340 East 58 Street
Brooklyn, NY 11234 · BBL 3-07882-0048 · Back to the property
HPD housing violations
27 HPD violations, newest first.
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 16, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at north, the kitchen , the bathroom , the 1st room from east at south, the 1st room from east at north, the private hallway located at apt 2, 2nd story, 1st apartment from south at west
Dec 21, 2021 · Apt 2
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approx. 20 sq ft at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Dec 21, 2021 · Apt 2
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 3rd room from east at north located at apt 2, 2nd story, 1st apartment from south at west
Dec 21, 2021 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling, west wall in the 3rd room from east at north located at apt 2, 2nd story, 1st apartment from south at west
Dec 21, 2021 · Apt 2
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Dec 21, 2021 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from south at west
Dec 21, 2021 · Apt 2
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the private hallway located at apt 2, 2nd story, 1st apartment from south at west
Dec 21, 2021 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling, east wall in the private hallway located at apt 2, 2nd story, 1st apartment from south at west
Dec 21, 2021 · Apt 2
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Dec 21, 2021 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 2, 2nd story, 1st apartment from south at west
Dec 21, 2021 · Apt 2
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening key operated double cylinder lock installed at the building entrance gate , 1st story
Dec 21, 2021
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at all electrical light switches and wall outlets in the 3rd room from east at north located at apt 1floor, 1st story, apartment at west
May 30, 2020 · Apt 1FLOOR
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at all electrical light switchs and wall outlets in the kitchen located at apt 1floor, 1st story, apartment at west
May 30, 2020 · Apt 1FLOOR
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 1floor, 1st story, apartment at west
May 30, 2020 · Apt 1FLOOR
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of excessive extension cords throughout in the entire apartment located at apt 1floor, 1st story, apartment at west
May 30, 2020 · Apt 1FLOOR
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1floor, 1st story, apartment at west
May 30, 2020 · Apt 1FLOOR
Closed — Violation closed - BHazardous
Properly repair the broken or defective mechanical lock at east wall window in the 1st room from east located at apt 1floor, 1st story, apartment at west
May 30, 2020 · Apt 1FLOOR
Closed — Violation closed - BHazardous
Properly repair the broken or defective mechanicla lock at west wall window in the 3rd room from east at north located at apt 1floor, 1st story, apartment at west
May 30, 2020 · Apt 1FLOOR
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective door bell from building entrance to south wall in the private hallway located at apt 1floor, 1st story, apartment at west
May 30, 2020 · Apt 1FLOOR
Closed — Violation closed - BHazardous
Properly repair the broken or defective mechanical lock at north window in the bathroom located at apt 1floor, 1st story, apartment at west
May 30, 2020 · Apt 1FLOOR
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1floor, 1st story, apartment at west
May 30, 2020 · Apt 1FLOOR
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 1floor, 1st story, apartment at west
May 30, 2020 · Apt 1FLOOR
Closed — Violation closed - IInformation / order
The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for at cellar , vacate # 132327.
Jul 26, 2016
Closed — Violation closed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections ..at bathroom and kitchen located at cellar apt
Jul 12, 2016
Closed — Violation closed - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible at gas range located at cellar apt
Jul 12, 2016
Closed — Violation closed - BHazardous
Section 9, 170, 171, 300, 301, 302 m.d.law-file plans and application and obtain a certificate of occupancy to legalize the conversion from a private dwelling to multiple dwelling use if lawfully feasible or restore to lawful occupancy located at cellar apt
Jul 12, 2016
Closed — Violation dismissed
DOB building violations
No DOB violations on record
ECB violations
1 ECB violations, newest first.
- Class - 1
Occupancy contrary to that allowed by c of o and dept of bldgs records.partitions erected creating illegal use of rooms for living in cellar.unlawful cooking range and kitchen sink present also full bathroom co
Jul 12, 2016
Resolve