Violations at 1431 East 35 Street
Brooklyn, NY 11234 · BBL 3-07671-0023 · Back to the property
HPD housing violations
24 HPD violations, newest first.
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 16, 2022
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective mortise lock entrance door to building at public hall, 1st story
Dec 21, 2000
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the foyer located at apt 1r, 1st story, apartment at west
Dec 21, 2000 · Apt 1R
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective latch windows in the entire apartment located at apt 1r, 1st story, apartment at west
Dec 21, 2000 · Apt 1R
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling in the bathroom located at apt 1r, 1st story, apartment at west
Dec 21, 2000 · Apt 1R
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of evidence of water leak ceiling in the bathroom located at apt 1r, 1st story, apartment at west
Dec 21, 2000 · Apt 1R
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets hot water sink in the kitchen located at apt 1-r, 1st story, apartment at west
Dec 21, 2000 · Apt 1-R
Open — Nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections cellar east
Jul 15, 1994
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration accoustical ceiling diminishing height of bathroom ceiling 1 sty rear apt 1r
Aug 10, 1992
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of electrical wires exposed at bathroom ceiling 1 sty rear apt 1r
Aug 10, 1992
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor private hall 1 sty rear apt 1r
Aug 10, 1992
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets bathtub bathroom 1 sty rear apt 1r
Aug 10, 1992
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling over bathroom 1 sty rear apt 1r
Aug 10, 1992
Open — Nov sent out - BHazardous
Properly secure the loose electrical light fixture bathroom 1 sty apt 1r.
Jul 6, 1992
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective 1 sty apt 1r stern.
Jul 6, 1992
Open — Nov sent out - ANon-hazardous
Repair by closing so as to be gas tight all openings in the wastepipe washbasin bathroom 1 sty apt 1r er1.
Jul 6, 1992
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective faucets bathtub bathroom 1 sty apt 1r er1.
Jul 6, 1992
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling bathroom 1 sty apt 1r er1.
Jul 6, 1992
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of concealed water leak ceiling bathroom 1 sty apt 1r er1.
Jul 6, 1992
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors entrance 1 sty rear apt 1r.
Sep 6, 1991
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical light switches rear rooms and bathroom 1 sty rear apt 1r.
Sep 6, 1991
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration partition erected creating 2 rooms cellar rear.
Dec 28, 1989
Open — Nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections cellar thru out.
Dec 28, 1989
Open — Nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections cellar thru out.
Dec 9, 1988
Open — Nov sent out
DOB building violations
1 DOB violations, newest first.
- Construction other optional
C-construction other optional
Jan 17, 1989
Dob violation - active
ECB violations
No ECB violations on record