3003 Avenue L
Brooklyn, NY 11210BBL 3-07630-0009Map
Owner of record: 3007 Ave L, LLC
3003 Avenue L is a mixed residential and retail building built in 1927 in Brooklyn, 11210. It has 2 residential units across 2 floors. The owner of record is 3007 Ave L, LLC. HPD has recorded 20 housing violations here, most recently on September 16, 2005. 20 of the 20 most recent violations are still open.
- HPD violations
- 20
- DOB violations
- 22
- ECB violations
- 5
- HPD complaints
- 32
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 20
- BHazardous
Abate the nuisance consisting of - fumes from dry cleaning store emenating into 2 sty. south apt.
Sep 16, 2005
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets sink at kitchen, 2nd story, apartment
Sep 8, 2003 · Apt 2R
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling and west wall at public hall, 2nd story
Sep 8, 2003
Open — Nov sent out - BHazardous
Replace with new the missing balusters at rail at public hall, 2nd story
Sep 8, 2003
Open — Nov sent out - BHazardous
Replace with new the broken or defective door in the 1st room from north located at apt 2r, 2nd story, apartment at north
Sep 8, 2003 · Apt 2R
Open — Nov sent out - ANon-hazardous
Refit lower sash windows in the 2nd room from east at south located at apt 2r, 2nd story, apartment at north
Sep 8, 2003 · Apt 2R
Open — Nov sent out - BHazardous
Replace with new the broken or defective bell and return buzzer at entire apartment, 2nd story, apartment
Sep 8, 2003 · Apt 2R
Open — Nov sent out - ANon-hazardous
Refit upper and lower sash windows in the 1st room from north located at apt 2r, 2nd story, apartment at north
Sep 8, 2003 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair the broken or defective counterbalance, lower sash, north window in the 1st room from north located at apt 2r, 2nd story, apartment at north
May 13, 2003 · Apt 2R
Open — Nov sent out - ANon-hazardous
Refit south window in the 2nd room from north at west located at apt 2r, 2nd story, apartment at north
May 13, 2003 · Apt 2R
Open — Nov sent out
Show 10 more ↓
- BHazardous
Properly repair the broken or defective light fixture, ceiling, 1st story at public hall
May 13, 2003
Open — Nov sent out - BHazardous
Properly repair the broken or defective bell/buzzer system, from 2nd story apt to bldg front at front areaway
May 13, 2003
Open — Nov sent out - BHazardous
Properly repair the broken or defective lock, bldg entrance door at front areaway
May 13, 2003
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, apartment at east
Apr 17, 2003 · Apt 2R
Open — Nov sent out - ANon-hazardous
Discontinue use of interior room for living or provide an alcove opening of at least 32 1/2 sq.ft. to room having a window opening directly to street or yard , in the 2nd room from east located at apt 2r, 2nd story, apartment at east
Apr 17, 2003 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair the broken or defective - and or make operative lower sash at north window in the 1st room from north at west located at apt 2r, 2nd story, apartment at north
Mar 11, 2003 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair the broken or defective buzzer system from building street entrance to 2 nd story apt 2 r -- north , apartment
Mar 11, 2003
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the entire apartment located at apt 2r, 2nd story, apartment at north
Jan 3, 2003 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair the broken or defective metal frames upper and lower sash windows in the 1st room from north located at apt 2r, 2nd story, apartment at north
Jan 3, 2003 · Apt 2R
Open — Nov sent out - ANon-hazardous
Refit windows in the 2nd room from north located at apt 2r, 2nd story, apartment at north
Jan 3, 2003 · Apt 2R
Open — Nov sent out
DOB building violations · 22
- Construction other optional
Unpermited party wall removal at exp.#4. joists exposed,repair permits filed, swo adjusted. weekly reports requested, not received. remedy: comply w. code, submit weekly progress updates to adoulah@ and jrolon@ buildings.nyc.gov. 1st rpt to be submitted on 3/21/25
Mar 19, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Construction other optional
Failure to maintain bldg in a safe condition.feu obsrvd that the illegal constructn wrk took place@the 1stfl shard wall of 3003 and 3005.apprx 25ft of this shared wall was rmvd&replacd w/a steel beam ownr to immed rtain nyspe to eval the ent bldg,det the strct stbility& prepare/file rpair dwgs.bldg to be rpaird undr prmt strtng7/12/24
Jul 30, 2024
Dob violation - dismissed - Construction other optional
Structure rendered non-compliant. due to party wall compromised. owner to hire nyspe to submit report to [email protected] with in 5 days, addressing all conditions w/plans. photos, recommending time frame and repairs to be completed.
Jul 29, 2024
Dob violation - dismissed - Construction other optional
Observed unpermitted alteration consisting of removal of load bearing wall on exp# 4 for approx 25 feet remedy: retain nys pe to prepare drwgs & for f/t pe supervision to immed shore compromised sections on 1st floor & basement
Jul 29, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed
Show 12 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 5
- Class - 1
Work without a permit. observed wwop combining two buildings at rear store at exposure#2(3003 ave l to 3005 ave l) with new beam where the party wall was, and created opening to synagogue., obtain permit; obtai
Jul 29, 2024 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building. combining two buildings at rear store at exposure#2(3003 ave l to 3005 ave l) with new beam where the party wall was, and created opening to synagogue., repair and/replace; repair
Jul 29, 2024
Resolve - Class - 1
Supervision or use of rigging equipment w/o a riggers license, noted: no license rigger on site for suspended scaffold hanging at exposure #2. remedy: discontinue use
Mar 9, 2010 · Penalty $4,800
Active - Non-hazardous
Work without a permit (100% of work completed) noted: partition wall constructed of sheetrock through approximate center of living room to create a 2nd bedroom having windows and leaving a smaller living room
Mar 22, 2004 · Penalty $250
Active - Non-hazardous
Work without a permit. noted: at 2nd floor in apt 2r erected partition wall in room approx 19x12 (living room) to create (2) room approx 11x12 and 8x12 installed shop ceiling throughout apt. remedy: obtain perm
Sep 4, 2003 · Penalty $500
Active
Complaints
- Heating
Heat related
Apr 23, 2013 · Apt 2F
Close - Heating
Heat related
Apr 22, 2013 · Apt 2F
Close - Heating
Heat related
Apr 21, 2013 · Apt 2F
Close - Heating
Heat related
Apr 20, 2013 · Apt 2F
Close - Heating
Heat related
Dec 30, 2011 · Apt 2R
Close - Heating
Heat related
Jan 15, 2011 · Apt 2F
Close - Heating
Heat related
Dec 30, 2005 · Apt 2F
Close - Heating
Heat related
Dec 24, 2005 · Apt 2
Close - General
Windows
Mar 31, 2004 · Apt 2R
Close - General
Windows
Aug 27, 2003 · Apt 2R
Close
Show 22 more ↓
- Plumbing
Basin/sink
Aug 27, 2003 · Apt 2R
Close - Plumbing
Water-leaks
Aug 27, 2003 · Apt 2R
Close - Electric
Lighting
Aug 27, 2003 · Apt 2R
Close - Electric
Bell-buzzer/intercom
Aug 27, 2003 · Apt 2R
Close - Electric
Bell-buzzer/intercom
Aug 27, 2003 · Apt 2R
Close - Plumbing
Water-leaks
Aug 5, 2003 · Apt 2R
Close - General
Windows
Aug 5, 2003 · Apt 2R
Close - Electric
Lighting
Aug 5, 2003 · Apt 2R
Close - Electric
Bell-buzzer/intercom
Aug 5, 2003 · Apt 2R
Close - Heating
Heat related
May 25, 2003 · Apt 2R
Close - Heating
Heat related
Apr 17, 2003 · Apt 2R
Close - General
Windows
Apr 17, 2003 · Apt 2R
Close - General
Mailbox
Apr 17, 2003 · Apt 2R
Close - Electric
Bell-buzzer/intercom
Apr 17, 2003 · Apt 2R
Close - Electric
Electric-supply
Apr 17, 2003 · Apt 2R
Close - Heating
Heat related
Apr 17, 2003 · Apt 2R
Close - Heating
Heat related
Mar 10, 2003 · Apt 2R
Close - General
Mailbox
Mar 7, 2003 · Apt 2R
Close - Electric
Bell-buzzer/intercom
Mar 7, 2003 · Apt 2R
Close - General
Windows
Mar 7, 2003 · Apt 2R
Close - Heating
Heat related
Mar 7, 2003 · Apt 2R
Close - Heating
Heat related
Feb 24, 2003 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1927
- Floors
- 2
- Residential units
- 2
- Building area
- 3,200 ft²
- Lot area
- 1,600 ft²
- Zoning
- R6
- Community board
- 318
- Council district
- 45
- Block / lot
- 7630 / 9
- Assessed value
- $91,020
- Landmark / historic district
- No
Questions about 3003 Avenue L
Who owns 3003 Avenue L?
The owner of record in NYC Department of City Planning PLUTO data is 3007 Ave L, LLC.
Does 3003 Avenue L have violations?
Yes. NYC HPD has recorded 20 housing violations at this property.
Is 3003 Avenue L rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 3003 Avenue L built?
City records list 1927 as the year it was built.
How many apartments are in 3003 Avenue L?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.