Violations at Brooklyn Avenue
Brooklyn, NY 11210 · BBL 3-07564-0011 · Back to the property
HPD housing violations
9 HPD violations, newest first.
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 18, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective glass in buliding entrance door
Jul 28, 2018
Closed — Violation closed - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yard
Jul 28, 2018
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective glass at entrance door to bldg at public hall, 1st story
Jul 22, 2018
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yard
Jul 8, 2018
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
May 21, 2018
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2, 2nd story
May 20, 2018 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story
May 20, 2018 · Apt 2
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yard and the front yard
Jul 10, 2017
Closed — Violation closed
DOB building violations
1 DOB violations, newest first.
- Unsafe buildings none
Ub-unsafe buildings none
Apr 29, 2021
V%*-dob violation - dismissed
ECB violations
12 ECB violations, newest first.
- Class - 2
At the time of my inspection of a active 4 story nb construction site i observed a sidewalk shed installed at expos 1 & 2. after requesting to see a daily pre shift inspection log for the sidewalk shed as well
Mar 28, 2023
Resolve - Class - 2
At the time of my inspection i observed a sidewalk installed at expo 1 approx. 6ft from un-insulated powerlines. scaffolds/sidewalk shed shall not be erected, used, dismantled, altered, or moved within 10ft fro
Mar 28, 2023
Resolve - Class - 2
At the time of my inspection i observed a sidewalk shed installed at expo 1 & 2. after review of provided approved drawings it was determined installation was contrary to approved drawings. bays have been added
Mar 28, 2023
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. at time of inspection, observed at (rear yard) the site, a pile of construction debris including pieces of wood and crashed concrete masonry (
Jan 31, 2023
Resolve - Class - 1
Tempered with, removed, or defaced a written posted stop work order stop work order (swo)., comply with code
Jan 31, 2023
Resolve - Class - 1
Unlawfully continued of work while on notice of a stop work order. at time of inspection, observed approximately 10 construction workers performing work, including installation of metal studs, running steel pip
Jan 31, 2023
Resolve - Class - 2
Failure of permit holder to provide access to and/or expose ongoing construction or work on an active and permitted worksite. at time of inspection, observed an ongoing construction of a new four (4) story, pen
Jan 20, 2023
Resolve - Class - 2
Proposed 4 story nb, site was closed at time of inspection, i observed sidewalk shed(sws) at exp1 missing parapet panel as required by bc3307.6.4.6. hazard of struck by exists for public that can cause them ser
Dec 22, 2022 · Penalty $2,400
Resolve - Class - 2
Failure to comply w/the comm's order to file a cert of correction w/the dept of bldgs. note: at time of inspection observed the above premises failed to comply w/the commissioners to file a cert of correction w
Aug 18, 2021 · Penalty $625
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of building dob for violation#35477884k.note:observed at time of inspection there was no compliance with t
Mar 24, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to maintain bldg walls or appurtenances. noted: at exp#1 of 2.75 sty bldg 2 front windows glass broken,site door to cellar at exp#4 broken rear door to house entrance at exp#3 broken. the rear yard hous
May 18, 2020 · Penalty $3,125
Resolve - Class - 1
Work w/o a permit. observed the installation of 2 hot water boilers, 1kenmore hot water heater, gas piping installation in basement. according to dob records there are no permits shown for this job. partial swo
Dec 28, 2011
Resolve