Violations at 2427 Coyle Street
Brooklyn, NY 11235 · BBL 3-07427-0064 · Back to the property
HPD housing violations
13 HPD violations, newest first.
- BHazardous
Replace with new the missing wood molding around the window opening in the 1st room from north at east located at apt 1, 1st story
Dec 1, 2000 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling inthe 1st room from south at east and in the 1st room from north at east located at apt 1, 1st story
Dec 1, 2000 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective door bell entrance door in the foyer located at apt 1, 1st story
Sep 27, 2000 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tile in the bathroom located at apt 1, 1st story
Sep 27, 2000 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of leaky water closet tank leaking when flushed in the bathroom located at apt 1, 1st story
Sep 27, 2000 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the bathroom located at apt 1, 1st story
Sep 27, 2000 · Apt 1
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets hot water washbasin in the bathroom located at apt 1, 1st story
Sep 27, 2000 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective upper and lower window sash in the 1st room from east located at apt 1, 1st story
Sep 27, 2000 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective gas burners gas range in the kitchen located at apt 1, 1st story
Sep 27, 2000 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt 1, 1st story
Sep 27, 2000 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of evidence of water leak ceiling in the kitchen located at apt 1, 1st story
Sep 27, 2000 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling throughout. in the entire apartment located at apt 1fl, 1st story
Sep 16, 2000 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt 1fl, 1st story
Sep 16, 2000 · Apt 1FL
Open — Nov sent out
DOB building violations
1 DOB violations, newest first.
- Unsafe buildings none
Ub-unsafe buildings none
Aug 22, 2015
Dob violation - dismissed
ECB violations
No ECB violations on record