roofy

Violations at 2449 Coyle Street

Brooklyn, NY 11235 · BBL 3-07427-0056 · Back to the property

HPD housing violations

33 HPD violations, newest first.

  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 1st story

    Mar 5, 2008 · Apt 1

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1, 1st story

    Mar 5, 2008 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the foyer located at apt 1fl, 1st story

    Feb 21, 2008 · Apt 1FL

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective base cabinet at south wall in the kitchen located at apt 1fl, 1st story, 1st apartment from east at south

    Feb 21, 2008 · Apt 1FL

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1fl, 1st story, 1st apartment from east at south

    Feb 21, 2008 · Apt 1FL

    Open — Nov sent out
  • ANon-hazardous

    Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 1fl, 1st story, 1st apartment from east at south

    Feb 21, 2008 · Apt 1FL

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1fl, 1st story, 1st apartment from east at south

    Feb 21, 2008 · Apt 1FL

    Open — Nov sent out
  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1fl, 1st story, 1st apartment from east at south

    Feb 21, 2008 · Apt 1FL

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective mortise lock at door in the entrance located at apt 1fl, 1st story, 1st apartment from east at south

    Feb 21, 2008 · Apt 1FL

    Open — Nov sent out
  • BHazardous

    Properly secure the loose washbasin in the bathroom located at apt 1fl, 1st story, 1st apartment from east at south

    Feb 21, 2008 · Apt 1FL

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1fl, 1st story, 1st apartment from east at south

    Feb 21, 2008 · Apt 1FL

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1fl, 1st story, 1st apartment from east at south

    Feb 21, 2008 · Apt 1FL

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color east wall in the 1st room from east at north located at apt 1fl, 1st story, 1st apartment from east at south

    Feb 21, 2008 · Apt 1FL

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of concealed water leak at east wall in the 1st room from east at north located at apt 1fl, 1st story, 1st apartment from east at south

    Feb 21, 2008 · Apt 1FL

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color east wall in the 2nd room from east at north located at apt 1fl, 1st story, 1st apartment from east at south

    Feb 21, 2008 · Apt 1FL

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of concealed water leak at east wall in the 2nd room from east at north located at apt 1fl, 1st story, 1st apartment from east at south

    Feb 21, 2008 · Apt 1FL

    Open — Nov sent out
  • CImmediately hazardous

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1fl, 1st story, 1st apartment from east at south

    Feb 21, 2008 · Apt 1FL

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective faucets hot and cold water at the sink in the kitchen located at apt 1flr, 1st story

    Feb 19, 2008 · Apt 1FLR

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1flr, 1st story

    Feb 19, 2008 · Apt 1FLR

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1flr, 1st story

    Feb 19, 2008 · Apt 1FLR

    Open — Nov sent out
  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1flr, 1st story

    Feb 19, 2008 · Apt 1FLR

    Open — Nov sent out
  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1fl, 1st story, apartment at south

    Oct 24, 2007 · Apt 1FL

    Open — Certification postponment granted
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department ceiling and east wall in the 1st room from east at south located at apt 1fl, 1st story, apartment at south

    Oct 24, 2007 · Apt 1FL

    Open — Certification postponment granted
  • BHazardous

    Abate the nuisance consisting of evidence of water leak at ceiling and east wall in the 1st room from east at south located at apt 1fl, 1st story, apartment at south

    Oct 24, 2007 · Apt 1FL

    Open — Certification postponment granted
  • ANon-hazardous

    Refit door entrance to apt

    Oct 24, 2007

    Open — Certification postponment granted
  • BHazardous

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1fl, 1st story, apartment at south

    Oct 24, 2007 · Apt 1FL

    Open — Certification postponment granted
  • BHazardous

    Properly repair the broken or defective drawer of base cabinet at south wall in the kitchen located at apt 1fl, 1st story, apartment at south

    Oct 24, 2007 · Apt 1FL

    Open — Certification postponment granted
  • BHazardous

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1fl, 1st story, apartment at south

    Oct 24, 2007 · Apt 1FL

    Open — Certification postponment granted
  • BHazardous

    Remove all obstructions and repair all defects in bathtub in the bathroom located at apt 1fl, 1st story, apartment at south

    Oct 24, 2007 · Apt 1FL

    Open — Certification postponment granted
  • BHazardous

    Properly secure the loose washbasin in the bathroom located at apt 1fl, 1st story, apartment at south

    Oct 24, 2007 · Apt 1FL

    Open — Certification postponment granted
  • BHazardous

    Remove all obstructions and repair all defects in washbasin in the bathroom located at apt 1fl, 1st story, apartment at south

    Oct 24, 2007 · Apt 1FL

    Open — Certification postponment granted
  • ANon-hazardous

    Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 1fl, 1st story, apartment at south

    Oct 24, 2007 · Apt 1FL

    Open — Certification postponment granted
  • BHazardous

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1fl, 1st story, apartment at south

    Oct 24, 2007 · Apt 1FL

    Open — Certification postponment granted

DOB building violations

No DOB violations on record

ECB violations

No ECB violations on record