roofy

Violations at 2345 Bragg Street

Brooklyn, NY 11229 · BBL 3-07410-0135 · Back to the property

HPD housing violations

11 HPD violations, newest first.

  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 8, 2019

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the nuisance consisting of concealed water leak at ceiling, in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Jul 12, 2007 · Apt 1

    Closed — Violation closed
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling, in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Jul 12, 2007 · Apt 1

    Closed — Violation closed
  • BHazardous

    Provide an adequate supply of gas to the fixtures at kitchen. in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Jul 12, 2007 · Apt 1

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... closet ceiling , in the 3rd room from east located at apt 1, 1st story, 1st apartment from west at north

    Jul 12, 2007 · Apt 1

    Closed — Violation closed
  • BHazardous

    Properly repair the broken or defective electric outlet at south wall, in the 3rd room from east located at apt 1, 1st story, 1st apartment from west at north

    Jul 12, 2007 · Apt 1

    Closed — Violation closed
  • BHazardous

    Abate the nuisance consisting of vermin roaches, in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Jul 12, 2007 · Apt 1

    Closed — Violation closed
  • CImmediately hazardous

    Replace with new the missing rear drain cover yard, 1st story

    Jul 12, 2007

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective cement at east wall, rear yard, 1st story

    Jul 12, 2007

    Closed — Violation closed
  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Jul 12, 2007 · Apt 1

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color closet ceiling, in the 3rd room from east located at apt 1, 1st story, 1st apartment from west at north

    Jul 12, 2007 · Apt 1

    Closed — Violation closed

DOB building violations

1 DOB violations, newest first.

  • Zoning none

    Z-zoning none

    Jul 27, 1995

    Dob violation - dismissed

ECB violations

3 ECB violations, newest first.

  • Non-hazardous

    Work without a permit work noted built steel enclosed permit approx 15x 15 on steel columns at 2nd floor rear remedy:obtain a permit

    Mar 22, 2004 · Penalty $2,500

    Resolve
  • Non-hazardous

    Work without a permit. work noted: enclosed porch has been constructed at rear of building. second floor. approx size 10 ftx 12 ft. remedy: obtain a permit if feasible or restore premises to prior legal conditi

    Aug 15, 1995

    Resolve
  • Non-hazardous

    Work without a permit note:install on roof satelite dish into (bolted)roof beams,salete dish is approx 10'high by 8' wide remedy:obtain a permit if feasible or restore to original legal use

    Jan 16, 1991

    Resolve