Violations at 2323 Batchelder Street
Brooklyn, NY 11229 · BBL 3-07408-0001 · Back to the property
HPD housing violations
47 HPD violations, newest first.
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings and walls in the entire apartment located at apt 2d, 2nd story, 1st apartment from west at north
May 30, 2018 · Apt 2D
Open — Nov sent out - BHazardous
Code: arrange and make self-closing the doors .. in the entrance located at apt 2d, 2nd story, 1st apartment from west at north
May 30, 2018 · Apt 2D
Open — Nov sent out - BHazardous
Repair or replace the smoke detector misssing located at apt 2d, 2nd story, 1st apartment from west at north
May 30, 2018 · Apt 2D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the kitchen located at apt 2d, 2nd story, 1st apartment from west at north
May 30, 2018 · Apt 2D
Open — Nov sent out - BHazardous
Properly repair the broken or defective light fixture on south wall in the bathroom located at apt 2d, 2nd story, 1st apartment from west at north
May 30, 2018 · Apt 2D
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation steam riser in the 2nd room from north at east located at apt 2d, 2nd story, 1st apartment from west at north
May 30, 2018 · Apt 2D
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation steam riser in the kitchen located at apt 2d, 2nd story, 1st apartment from west at north
May 30, 2018 · Apt 2D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north and south walls in the 2nd room from east located at apt 2d, 2nd story, 1st apartment from west at north
May 30, 2018 · Apt 2D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 4th room from east located at apt 2d, 2nd story, 1st apartment from west at north
May 30, 2018 · Apt 2D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east located at apt 2d, 2nd story, 1st apartment from west at north
May 30, 2018 · Apt 2D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north at east located at apt 2d, 2nd story, 1st apartment from west at north
May 30, 2018 · Apt 2D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the private hallway located at apt 2d, 2nd story, 1st apartment from west at north
May 30, 2018 · Apt 2D
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 2d, 2nd story, 1st apartment from west at north
May 30, 2018 · Apt 2D
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures at sink in the kitchen located at apt 2d, 2nd story, 1st apartment from west at north
May 30, 2018 · Apt 2D
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the private hallway located at apt 2d, 2nd story, 1st apartment from west at north
May 30, 2018 · Apt 2D
Open — Nov sent out - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 2d, 2nd story, 1st apartment from west at north
May 30, 2018 · Apt 2D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the kitchen located at apt 2d, 2nd story, 1st apartment from west at north
May 30, 2018 · Apt 2D
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls in the entire apartment located at apt 2f, 2nd story
May 30, 2006 · Apt 2F
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective windows in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
May 30, 2006 · Apt 2F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls in the private hallway located at apt 2f, 2nd story
May 30, 2006 · Apt 2F
Open — Nov sent out - BHazardous
Replace with new the broken or defective electrical outlet at north wall in the 3rd room from north located at apt 2f, 2nd story, 1st apartment from east at south
May 30, 2006 · Apt 2F
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - ANon-hazardous
Replace with new the missing west closet door knob in the 1st room from east at north located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, east wall, north wall, west wall, 1st closet from south at west wall wall in the 1st room from east at north located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall, 1st closet from south at west wall door, 1st closet from south at west wall door frame in the 1st room from east at north located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from north at east wall, 1st door frame from east at south wall in the 1st room from east at north located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the kitchen located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroom located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall in the bathroom located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from west at north wall in the bathroom located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd closet from north at east wall door, 1st closet from north at east wall door in the foyer located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the foyer located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st closet from north at east wall door frame, 2nd closet from north at east wall door frame, 1st door frame from south at west wall in the foyer located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, east wall, north wall in the private hallway located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from east at south wall door in the private hallway located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st closet from east at south wall door frame, 1st door frame from north at east wall, 1st door frame from west at north wall, 1st door frame from east at south wall in the private hallway located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, north wall in the 3rd room from east located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from south at west wall, 2nd riser from south at west wall, 1st door frame from east at south wall, 1st door frame from south at west wall, 1st door frame from north at east wall in the 3rd room from east located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from south at west wall, 1st closet from east at south wall door, 1st closet from south at west wall door in the 1st room from east at south located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, north wall in the 1st room from east at south located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from north at east wall, 1st closet from south at west wall door frame, 1st closet from east at south wall door frame, 1st door frame from south at west wall in the 1st room from east at south located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 2nd room from east at north located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 2nd riser from west at north wall, 1st riser from west at north wall, 1st radiator from west at north wall, 1st door frame from east at south wall in the 2nd room from east at north located at apt 5c, 5th story, 1st apartment from north at east
Aug 25, 2005 · Apt 5C
Open — Nov sent out
DOB building violations
28 DOB violations, newest first.
- Failure to correct swarmp conditions (facade) facade required
Nycha cycle 9b failure to correct swarmp conditions
Dec 29, 2022
Dob violation - dismissed - Failure to correct swarmp conditions (facade) facade required
Nycha cycle 9b failure to correct swarmp conditions
Dec 29, 2022
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Nycha elev annual inspection/test elevatorrequired
Vio issued to nycha elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Nycha elev annual inspection/test elevatorrequired
Vio issued to nycha elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Oct 17, 2008
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Oct 17, 2008
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Elevator elevatoroptional
1
Apr 7, 1992
Dob violation - dismissed
ECB violations
16 ECB violations, newest first.
- Class - 1
Failure to maintain buildings exterior walls and/or appurtenances.-at time of inspection observed loose flower pots resting on a window silllocated on the 2nd floor of exposure 1(north elevation).-multiple impr
Sep 24, 2024 · Penalty $2,500
Resolve - Class - 2
Failure to maintain exterior building facade expsoure(4) broken windowfirst flr, expsoure(1) damaged window sill(lintel level). remedy: maintain external facade and appurtenances as per 1rcny.
Jul 31, 2024 · Penalty $1,250
Resolve - Class - 1
Failure to comply w/manufacturer specs.note:atoi@6stybldg w/active facade work.i observed suspended scf in place.upon rev of manufacturer specs provided stirrups didnt comply observed them@3' when manufacturer
Apr 13, 2021
Resolve - Class - 1
Failure to promptly notify dept of accident or damage to property@timeof const/demo note:@time of my insp of 6stybldg facade work in progress in responding to incident reported to dept by fdny that 2workers got
Apr 9, 2021
Resolve - Class - 2
3314.4.3.2 fail to provide installation inspection for suspended scaffolds.at the time of inspection of an active jobsite,observed four workers working on a suspended scaffolds,,upon request to see installation
Jan 8, 2021
Resolve - Class - 2
Work does not conform to cd-5(missing details)at the time of an inspection of an active jobsite,upon reviewing cd-5 observed following conditions.missing details for beams,platform,motors,plywood and styrofoam
Jan 8, 2021
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #810634.rem:submit required technical report
Oct 15, 2018
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #810363.rem:submit required technical report
Oct 15, 2018
Resolve - Class - 2
Shed not to code spec. 3307.6.5.3 responsibility for maintenance. shed shall be maintained by gc where there is no gc the bldg owner. noted: at time of inspection sidewalk shed on exp#1(ave x)shed is missing 3
Nov 3, 2016
Resolve - Class - 2
Temporary construction equipment onsite expired permit.noted:@time of sidewalk on site w.expired permit permit #340313173 expired on 10/12/16.rem:renew permit.
Nov 3, 2016
Resolve - Class - 2
Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. 36013943m. remedy: file an amended report following
Dec 17, 2010
Resolve - Class - 2
Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98report.36011471y.rem:file an amended report following remedial
Jun 25, 2010
Resolve - Class - 2
Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report rem: file an amended report following remedial repair
Dec 23, 2009
Resolve - Class - 2
Work w/o a permit. expired permit noted: there are sidewalk shed installed and permit #320024834 has been expired on 08-13-09. remedy: renewshed permit.
Aug 24, 2009 · Penalty $400
Resolve - Class - 2
Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11-98 report remedy:file an amended report following remedial re
Dec 5, 2008 · Penalty $4,000
Resolve - Class - 2
Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11-98 report remedy:file an amended report following remedial re
Dec 5, 2008
Resolve