roofy

Violations at 2551 Ocean Parkway

Brooklyn, NY 11235 · BBL 3-07220-0110 · Back to the property

HPD housing violations

The newest 50 of 72 HPD violations. The city keeps the complete history.

  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Mar 6, 2026 · Apt 1

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 20, 2025

    Open — Info nov sent out
  • CImmediately hazardous

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt a, 1st story, 1st apartment from east at south

    Nov 19, 2025 · Apt A

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective radiator shut-off knob in the 3rd room from east at north located at apt a, 1st story, 1st apartment from east at south

    Nov 19, 2025 · Apt A

    Open — Nov sent out
  • CImmediately hazardous

    Abate the nuisance consisting of scalding hot water temp. above 130 degrees at all hot water fixture in the entire apartment located at apt a, 1st story, 1st apartment from east at south

    Nov 19, 2025 · Apt A

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt a, 1st story, 1st apartment from east at south

    Nov 19, 2025 · Apt A

    Open — Nov sent out
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt a, 1st story, 1st apartment from east at south

    Nov 19, 2025 · Apt A

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Jan 16, 2024

    Open — Info nov sent out
  • CImmediately hazardous

    Provide ready access to buildings heating system locked door at cellar

    Jan 15, 2024

    Open — Nov sent out
  • BHazardous

    Remove all encumbrances consisting of cardboard boxes and household items at public hall, 2nd story

    Jan 15, 2024

    Open — Nov sent out
  • CImmediately hazardous

    Abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hotwater fixtures in the entire apartment in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south

    Jan 15, 2024 · Apt 2B

    Closed — Violation closed
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south

    Jan 15, 2024 · Apt 2B

    Closed — Violation closed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 16, 2022

    Open — Info nov sent out
  • CImmediately hazardous

    Abate the nuisance consisting of hot water exceeds the maximum allowable operating temperature of 130f at all fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Nov 15, 2022 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the west and north walls and west window stool in the kitchen located at apt a, 1st story, apartment at south

    Jul 23, 2021 · Apt A

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at west and north walls and west window stool in the kitchen located at apt a, 1st story, apartment at south

    Jul 23, 2021 · Apt A

    Open — Nov sent out
  • ANon-hazardous

    Refit the doors at wash basin cabinet in the bathroom located at apt a, 1st story, apartment at south

    Jul 23, 2021 · Apt A

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt a, 1st story, apartment at south

    Jul 23, 2021 · Apt A

    Open — Nov sent out
  • BHazardous

    Replace with new the broken or defective ceramic floor tiles in the bathroom located at apt a, 1st story, 1st apartment from east at south

    Jul 7, 2021 · Apt A

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective ceramic tiles at south and west walls. in the bathroom located at apt a, 1st story, 1st apartment from east at south

    Jul 7, 2021 · Apt A

    Open — Nov sent out
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective located at apt a, 1st story, apartment at south

    Oct 29, 2020 · Apt A

    Open — Nov sent out
  • BHazardous

    Abate the infestation consisting of mice in the entire apartment located at apt a, 1st story, apartment at south

    Oct 29, 2020 · Apt A

    Open — Nov sent out
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling 1 sq.ft. in the bathroom located at apt 1a, 1st story, 1st apartment from east at south

    Dec 17, 2015 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling 1sq.ft. at closet in the 1st room from east at south located at apt 1a, 1st story, 1st apartment from east at south

    Dec 17, 2015 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of roaches located at apt 1a, 1st story, 1st apartment from east at south

    Dec 17, 2015 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of mice located at apt 1a, 1st story, 1st apartment from east at south

    Dec 17, 2015 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective wood floor walking area in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Dec 17, 2015 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceilings and walls in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Dec 17, 2015 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of mice located at apt a, 1st story, 1st apartment from east at south

    Apr 23, 2015 · Apt A

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, apartment at south

    Nov 12, 2012 · Apt 2

    Closed — Violation dismissed
  • BHazardous

    Properly repair the broken or defective entrance to building door

    May 12, 2009

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling & walls at public hall, 2nd story

    May 12, 2009

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department walls & ceilings in the entire apartment located at apt 2b, 2nd story

    May 12, 2009 · Apt 2B

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective electric bell system in the entire apartment located at apt 2b, 2nd story

    May 12, 2009 · Apt 2B

    Open — Nov sent out
  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2b, 2nd story

    May 12, 2009 · Apt 2B

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north at west located at apt 2b, 2nd story

    May 12, 2009 · Apt 2B

    Open — Nov sent out
  • BHazardous

    Repair the roof so that it will not leak at ceiling in the 1st room from north at west located at apt 2b, 2nd story

    May 12, 2009 · Apt 2B

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2fl, 2nd story

    May 31, 2008 · Apt 2FL

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1a, 1st story

    Feb 10, 2008 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1a, 1st story

    Feb 10, 2008 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1a, 1st story

    Sep 22, 2007 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1a, 1st story

    Sep 22, 2007 · Apt 1A

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt a, 1st story

    Sep 22, 2007 · Apt A

    Closed — Violation dismissed
  • BHazardous

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt a, 1st story

    Sep 22, 2007 · Apt A

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department walls & ceiling all rooms 1 sty. apt.

    Jan 20, 2005

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective wood floors all rooms trip hazzard 1st sty apt.

    Jan 20, 2005

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department walls and ceilings of apt 1st sty apt.

    Jan 20, 2005

    Open — Nov sent out
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling of bathroom 1st sty apt.

    Jan 20, 2005

    Open — Nov sent out
  • ANon-hazardous

    Provide a peep hole in entrance door of the dwelling unit so located as to permit a person inside the dwelling unit to view any person outside entrance door to 1st story apartment.

    Jan 20, 2005

    Open — Nov sent out
  • ANon-hazardous

    Replace with new the missing locking device of kitchen window, 1st story apartment.

    Jan 20, 2005

    Open — Nov sent out

DOB building violations

9 DOB violations, newest first.

  • Construction other optional

    @ 2nd floor units, completed demolition on walls, partitions, ceiling, new electrical boxes outlets, gas plumbing, new 3 pcs bathroom with waste, water lines for sink, shower, toilet & kitchen

    Oct 11, 2023

    Vpw-violation unserved ecb-work without permit-active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active

ECB violations

4 ECB violations, newest first.

  • Class - 2

    Old unused boiler and hot water heater are not legally abandoned, maintain boiler; correct violation and submit the certificate of correction

    Oct 8, 2019 · Penalty $1,562

    Resolve
  • Class - 2

    Gas meter room has holes in walls and ceiling and is not ventilated; correct violations and submit the certificate of correction+

    Oct 8, 2019 · Penalty $3,125

    Active
  • Class - 3

    16 32a 15 24b 38

    Apr 6, 2010 · Penalty $250

    Resolve
  • Non-hazardous

    49-exposed beams-no approved fire rating wall above boiler.36-boiler not registered with ny city department of buildings.

    Dec 4, 2000 · Penalty $350

    Active