Violations at 2568 East 6 Street
Brooklyn, NY 11235 · BBL 3-07220-0080 · Back to the property
HPD housing violations
35 HPD violations, newest first.
- BHazardous
Properly repair with similar material the broken or defective linolium tiles at floor at public hall, 1st story
Jun 12, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1stflo, 1st story, 1st apartment from north at east
Jan 19, 2026 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department building door entance , 1st story
Aug 13, 2025
Open — Invalid certification - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tile at south wall in the bathroom located at apt b, 2nd story, 1st apartment from west at north
Aug 13, 2025 · Apt B
Open — Nov sent out - BHazardous
Repair the broken or defective connection wasteline bathtub in the bathroom located at apt b, 2nd story, 1st apartment from west at north
Aug 13, 2025 · Apt B
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt a, 1st story, 1st apartment from west at north
Aug 13, 2025 · Apt A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt a, 1st story, 1st apartment from west at north
Aug 13, 2025 · Apt A
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jul 24, 2025
Open — Info nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Jul 21, 2025 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall and east wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from west at north
Jul 21, 2025 · Apt 2NDFLO
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt a, 1st story, 1st apartment from north at east
Jan 31, 2024 · Apt A
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Nov 27, 2023 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Nov 27, 2023 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Nov 27, 2023 · Apt 2
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approx 2 sq ft at ceilng in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east original violation 15347556 issued 06-sep-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Sep 6, 2022 · Apt 1STFL
Open — Defect letter issued - BHazardous
Replace with new the missing knobs at door and drawer at base cabinet at west in the kitchen located at apt 1stfl, 1st story, 1st apartment from north at east
Sep 6, 2022 · Apt 1STFL
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective reglaze enamel at bathtub in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east
Sep 6, 2022 · Apt 1STFL
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 2 sq ft at ceilng in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east
Sep 6, 2022 · Apt 1STFL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east, south walls and ceiling in the bathroom located at apt 1stfl, 1st story, 1st apartment from north at east
Sep 6, 2022 · Apt 1STFL
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jul 6, 2022
Open — Info nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt a, 1st story, 1st apartment from north at east
Jun 18, 2022 · Apt A
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt a, 1st story, 1st apartment from north at east
Jun 18, 2022 · Apt A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east and south walls in the bathroom located at apt a, 1st story, 1st apartment from north at east
Jun 18, 2022 · Apt A
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective .. window tilt latch, at window lower sash in the kitchen located at apt a, 1st story, 1st apartment from north at east
Jun 1, 2022 · Apt A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling, in the bathroom located at apt a, 1st story, 1st apartment from north at east
Jun 1, 2022 · Apt A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling, east and south wall in the bathroom located at apt a, 1st story, 1st apartment from north at east
Jun 1, 2022 · Apt A
Open — Nov sent out - BHazardous
Replace with new the broken or defective electric light fixture at ceiling in the 1st room from north located at apt a, 1st story, 1st apartment from north at east
Sep 16, 2015 · Apt A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at north wall in the 1st room from north located at apt a, 1st story, 1st apartment from north at east
Sep 16, 2015 · Apt A
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from north located at apt a, 1st story, 1st apartment from north at east
Sep 16, 2015 · Apt A
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt a, 1st story, 1st apartment from west at north
Nov 18, 2012 · Apt A
Open — Nov certified late - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Nov 15, 2012 · Apt 2
Open — Nov certified late - ANon-hazardous
Properly repair the broken or defective - door bell from front entry door to 2nd sty. apt.
Aug 20, 2005
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective concrete step front entrance building.
Aug 9, 2004
Open — Nov sent out - BHazardous
Properly secure the loose handrail front building.
Aug 9, 2004
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective bell and return buzzer front entrance to 2nd story apt.
Aug 9, 2004
Open — Not complied with
DOB building violations
11 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active
ECB violations
1 ECB violations, newest first.
- Class - 2
Boiler roll out switch is defective-cold water pipes sweating in boiler room-light is defective-chimney base door is defective-hwh flue has incorrect support-gas room door is defective and no ventilation-sump p
May 29, 2020 · Penalty $1,562
Resolve