roofy

Violations at 388 Avenue X

Brooklyn, NY 11223 · BBL 3-07197-0001 · Back to the property

HPD housing violations

The newest 50 of 489 HPD violations. The city keeps the complete history.

  • BHazardous

    Trace and repair the source and abate the visible mold condition... more than 10th sq ft observed at ceiling in the 1st room from north located at cellar apt 1g, 2nd cellar apt from west at north

    Oct 16, 2026 · Apt 1G

    Open — Notice of issuance sent to tenant
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at cellar apt 1g, 2nd cellar apt from west at north

    Oct 16, 2026 · Apt 1G

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at cellar apt 1g, 2nd cellar apt from west at north

    Oct 16, 2026 · Apt 1G

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at cellar apt 1g, 2nd cellar apt from west at north

    Oct 16, 2026 · Apt 1G

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchen located at cellar apt 1g, 2nd cellar apt from west at north

    Oct 16, 2026 · Apt 1G

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at cellar apt 1g, 2nd cellar apt from west at north

    Oct 16, 2026 · Apt 1G

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at cellar apt 1g, 2nd cellar apt from west at north

    Oct 16, 2026 · Apt 1G

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at building entrance door

    Sep 29, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair with similar material the broken or defective ceramic tiles at north facade at building front

    Sep 29, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at cellar apt 1g, 2nd cellar apt from west at north

    Sep 29, 2026 · Apt 1G

    Open — Notice of issuance sent to tenant
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at cellar apt 1g, 2nd cellar apt from west at north

    Sep 29, 2026 · Apt 1G

    Open — Nov sent out
  • BHazardous

    Refit the lower window sash at window at north wall in the 3rd room from east located at cellar apt 1g, 2nd cellar apt from west at north

    Sep 29, 2026 · Apt 1G

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective spring balances at lower window sash at window at north wall in the 3rd room from east located at cellar apt 1g, 2nd cellar apt from west at north

    Sep 29, 2026 · Apt 1G

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective spring balances at upper window sash at north wall in the 3rd room from east located at cellar apt 1g, 2nd cellar apt from west at north

    Sep 29, 2026 · Apt 1G

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at cellar apt 1g, 2nd cellar apt from west at north

    Sep 29, 2026 · Apt 1G

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at cellar apt 1g, 2nd cellar apt from west at north

    Sep 29, 2026 · Apt 1G

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective grout inbetween ceramic floor tiles in the kitchen located at cellar apt 1g, 2nd cellar apt from west at north

    Sep 29, 2026 · Apt 1G

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at cellar apt 1g, 2nd cellar apt from west at north

    Sep 29, 2026 · Apt 1G

    Open — Nov sent out
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster at the ceiling in the 3rd room from east located at cellar apt 1g, 2nd cellar apt from west at north

    Sep 29, 2026 · Apt 1G

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at north wall in the kitchen located at cellar apt 1g, 2nd cellar apt from west at north

    Sep 29, 2026 · Apt 1G

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 7l, 6th story, 1st apartment from south at west

    Aug 14, 2026 · Apt 7L

    Closed — Violation closed
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 7l, 6th story, 1st apartment from south at west

    Aug 14, 2026 · Apt 7L

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling northwest clost in the 1st room from east at north located at apt 7l, 6th story, 1st apartment from south at west

    Aug 14, 2026 · Apt 7L

    Closed — Violation closed
  • BHazardous

    Repair the roof so that it will not leak over ceiling at northwest closet in the 1st room from east at north located at apt 7l, 6th story, 1st apartment from south at west

    Aug 14, 2026 · Apt 7L

    Closed — Violation closed
  • CImmediately hazardous

    Properly repair or replace the broken or defective lower sash window counter ballance causing gilloutine effect in the kitchen located at apt 7l, 6th story, 1st apartment from south at west

    Aug 14, 2026 · Apt 7L

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective rubber gasket at refrigirator door in the kitchen located at apt 7l, 6th story, 1st apartment from south at west

    Aug 14, 2026 · Apt 7L

    Open — Civ14 mailed
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4e, 3rd story, 1st apartment from north at east

    Aug 11, 2026 · Apt 4E

    Closed — Violation closed
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4e, 3rd story, 1st apartment from north at east

    Aug 11, 2026 · Apt 4E

    Closed — Violation closed
  • BHazardous

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4e, 3rd story, 1st apartment from north at east

    Aug 11, 2026 · Apt 4E

    Open — Not complied with
  • BHazardous

    Properly secure the loose base cabinet at west wall in the kitchen located at apt 4e, 3rd story, 1st apartment from north at east

    Aug 11, 2026 · Apt 4E

    Open — Not complied with
  • BHazardous

    Properly repair or replace the broken or defective counter balance at window lower sash, 1st window from north at east in the 1st room from east located at apt 4e, 3rd story, 1st apartment from north at east

    Aug 11, 2026 · Apt 4E

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 4th room from north located at apt 6f, 5th story, 2nd apartment from west at north

    Jul 29, 2026 · Apt 6F

    Closed — Violation closed
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 6f, 5th story, 2nd apartment from west at north

    Jul 29, 2026 · Apt 6F

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd bathroom from north, the 3rd room from north, the kitchen , the 1st bathroom from north located at apt 5d, 4th story, 2nd apartment from south at west

    Jul 29, 2026 · Apt 5D

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 5d, 4th story, 2nd apartment from south at west

    Jul 29, 2026 · Apt 5D

    Closed — Violation closed
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 5d, 4th story, 2nd apartment from south at west

    Jul 29, 2026 · Apt 5D

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the visible mold condition... greater than 10 sq.ft at ceiling in the 2nd bathroom from north located at apt 5d, 4th story, 2nd apartment from south at west

    Jul 29, 2026 · Apt 5D

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from north located at apt 5d, 4th story, 2nd apartment from south at west

    Jul 29, 2026 · Apt 5D

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall and ceilg in the kitchen located at apt 1h

    Jul 27, 2026 · Apt 1H

    Open — Not complied with
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at south wall and ceiling in the kitchen located at apt 1h

    Jul 27, 2026 · Apt 1H

    Open — Not complied with
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall and ceiling in the 1st room from north located at apt 1h

    Jul 27, 2026 · Apt 1H

    Open — Not complied with
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at east wall and ceiling in the 1st room from north located at apt 1h

    Jul 27, 2026 · Apt 1H

    Open — Not complied with
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1h

    Jul 27, 2026 · Apt 1H

    Closed — Violation closed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of door with key operated lock preventing entrance to fire escape in the 4th room from north located at apt 6f, 5th story, 2nd apartment from west at north

    Jul 20, 2026 · Apt 6F

    Open — Not complied with
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 6f, 5th story, 2nd apartment from west at north

    Jul 20, 2026 · Apt 6F

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 6f, 5th story, 2nd apartment from west at north

    Jul 20, 2026 · Apt 6F

    Closed — Violation closed
  • BHazardous

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 1st room from north at west located at apt 6f, 5th story, 2nd apartment from west at north

    Jul 20, 2026 · Apt 6F

    Closed — Violation closed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 4h, 3rd story, 4th apartment from west at north

    Jul 20, 2026 · Apt 4H

    Closed — Violation closed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of door with key operated lock preventing entrance to fire escape in the 4th room from north located at apt 4h, 3rd story, 4th apartment from west at north

    Jul 20, 2026 · Apt 4H

    Closed — Violation closed
  • BHazardous

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the private hallway located at apt 2f, 1st story, 2nd apartment from west at north

    Jul 20, 2026 · Apt 2F

    Open — First no access to re- inspect violation

DOB building violations

10 DOB violations, newest first.

  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 27, 2021

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 24, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 20, 2016

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 21, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 23, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 12, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 21, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 16, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 9, 1989

    Dob violation - resolved

ECB violations

10 ECB violations, newest first.

  • Class - 1

    Failure to maintain building in code compliant manner. service elevator equipment as per bc3001.2 & 27-987. upon inspection, the only device in the section of the building is found to be out of service, creatin

    Dec 18, 2025 · Penalty $1,250

    Active
  • Class - 2

    Failure to maintain building in code compliant manner. exhaust discharge must be no closer than 10 feet from building opening as per mc 501.2and rs 13-1 sec. 2-21.4. note: exhaust vent from dryer at 1st floor i

    Jul 19, 2023 · Penalty $1,250

    Active
  • Class - 2

    Main line can be opened when power on. self resetting escape hatch switches prohibited. misaligned cab mirror.

    Jul 9, 2021 · Penalty $312

    Resolve
  • Class - 1

    No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a

    Feb 22, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    56l07,16e10. 56l07-provide the alignment; 16e10-adjust or repair dooron the 7th floor.

    Aug 20, 2018

    Resolve
  • Class - 1

    Filed a certificate form, application etc, containing a material false statement(s). noted: the owner/representative made false certification on section #26 of pw1 job application #321093516 which was filed on

    Oct 23, 2017 · Penalty $2,400

    Resolve
  • Class - 1

    3314.10.3 pswo for suspended scaffold issued pursuant to 28-207.2 &posted @premises unsafe conditions.note:observed outrigger beams are erected not perpendicular to the face of the bldg.that doesn't meet code s

    Jun 24, 2016 · Penalty $1,600

    Resolve
  • Class - 2

    Falure to maintain exterior bldg south elevation exp#3 observed cracksand deteriorating in lintel and parapet (east and west end); blocks o f wood under a/c unit 5th floor; flower pots on fire escape landing

    Jun 13, 2016 · Penalty $500

    Resolve
  • Non-hazardous

    Exit travell path partially obstructed at south side, garage roof. storage of plants, house hold item, shoping units, recycleable materials, partially obstruct fire escape from building is more than

    Sep 23, 1999 · Penalty $350

    Resolve
  • Non-hazardous

    15l,28h,57o,58o,59o,#40,#09 #40 provide proper date tag on 90v for 5 year test or perform test and file form elv#3 .

    Jan 8, 1991 · Penalty $75

    Resolve