Violations at 23 Whitney Place
Brooklyn, NY 11223 · BBL 3-07104-0275 · Back to the property
HPD housing violations
31 HPD violations, newest first.
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2024
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bicycles at public hall, 3rd story
Oct 25, 2018
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at west wall in the kitchen located at apt 1d, 1st story, 2nd apartment from south at west
Oct 3, 2018 · Apt 1D
Open — Nov sent out - BHazardous
Replace the broken or defective missing sink in the kitchen located at apt 1d, 1st story, 2nd apartment from south at west
Oct 3, 2018 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of gas line uncapped in the kitchen located at apt 1d, 1st story, 2nd apartment from south at west
Oct 3, 2018 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 1d, 1st story, 2nd apartment from south at west
Oct 3, 2018 · Apt 1D
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1d, 1st story, 2nd apartment from south at west
Oct 3, 2018 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Refit door at south closet in the private hallway located at apt 1d, 1st story, 2nd apartment from south at west
Sep 29, 2018 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective light fixture at ceiling in the 2nd room from east located at apt 1d, 1st story, 2nd apartment from south at west
Sep 29, 2018 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective light fixture at ceiling in the 3rd room from east located at apt 1d, 1st story, 2nd apartment from south at west
Sep 29, 2018 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings and walls in the entire apartment located at apt 1d, 1st story, 2nd apartment from south at west
Sep 29, 2018 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balance at lower sash west window in the 3rd room from east located at apt 1d, 1st story, 2nd apartment from south at west
Sep 29, 2018 · Apt 1D
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective glass at lower sash west window in the 3rd room from east located at apt 1d, 1st story, 2nd apartment from south at west
Sep 29, 2018 · Apt 1D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the 1st room from east located at apt 1d, 1st story, 2nd apartment from south at west
Sep 29, 2018 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 1st room from east located at apt 1d, 1st story, 2nd apartment from south at west
Sep 29, 2018 · Apt 1D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the 3rd room from east located at apt 1d, 1st story, 2nd apartment from south at west
Sep 29, 2018 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 3rd room from east located at apt 1d, 1st story, 2nd apartment from south at west
Sep 29, 2018 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 1d, 1st story, 2nd apartment from south at west
Sep 29, 2018 · Apt 1D
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice located at apt 1d, 1st story, 2nd apartment from south at west
Sep 29, 2018 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12. at public hall
Sep 8, 2018
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1d, 1st story, 2nd apartment from south at west
Sep 8, 2018 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective space betwwen wood floor in the 4th room from east located at apt 1d, 1st story, 1st apartment from south at west
Sep 8, 2018 · Apt 1D
Closed — Violation dismissed - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1d, 1st story, 2nd apartment from south at west
Sep 8, 2018 · Apt 1D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color wall at northeast corner in the 4th room from east located at apt 1d, 1st story, 2nd apartment from south at west
Sep 8, 2018 · Apt 1D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color northcenter wall in the 2nd room from east located at apt 1d, 1st story, 2nd apartment from south at west
Sep 8, 2018 · Apt 1D
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak dampness penetrating at northcenter wall in the 2nd room from east located at apt 1d, 1st story, 2nd apartment from south at west
Sep 8, 2018 · Apt 1D
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 1d, 1st story, 2nd apartment from south at west
Sep 8, 2018 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 5, 2017
Open — Invalid certification - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 14, 2015
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of bedbugs located at apt 1a, 1st story, 1st apartment from west at north
Jan 30, 2014 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint ceiling center room & kitchen wall & ceiling 3 sty west apt 3c collins no phone. , section '' ''
Mar 31, 1988 · Apt 3C
Open — Nov sent out
DOB building violations
2 DOB violations, newest first.
- Failure to submit eer none
Failure to submit an energy efficiency report in 2014 per ad. code sec. 28-308.4
Dec 31, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active
ECB violations
No ECB violations on record