Violations at 3202 Neptune Avenue
Brooklyn, NY 11224 · BBL 3-07007-0001 · Back to the property
HPD housing violations
The newest 50 of 54 HPD violations. The city keeps the complete history.
- BHazardous
Replace or repair the self-closing doors that is missing or defective at entrance to building , 1st story
Oct 11, 2014
Closed — Violation closed - BHazardous
Replace with new the missing cover at electrical outlet at west wall in the kitchen located at apt 14h, 14th story, 1st apartment from east at south
Oct 11, 2014 · Apt 14H
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiiling, north and west walls in the 3rd room from east located at apt 14h, 14th story, 1st apartment from east at south
Oct 11, 2014 · Apt 14H
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the 3rd room from east located at apt 14h, 14th story, 1st apartment from east at south
Oct 11, 2014 · Apt 14H
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... mildew at ceiling. approx. = 16 sq.ft. in the bathroom located at apt 14h, 14th story, 1st apartment from east at south
Oct 11, 2014 · Apt 14H
Closed — Violation closed - BHazardous
Properly repair the broken or defective electricalfixture at ceiling inside closet in the 2nd room from east located at apt 14h, 14th story, 1st apartment from east at south
Oct 11, 2014 · Apt 14H
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiiling in the 2nd room from east located at apt 14h, 14th story, 1st apartment from east at south
Oct 11, 2014 · Apt 14H
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from east located at apt 14h, 14th story, 1st apartment from east at south
Oct 11, 2014 · Apt 14H
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 14h, 14th story, 1st apartment from east at south
Oct 11, 2014 · Apt 14H
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling. approx. = 10 sq.ft. in the kitchen located at apt 14h, 14th story, 1st apartment from east at south
Oct 11, 2014 · Apt 14H
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the kitchen located at apt 14h, 14th story, 1st apartment from east at south
Oct 11, 2014 · Apt 14H
Closed — Violation closed - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 14h, 14th story, 1st apartment from east at south
Oct 11, 2014 · Apt 14H
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiilings, walls and trim throughout in the entire apartment located at apt 14h, 14th story, 1st apartment from east at south
Oct 11, 2014 · Apt 14H
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balances at upper and lower sashes at south-2 window in the 2nd room from east located at apt 14h, 14th story, 1st apartment from east at south
Oct 11, 2014 · Apt 14H
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiiling and north wall inside closet at north wall in the kitchen located at apt 14h, 14th story, 1st apartment from east at south
Oct 11, 2014 · Apt 14H
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiiling, north and west walls in the kitchen located at apt 14h, 14th story, 1st apartment from east at south
Oct 11, 2014 · Apt 14H
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings in the entire apartment located at apt 7d, 7th story, 1st apartment from west at north
Jan 3, 2014 · Apt 7D
Closed — Violation closed - BHazardous
Properly repair the broken or defective windows center room 3 sty north apt 3f. , section '' ''
Apr 28, 1993 · Apt 3F
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice & roaches thru out 3 sty north apt 3f. , section '' ''
Apr 28, 1993 · Apt 3F
Open — Nov sent out - BHazardous
Replace with new the missing cabinet door kitchen 3 sty north apt 3f. , section '' ''
Apr 28, 1993 · Apt 3F
Open — Nov sent out - BHazardous
Replace with new the broken or defective walls foyer rear 3 sty north apt 3f. , section '' ''
Apr 28, 1993 · Apt 3F
Open — Nov sent out - BHazardous
Replace with new the missing handle stove door kitchen 3 sty north apt 3f. , section '' ''
Apr 28, 1993 · Apt 3F
Open — Nov sent out - BHazardous
Replace with new the broken or defective entrance door 3 sty north apt 3f. , section '' ''
Apr 28, 1993 · Apt 3F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling bathroom 3 sty north apt 3f. , section '' ''
Apr 28, 1993 · Apt 3F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall center room 3 sty north apt 3f. , section '' ''
Apr 28, 1993 · Apt 3F
Open — Nov sent out - ANon-hazardous
Replace with new the broken or defective vinyl floor tiles north room 5 sty east apt 5a , section '' ''
Mar 4, 1993 · Apt 5A
Open — Nov sent out - ANon-hazardous
Properly secure the loose over door gas range kitchen 5 sty east apt 5a , section '' ''
Mar 4, 1993 · Apt 5A
Open — Nov sent out - ANon-hazardous
Replace with new the broken or defective rubber gasket around door refrigerator kitchen 5 sty east apt 5a , section '' ''
Mar 4, 1993 · Apt 5A
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective hollow interior closet door off kitchen 5 sty east apt 5a , section '' ''
Mar 4, 1993 · Apt 5A
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective hollow interior door entrance to north room 5 sty east apt 5a , section '' ''
Mar 4, 1993 · Apt 5A
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective hollow interior door entrance to bathroom 5 sty east apt 5a , section '' ''
Mar 4, 1993 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Replace with new the missing glass window pane bottom sash west room 5 sty east apt 5a , section '' ''
Mar 4, 1993 · Apt 5A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceilings thru out 5 sty east apt 5a , section '' ''
Mar 4, 1993 · Apt 5A
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of water stained walls & ceiling bathroom & front & rear foyers 6 sty southeast apt 6f , section '' ''
Aug 11, 1992 · Apt 6F
Open — Nov sent out - BHazardous
Properly repair the broken or defective counter balances 2nd window from north center room 6 sty southeast apt 6f , section '' ''
Aug 11, 1992 · Apt 6F
Open — Nov sent out - BHazardous
Properly repair the broken or defective counter balances windows in rear room 6 sty southeast apt 6f , section '' ''
Aug 11, 1992 · Apt 6F
Open — Nov sent out - BHazardous
Repair the leaky and/or defective water supply pipe wasteline kitchen sink 6 sty southwest apt 6f , section '' ''
Aug 11, 1992 · Apt 6F
Open — Nov sent out - ANon-hazardous
Refit door entrance to bathroom 6 sty southeast apt 6f , section '' ''
Aug 11, 1992 · Apt 6F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall center room 6 sty southeast apt 6f , section '' ''
Aug 11, 1992 · Apt 6F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling & walls of bathroom & front & rear foyers 6 sty southeast apt 6f , section '' ''
Aug 11, 1992 · Apt 6F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls inside closet center room 2 sty apt 2e , section '' ''
Sep 10, 1991 · Apt 2E
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective 2 sty apt 2e warran , section '' ''
Sep 10, 1991 · Apt 2E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls private hall 2 sty apt 2e , section '' ''
Sep 10, 1991 · Apt 2E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls bathroom 2 sty apt 2e , section '' ''
Sep 10, 1991 · Apt 2E
Open — Nov sent out - ANon-hazardous
Replace with new the missing door cabinet over sink kitchen 5 sty east apt 5f. , section '' ''
May 30, 1991 · Apt 5F
Open — Nov sent out - ANon-hazardous
Replace with new the missing door closet front private hall 5 sty east apt 5f. , section '' ''
May 30, 1991 · Apt 5F
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock installed entrance door 5 sty east apt 5f. , section '' ''
May 30, 1991 · Apt 5F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls & ceilings thru out 5 sty east apt 5f. , section '' ''
May 30, 1991 · Apt 5F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling bathroom 5 sty east apt 5f. , section '' ''
May 30, 1991 · Apt 5F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling center room 5 sty east apt 5f. , section '' ''
May 30, 1991 · Apt 5F
Open — Nov sent out
DOB building violations
34 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 29, 2020
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2017
Mar 27, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Sep 18, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Sep 18, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Mar 26, 2010
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Mar 26, 2010
Dob violation - dismissed - Construction other optional
Failure to maintain exteriir building wall; remedy; repair and replace damage and loose brick and mortar masonry forthwith
Oct 17, 2009
Dob violation - dismissed - Construction other optional
Failure to maintain exterior building wall: remedy; repair and replace defective masonry forthwith
Oct 17, 2009
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
ECB violations
15 ECB violations, newest first.
- Class - 3
In apt 3h=premire gas stove/oven red tagged + t valve shut by utility>ýgas leakage¨; 27-misc, comply with code; correct violation+submit certificate of correction
May 23, 2024 · Penalty $500
Resolve - Class - 2
Failure to submit an acceptable required cycle 9b report critical of examination documenting condition of exterior wall abd appurtenances required by 28-302.4 for control #910201. remedy: submit acceptable requ
Apr 11, 2024 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 9b report critical of examination documenting condition of exterior wall abd appurtenances required by 28-302.4 for control #910202. remedy: submit acceptable requ
Apr 11, 2024 · Penalty $1,250
Resolve - Class - 2
Bc3308.5 failure to maintain vert safety netting system in codecompliant.atoi of 2stynb under const,i observed vert safety netting@2fl&roof w/following conditions:nets loose in multiple areas cables loose/not t
May 17, 2022 · Penalty $3,125
Resolve - Class - 3
53-k-11/40-d-06/39-k-10/64-m-07/70-z-10/70-k-10/40-d-smoke grate/64-m-machine/70-z-serious water condition
Aug 10, 2011
Resolve - Class - 3
64-m-07/53-k-11/39-k-10/70-z-10/70-k-10/64-m-machine/70-m-pit steel,correct serious water condition!
Aug 10, 2011
Resolve - Class - 2
Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedial repa
Jul 16, 2010
Resolve - Class - 2
Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedial repa
Jul 16, 2010
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations rem:
Jan 7, 2010
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations rem:
Jan 7, 2010
Resolve - Class - 2
Fail to maintain exteiror bldg cracks & excavating in parapet concreteoverhang in the east elevation, blocks of wood under a.c units & projecting from facade. south elevation show cracks in parapet concrete ove
Dec 30, 2009
Resolve - Class - 2
Fail to maintain exterior bldg west elevation observe cracks & separating in parapet concrete overhang. south elevation observe cracks & separating in parapet concrete overhang; deteriorating & swelling in shel
Dec 30, 2009
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations
Apr 24, 2009
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations
Apr 24, 2009
Resolve - Hazardous
Failure to maintain exterior of building facade isues- i west/south elevation; cracks in bricks and roof overhang. ii. south and east elevation, extensive bulging and cracks in shelf angels; verticals cracks in
May 14, 2003
Resolve